高压线路雨雪天带电检修作业工器具传递装置 Download PDF

Info

Publication number
CN202564851U
CN202564851U CN 201220128873 CN201220128873U CN202564851U CN 202564851 U CN202564851 U CN 202564851U CN 201220128873 CN201220128873 CN 201220128873 CN 201220128873 U CN201220128873 U CN 201220128873U CN 202564851 U CN202564851 U CN 202564851U
Authority
CN
China
Prior art keywords
line
power transmission
rainy
voltage line
fixed pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220128873
Other languages
English (en)
Inventor
马兴誉
贾洪喜
张淼
黄忠泽
张念军
刘锋
冯海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Taiyuan Power Supply Co of Shanxi Electric Power Co
Original Assignee
Taiyuan Power Supply Co of Shanxi Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Power Supply Co of Shanxi Electric Power Co filed Critical Taiyuan Power Supply Co of Shanxi Electric Power Co
Priority to CN 201220128873 priority Critical patent/CN202564851U/zh
Application granted granted Critical
Publication of CN202564851U publication Critical patent/CN202564851U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种高压线路雨雪天带电检修作业工器具传递装置,解决了在检修高压输电线路时,由于传递工器具的绝缘绳索被打湿而容易导致带电,使传递工具过程容易发生短路事故的问题。包括在第一铁塔(1)与第二铁塔(2)之间设置有高压输电线路(3),在高压输电线路(3)上活动设置有定滑轮(4),在定滑轮(4)上活动设置有绝缘绳索(5),在绝缘绳索(5)的一端设置有第一绝缘子串(6),在绝缘绳索(5)的另一端设置有第二绝缘子串(8),在第一绝缘子串(6)与第二绝缘子串(8)之间的绝缘绳索(5)上活动设置被传递工器具(7)。本实用新型保证了雨雪天向高压线路传送工具的安全性,使检修高压线路工作不受天气因素的影响。

Description

高压线路雨雪天带电检修作业工器具传递装置
技术领域
 本实用新型涉及一种高压输电线路的施工设备,特别涉及一种向高压输电线路上运送工器具的传送装置。
背景技术
在对相邻铁塔之间的高压输电线路进行检修施工时,现场施工人员一般要爬到线路上进行有关作业,地面上的其他人员是通过吊在线路上的绝缘绳索为线路上的检修人员传递工具和器具。当检修遇到雨雪天时,由于传递工器具的绝缘绳索被打湿而容易导致带电,使传递工具过程容易发生短路事故,危及操作人员生命安全。
发明内容
 本实用新型提供了一种高压线路雨雪天带电检修作业工器具传递装置,解决了现有技术在检修高压输电线路遇到雨雪天时,由于传递工器具的绝缘绳索被打湿而容易导致带电,使传递工具过程容易发生短路事故的问题。
本实用新型是通过以下方案解决以上问题的:
一种高压线路雨雪天带电检修作业工器具传递装置,包括第一铁塔和第二铁塔,在第一铁塔与第二铁塔之间设置有高压输电线路,在高压输电线路上活动设置有定滑轮,在定滑轮上活动设置有绝缘绳索,在绝缘绳索的一端设置有第一绝缘子串,在绝缘绳索的另一端设置有第二绝缘子串,在第一绝缘子串与第二绝缘子串之间的绝缘绳索上活动设置被传递工器具。
定滑轮是通过一挂钩吊接在高压输电线路上的。
本实用新型保证了雨雪天向高压线路传送工具的安全性,使检修高压线路工作不受天气因素的影响。
附图说明
图1是本实用新型的结构示意图。
具体实施例
一种高压线路雨雪天带电检修作业工器具传递装置,包括第一铁塔1和第二铁塔2,在第一铁塔1与第二铁塔2之间设置有高压输电线路3,当检修工作人员在对带电的高压输电线路3进行检修时,地面人员可通过活动设置在线路上的定滑轮4和在定滑轮4上活动设置的绝缘绳索5为线路上的施工人员传递工器具,在绝缘绳索5的一端设置有第一绝缘子串6,在绝缘绳索5的另一端设置有第二绝缘子串8,在第一绝缘子串6与第二绝缘子串8之间的绝缘绳索5上活动设置被传递工器具7,这样就使被传递工器具7与高压线路处于同一电位,并通过第一绝缘子串6和第二绝缘子串8与地面人员绝缘。定滑轮4是通过一挂钩吊接在高压输电线路3上的,可方便被传送点在线路上的方便移动。本实用新型解决了雨雪天绝缘绳被打湿后带电使检修工作无法进行的难题,提高了检修效率。

