CN202570451U - Cooled central cylinder - Google Patents

Cooled central cylinder Download PDF

Info

Publication number
CN202570451U
CN202570451U CN 201220109370 CN201220109370U CN202570451U CN 202570451 U CN202570451 U CN 202570451U CN 201220109370 CN201220109370 CN 201220109370 CN 201220109370 U CN201220109370 U CN 201220109370U CN 202570451 U CN202570451 U CN 202570451U
Authority
CN
China
Prior art keywords
central cylinder
central tube
cooled
cooled central
type pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220109370
Other languages
Chinese (zh)
Inventor
陈旭东
殷建利
邱小钢
王炜
蔡炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Nengda Huawei Equipment Co Ltd
Original Assignee
Hangzhou Nengda Huawei Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Nengda Huawei Equipment Co Ltd filed Critical Hangzhou Nengda Huawei Equipment Co Ltd
Priority to CN 201220109370 priority Critical patent/CN202570451U/en
Application granted granted Critical
Publication of CN202570451U publication Critical patent/CN202570451U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cyclones (AREA)

Abstract

The utility model relates to a cooled central cylinder, in particular to a central cylinder for a circulating fluidized bed separator, and belongs to the technical field of cooling devices. A central cylinder of an existing circulating fluidized bed separator mainly is made from alloy steel hanging board material. The central cylinder is positioned in the condition that the temperature of the smoke is high, smoke flow velocity is high, and the concentration of particulate matter is large, so that problems that wear resistance is poor, the service life is not long, and the transformation is serious are caused, so that the efficiency of the circulating fluidized bed boiler is low, the tail wear is serious, the combustion is instable, and a plurality of parameters can not meet the requirement of the design parameters. The cooled central cylinder is formed by a U shaped tube which can conduct heat exchange, the temperature of the metal of the central cylinder is effectively reduced, all the performances of the metal can be improved, and refractory and wear-resistant castable is attached on the peripheral surface of the metal at the same time, so that the problems of central cylinder transform and short service life can be thoroughly resolved.

