大型电站接地网阻抗参数测量装置 Download PDFInfo
- Publication number
- CN202563012U CN202563012U CN2012201340295U CN201220134029U CN202563012U CN 202563012 U CN202563012 U CN 202563012U CN 2012201340295 U CN2012201340295 U CN 2012201340295U CN 201220134029 U CN201220134029 U CN 201220134029U CN 202563012 U CN202563012 U CN 202563012U
- Authority
- CN
- China
- Prior art keywords
- stake
- grounded screen
- power station
- voltage
- scale power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Measurement Of Resistance Or Impedance (AREA)
Abstract
本实用新型涉及一种大型电站接地网阻抗参数测量装置,包括电阻测量仪、电压桩、电流桩,所述的电压桩通过电流测试线连接电阻测量仪,所述的电流桩通过电流测试线连接电阻测量仪,电压桩和电流桩均插入大地,通过大地连接接地网。与现有技术相比,本实用新型具有准确度高、设备简单、测试时间短等优点。
Description
技术领域
本实用新型涉及一种阻抗测量装置,尤其是涉及一种大型电站接地网阻抗参数测量装置。
背景技术
在电力系统中为了工作和安全的需要,常需将电力系统及电气设备的某些部分与大地相连接,这在物理上被称为接地。接地的作用主要是防止人身遭受电击、设备和电力线路遭受损坏,预防雷击、防止静电和保障电力系统正常运行。从本质上讲,它的目的就是为了在正常和事故以及雷击情况下,利用大地作为接地电流回路的一个元件,将设备接地处固定为所允许的接地电位。
接地网起着工作接地和保护接地的作用,当接地电阻过大则发生接地故障时,使中性点电压偏移增大,可能使健全相和中性点电压过高,超过绝缘要求的水平而造成设备损坏,同时接地系统的接地电阻是否合格也直接关系到变电站运行人员、变电检修人员人身安全。近些年来,国内外有多个变电站因雷击形成扩大事故,多数与电站地网接地电阻参数不合格有关。
但由于土壤对接地装置具有腐蚀作用,随着运行时间的加长,接地装置慢慢会腐蚀,甚至会危害变电站的安全运行,因此必须大力加强对地网接地电阻的测量工作的重视。
通过试验实践,我们发现运行中变电站地网接地电阻的测量,由于受电力系统流入地网电流的干扰以及试验引线线间的干扰,会使得测试结果产生较大的误差。因此传统的工频法,根据国标规程要求试验电流不得小于50A,这就造成试验设备笨重、试验过程复杂、试验人员工作强度大、试验时间长等诸多问题。
实用新型内容
本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种准高、设备简单、测试时间短的大型电站接地网阻抗参数测量装置。
本实用新型的目的可以通过以下技术方案来实现:
一种大型电站接地网阻抗参数测量装置,包括电阻测量仪、电压桩、电流桩,所述的电压桩通过电流测试线连接电阻测量仪,所述的电流桩通过电流测试线连接电阻测量仪,电压桩和电流桩均插入大地,通过大地连接接地网。
所述的电压桩和电流桩位于接地网的同一侧。
所述的电流桩与接地网边缘的距离为接地网对角线长度的5倍,所述的电压桩与接地网边缘的距离为接地网对角线长度的3倍。
所述的电流测试线与电压测试线之间的间隔距离至少为1米。
与现有技术相比,本实用新型让电压测试线与电流测试线之间相距1米以上,有效避免了测试引线之间电磁耦合引起的干扰,有利于减小误差,提高试验的准确性,而且测试设备简单,可以有效的缩短测试时间,提高工作效率。
附图说明
图1为本实用新型的结构示意图。
具体实施方式
下面结合附图和具体实施例对本实用新型进行详细说明。
实施例
如图1所示,一种大型电站接地网阻抗参数测量装置,包括电阻测量仪1、电压桩2、电流桩4。电压桩2通过电流测试线3连接电阻测量仪1,电流桩4通过电流测试线5连接电阻测量仪1,电压桩2和电流桩3均插入大地,通过大地连接接地网6,电压桩2和电流桩4位于接地网6的同一侧,电流桩4与接地网6边缘的距离d2为接地网对角线长度D的5倍,电压桩2与接地网6边缘的距离d1为接地网对角线长度D的3倍,而且电流测试线5与电压测试线3之间的间隔距离保持在1米以上。本实用新型让电压测试线与电流测试线之间相距1米以上,有效避免了测试引线之间电磁耦合引起的干扰,有利于减小误差,提高试验的准确性,而且测试设备简单,可以有效的缩短测试时间,提高工作效率。
Claims (4)
1.一种大型电站接地网阻抗参数测量装置,其特征在于,包括电阻测量仪、电压桩、电流桩,所述的电压桩通过电流测试线连接电阻测量仪,所述的电流桩通过电流测试线连接电阻测量仪,电压桩和电流桩均插入大地,通过大地连接接地网。
2.根据权利要求1所述的一种大型电站接地网阻抗参数测量装置,其特征在于,所述的电压桩和电流桩位于接地网的同一侧。
3.根据权利要求2所述的一种大型电站接地网阻抗参数测量装置,其特征在于,所述的电流桩与接地网边缘的距离为接地网对角线长度的5倍,所述的电压桩与接地网边缘的距离为接地网对角线长度的3倍。