Claims (2)

1.一种高压线路雨雪天带电检修作业工器具传递装置,包括第一铁塔(1)和第二铁塔(2),在第一铁塔(1)与第二铁塔(2)之间设置有高压输电线路(3),其特征在于,在高压输电线路(3)上活动设置有定滑轮(4),在定滑轮(4)上活动设置有绝缘绳索(5),在绝缘绳索(5)的一端设置有第一绝缘子串(6),在绝缘绳索(5)的另一端设置有第二绝缘子串(8),在第一绝缘子串(6)与第二绝缘子串(8)之间的绝缘绳索(5)上活动设置被传递工器具(7)。
2.根据权利要求1所述的一种高压线路雨雪天带电检修作业工器具传递装置,其特征在于,定滑轮(4)是通过一挂钩吊接在高压输电线路(3)上的。
CN 201220128873 2012-03-30 2012-03-30 高压线路雨雪天带电检修作业工器具传递装置 Expired - Lifetime CN202564851U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220128873 CN202564851U (zh) 2012-03-30 2012-03-30 高压线路雨雪天带电检修作业工器具传递装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220128873 CN202564851U (zh) 2012-03-30 2012-03-30 高压线路雨雪天带电检修作业工器具传递装置

Publications (1)

Publication Number Publication Date
CN202564851U true CN202564851U (zh) 2012-11-28

Family

ID=47214466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220128873 Expired - Lifetime CN202564851U (zh) 2012-03-30 2012-03-30 高压线路雨雪天带电检修作业工器具传递装置

Country Status (1)

Country Link
CN (1) CN202564851U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106129896A (zh) * 2016-07-26 2016-11-16 中国南方电网有限责任公司超高压输电公司柳州局 ±500kV同塔双回直流线路直线塔上极绝缘子串传递方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106129896A (zh) * 2016-07-26 2016-11-16 中国南方电网有限责任公司超高压输电公司柳州局 ±500kV同塔双回直流线路直线塔上极绝缘子串传递方法

Similar Documents

Publication Publication Date Title
CN204646309U (zh) 一种新型煤矿胶带机运输自动巡检系统
CN102623926B (zh) 远方等电位滑车及其实现带电进出等电位的方法
CN202564851U (zh) 高压线路雨雪天带电检修作业工器具传递装置
CN201466574U (zh) 用于等电位更换输电线路铁塔绝缘子及附件的装置
CN104836160B (zh) 一种输电线路绝缘子串检修传递滑车
CN204309624U (zh) 接触网短路试验接地装置
CN205157688U (zh) 一种高压电缆在线监测装置
CN203690799U (zh) 一种带电更换直线转角塔绝缘子串的装置
CN203932808U (zh) 带电更换绝缘子导线提升装置
CN203932831U (zh) 高空作业自动锁绳器
CN205882560U (zh) 配电带电作业地电位专用循环绳架装置
CN102447222A (zh) 一种隔离开关检修吊具
CN201705193U (zh) 一种更换绝缘子的专用软梯
CN204216485U (zh) 一种输电线路展线装置
CN203208568U (zh) 一种安全带挂具
CN201904572U (zh) 传递绳索用滑车
CN203402859U (zh) 塔机标准节电动引进装置
CN203288976U (zh) 隔离开关吊装装置
CN202729496U (zh) 一种升降机检修机构
CN104810747A (zh) 一种多用电力检修工具
CN201819790U (zh) 全身式安全带试验装置
CN204997885U (zh) 一种玻璃钢管脱模装置
CN204835361U (zh) 一种电力系统架线工作辅助设备
CN204992369U (zh) Gw4型隔离开关固定检修架
CN104064992A (zh) 带电作业射绳器

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TAIYUAN POWER SUPPLY COMPANY, SHANXI ELECTRIC POWE

Effective date: 20121107

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: TAIYUAN POWER SUPPLY COMPANY, SHANXI ELECTRIC POWER COMPANY

Effective date: 20121107

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 030012 TAIYUAN, SHAANXI PROVINCE TO: 100761 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20121107

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Patentee after: State Grid Corporation of China

Patentee after: Taiyuan Power Supply Company of Shanxi Electric Power Company

Address before: 030012 Shanxi Province, Taiyuan city and State Road No. 89

Patentee before: Taiyuan Power Supply Company of Shanxi Electric Power Company

CX01 Expiry of patent term

Granted publication date: 20121128

CX01 Expiry of patent term