Description

The cooled central tube
[technical field]
The utility model is a kind of cooled central tube, and the central tube of cyclone separator belongs to the cooling device field in particularly a kind of circulating fluid bed garbage furnace, the circulating fluidized bed combustion coal stove.
[background technology]
Cyclone separator is very important parts in CFBB, and the critical piece of cyclone separator is a central tube.The effect of cyclone separator is that thickness material in the flue gas of from boiler, discharging is separated.Thick material returns combustion chamber continuation participation burning as a kind of fluidisation carrier and heat carrier.Thin material carries out being discharged by chimney after treatment after the heat exchange with flue gas.Central tube in China's cyclone separator of circulating fluidized bed boiler mainly uses the link plate formula now, and the material of link plate is a steel alloy.Central tube is in flue-gas temperature height, flue gas flow rate is fast, particle concentration the is big running environment; Central tube because cause under rugged environment that it is not wear-resisting, service life is long, distortion is serious, thereby cause the efficient of CFBB on the low side, afterbody serious wear, combustion instability, parameters do not reach design load.
[utility model content]
Be prone to problems such as not wear-resisting, that service life is not long, distortion is serious in order to overcome existing steel alloy central tube; It is a kind of by the cooled central tube that is made up of U type pipe that can carry out heat exchange that the utility model provides; Reduced the temperature of central tube effectively; Improve each item performance, on wall inside and outside the central tube barrel, laid the fire-resistant abrasion-proof pouring material simultaneously, thoroughly solved the problem that central tube is out of shape and service life is short.For this reason, the utility model adopts following technical scheme:
The cooled central tube; Comprise inlet header case and outlet collection case, it is characterized in that: also comprise some U type pipes of being processed by Heat Conduction Material, each U type pipe compartment of terrain is located on the same circumference and surrounds the formation tubular; A mouth of pipe of U type pipe is communicated with the inlet header case, and another mouth of pipe is communicated with outlet collection case.Cooling medium flows out from the inlet header case, through U type pipe, U type pipe is cooled off laggard inlet/outlet collection case.Previous designs has reduced the temperature of central tube effectively, has improved each item performance of central tube.
The cooled central tube is characterized in that: be connected to form cylindrical wall with sheet material between described each U type pipe.Previous designs can improve the integral rigidity of cooled central tube, prevents the central tube distortion, guarantees the separative efficiency of separator.
The cooled central tube is characterized in that: the described cylindrical wall outside and inboard are provided with Fire and abrasion resistant material.Arranged outside Fire and abrasion resistant material in cylindrical wall can prevent the barrel wearing and tearing and reduce caloric receptivity, can effectively solve the problem that central tube is out of shape and service life is short.
The cooled central tube is characterized in that: described cylindrical wall arranged outside has some annular comb plate, comb joints.Annular comb plate, comb joint is set, makes U type tube bank fixed-site, avoid distortion.
The cooled central tube is characterized in that: each U type pipe evenly distributes.U type pipe evenly distributes, and each pipe is heated evenly, avoids occurring being heated the inhomogeneous device damage phenomenon that occurs.
The cooled central tube that the utility model provides; Through improving structural design; Reduce the central tube self-temperature, improved the antiwear property of central tube, improved the non-deformability of central tube; Effectively solve wearing and tearing, the problem on deformation of existing central tube, and then solved not long problem in service life.Guarantee the continous-stable operation of boiler, improved the combustion stability of boiler, heat-economy, guaranteed that the separative efficiency of cyclone separator has alleviated the wearing and tearing of back-end surfaces, thoroughly solved cyclone separator central tube maintenance replacing problem.
[description of drawings]
Fig. 1 is a cooled central tube structural representation.
Fig. 2 is a cooled central tube vertical view.
Among the figure, 1. inlet header case; 2. outlet collects case; 3.U type pipe; 4. annular comb plate, comb joint; 5. sheet material.
[specific embodiment]
Be further described below in conjunction with Figure of description and the specific embodiment substantive distinguishing features the utility model.
Cooled central tube as illustrated in figs. 1 and 2 comprises inlet header case 1, outlet collection case 2, U type pipe 3, annular comb plate, comb joint 4, sheet material 5.Inlet header case 1 is the annulated column shape of same specification size with outlet collection case 2, and inlet header case 1 is installed in outlet collection upper box part.Each U type pipe 3 compartment of terrain is located on the same circumference and surrounds the formation tubular, and 3 of each U type pipes connect with sheet material 5, and U type pipe 3 is encircled into cylindrical shape with sheet material 5 on circumference.Each component materials is chosen according to actual operating position in the cooled central tube; U type pipe 3 materials and sheet material 5 materials are the boiler steel material in the instance; U type pipe 3 all is equipped with certain thickness fire-resistant abrasion-proof pouring material with the barrel outside and inboard that sheet material 5 constitutes, and pouring material is fixed on above the barrel through pressgang able-bodied men, pin etc.The cooled central tube barrel outside that is encircled into by U type pipe 3 and sheet material 5 equidistantly is provided with three annular comb plate, comb joints 4.A mouth of pipe of U type pipe 3 is communicated with inlet header case 1, and another mouth of pipe is communicated with outlet collection case 2.Cooling medium flows out from inlet header case 1 and gets into U type pipe 3, carries out heat exchange with U type pipe 3, and cooling U type pipe 3 backs flow into outlet collection case 2.In the utility model, cooling medium is a cooling water, and cooling water can be appointed and got, but needs to consider mobilization dynamic and physical device deployment scenarios, and cooling water is taken from economizer exit in this instance.The cooled central tube is whole to be articulated in the cyclone separator, and entire connection portion is wrapped up with pouring material.The cooled central tube arranges that according to the cyclone separator number a plurality of central tubes calculate according to heating power can select series, parallel.Select series connection in this instance.

Claims (5)

1. cooled central tube; Comprise inlet header case (1) and outlet collection case (2); It is characterized in that: also comprise some U type pipes (3) of processing by Heat Conduction Material; Each U type pipe (3) compartment of terrain is located on the same circumference and surrounds the formation tubular, and a mouth of pipe of U type pipe (3) is communicated with inlet header case (1), and another mouth of pipe is communicated with outlet collection case (2).
2. cooled central tube according to claim 1 is characterized in that: be connected to form cylindrical wall with sheet material (5) between described each U type pipe (3).
3. cooled central tube according to claim 2 is characterized in that: the described cylindrical wall outside and inboard are provided with Fire and abrasion resistant material.
4. cooled central tube according to claim 2 is characterized in that: described cylindrical wall arranged outside has some annular comb plate, comb joints (4).
5. according to claim 3 or 4 described cooled central tubes, it is characterized in that: each U type pipe (3) evenly distributes.
CN 201220109370 2012-03-15 2012-03-15 Cooled central cylinder Expired - Fee Related CN202570451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220109370 CN202570451U (en) 2012-03-15 2012-03-15 Cooled central cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220109370 CN202570451U (en) 2012-03-15 2012-03-15 Cooled central cylinder

Publications (1)

Publication Number Publication Date
CN202570451U true CN202570451U (en) 2012-12-05

Family

ID=47239905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220109370 Expired - Fee Related CN202570451U (en) 2012-03-15 2012-03-15 Cooled central cylinder

Country Status (1)