4.根据权利要求1所述的一种大型电站接地网阻抗参数测量装置,其特征在于,所述的电流测试线与电压测试线之间的间隔距离至少为1米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201340295U CN202563012U (zh) | 2012-03-31 | 2012-03-31 | 大型电站接地网阻抗参数测量装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201340295U CN202563012U (zh) | 2012-03-31 | 2012-03-31 | 大型电站接地网阻抗参数测量装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202563012U true CN202563012U (zh) | 2012-11-28 |
Family
ID=47212657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201340295U Expired - Lifetime CN202563012U (zh) | 2012-03-31 | 2012-03-31 | 大型电站接地网阻抗参数测量装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202563012U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105823931A (zh) * | 2016-03-14 | 2016-08-03 | 江西华强金源电气有限公司 | 一种新型测量接地装置电阻的有效方法 |
CN113325238A (zh) * | 2021-06-25 | 2021-08-31 | 重庆璀陆探测技术有限公司 | 接地网接地阻抗与腐蚀的一体化检测方法与系统 |
-
2012
- 2012-03-31 CN CN2012201340295U patent/CN202563012U/zh not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105823931A (zh) * | 2016-03-14 | 2016-08-03 | 江西华强金源电气有限公司 | 一种新型测量接地装置电阻的有效方法 |
CN113325238A (zh) * | 2021-06-25 | 2021-08-31 | 重庆璀陆探测技术有限公司 | 接地网接地阻抗与腐蚀的一体化检测方法与系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103323751B (zh) | 一种高压短电缆绝缘终端局部放电测试装置及使用方法 | |
CN104569608B (zh) | 一种基于冲击大电流下的冲击接地阻抗现场测量方法 | |
CN104155526A (zh) | 一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法 | |
WO2014173317A1 (zh) | 一种输电线路雷电电磁暂态动模实验系统 | |
CN104049158A (zh) | 一种用于输电线路单相瞬时人工接地短路试验系统 | |
CN104569671B (zh) | 一种换流站接地网直流分流系数测试方法 | |
CN204649859U (zh) | 一种输电线路过电压测量模拟试验平台 | |
CN205015377U (zh) | 一种用于电能表带电更换的绝缘固定装置 | |
CN202421353U (zh) | 配电网故障检测系统 | |
CN102735988B (zh) | 配电网单相接地故障定位方法 | |
CN103050907B (zh) | 一种直流输电系统共用接地极安全检修方法 | |
CN203275543U (zh) | 一种输电线路雷电电磁暂态动模实验系统 | |
CN107843784A (zh) | 一种利用地网回流的大型接地网高频特性测试方法 | |
CN202563012U (zh) | 大型电站接地网阻抗参数测量装置 | |
CN204028135U (zh) | 小型避雷器的拆装式检验装置 | |
CN206223915U (zh) | 一种双电流传感器的地线绝缘子放电监测装置 | |
CN107728024A (zh) | 一种利用地网回流的大型接地网冲击特性测试方法 | |
CN205103299U (zh) | 一种同塔双回路感应电压电流检测装置 | |
CN107153135A (zh) | 柱上配变接地网接地阻抗的测试方法 | |
CN204679591U (zh) | 一种基于电场法的线路避雷器状态带电检测装置 | |
CN205941700U (zh) | 一种安全监测的数字化接地极 | |
CN202502136U (zh) | 交流线路感应电压和感应电流测量装置 | |
CN105740500A (zh) | 一种复合杆塔过电压仿真模型设计方法 | |
CN102879649A (zh) | 一种接地电阻测量方法 | |
CN203166397U (zh) | 一种消除感应电压的电路结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20121128 |
|
CX01 | Expiry of patent term |