Country Link
CN (1) CN202570451U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103791491A (en) * 2014-02-17 2014-05-14 无锡锡能锅炉有限公司 Water cooling coil pipe type central barrel of circulating fluidized bed boiler
CN104259018A (en) * 2014-10-31 2015-01-07 南宁市英德肥业有限责任公司 Multistage cyclone separator recovery device
CN105465776A (en) * 2015-12-24 2016-04-06 哈尔滨锅炉厂有限责任公司 Fixing device and method for central cylinder of boiler of circulating fluid bed (CFB)
CN106524140A (en) * 2016-11-25 2017-03-22 上海锅炉厂有限公司 Steam-cooled cyclone separator of center barrel structure
CN106733244A (en) * 2017-02-13 2017-05-31 中聚信海洋工程装备有限公司 A kind of center cylinder of cyclone separator of air cooling heat transferring
CN107575857A (en) * 2017-09-15 2018-01-12 内蒙古京泰发电有限责任公司 A kind of CFBB air cooling membrane type central tube
CN109958995A (en) * 2017-12-25 2019-07-02 中国科学院工程热物理研究所 Cooled central tube

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103791491A (en) * 2014-02-17 2014-05-14 无锡锡能锅炉有限公司 Water cooling coil pipe type central barrel of circulating fluidized bed boiler
CN104259018A (en) * 2014-10-31 2015-01-07 南宁市英德肥业有限责任公司 Multistage cyclone separator recovery device
CN105465776A (en) * 2015-12-24 2016-04-06 哈尔滨锅炉厂有限责任公司 Fixing device and method for central cylinder of boiler of circulating fluid bed (CFB)
CN105465776B (en) * 2015-12-24 2018-04-24 哈尔滨锅炉厂有限责任公司 Fixing device and fixing means for CFB boiler central tube
CN106524140A (en) * 2016-11-25 2017-03-22 上海锅炉厂有限公司 Steam-cooled cyclone separator of center barrel structure
CN106733244A (en) * 2017-02-13 2017-05-31 中聚信海洋工程装备有限公司 A kind of center cylinder of cyclone separator of air cooling heat transferring
CN106733244B (en) * 2017-02-13 2023-05-12 中聚信海洋工程装备有限公司 Cyclone separator center tube for air cooling and heat exchange
CN107575857A (en) * 2017-09-15 2018-01-12 内蒙古京泰发电有限责任公司 A kind of CFBB air cooling membrane type central tube
CN109958995A (en) * 2017-12-25 2019-07-02 中国科学院工程热物理研究所 Cooled central tube

Similar Documents

Publication Publication Date Title
CN202570451U (en) Cooled central cylinder
CN105164469B (en) Include the fluidized-bed combustion boiler of multifunctional inertia gravity separator
CN103836612B (en) A kind of Horizontal type circulating fluid bed superheated steam boiler
CN202511294U (en) Lower-heating value low-load garbage incineration waste heat boiler
CN103047643A (en) Energy-saving type circulating fluidized bed boiler for combusting lower-calorific value fuel
CN201463253U (en) Double-furnace horizontal type industrial pulverized coal fired boiler
CN211939020U (en) Preheating type ladle roaster
CN107940448A (en) A kind of pulverized coal particle recirculating fluidized bed combustion system and its combustion method
CN207230919U (en) A kind of chain grate hot-water boiler with boiler tail afterheat energy-saving environmental protecting device
CN208186327U (en) A kind of boiler with smoke folded angle separator
CN204217769U (en) A kind of grain drying fluid bed heat wind system
CN203893192U (en) Heat recovery device of garbage incinerator of circulating fluid bed
CN202485187U (en) Natural circulating hot water boiler structure
CN202938288U (en) Circulating fluidized bed boiler applied to high sodium coal and biomass fuel
CN205874472U (en) Weld contactless coal air preheater of formula fat pipe entirely
CN214619468U (en) Waste heat boiler for electric furnace
CN202993148U (en) Vertical waste heat boiler for waste incineration
CN202267056U (en) Circulating fluidized bed boiler
CN202813348U (en) Layer-burning boiler with internal two-stage dust collector
CN211853982U (en) Low-nitrogen environment-friendly circulating fluidized bed hot water boiler
CN102563852B (en) Forced circulation type hot water boiler structure
CN202485196U (en) Forced-circulation water boiler structure
CN203068495U (en) Burning biomass fluidized bed boiler
CN107940449A (en) A kind of boiler smoke folded angle separator
CN202598496U (en) Circulating fluidized bed boiler containing water-cooled cyclone separator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Hangzhou City, Zhejiang province 311101 Yuhang Qiaosi Triangle Zone Tong Village Road No. 66

Patentee after: Hangzhou Nengda Huawei Equipment Co., Ltd.

Address before: 310018, No. 10, No. 9, Xiasha economic and Technological Development Zone, Hangzhou, Zhejiang

Patentee before: Hangzhou Nengda Huawei Equipment Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20210315