CN202562817U - Expansion instrument for measuring stress absorbability of asphalt mixture under negative pressure - Google Patents

Expansion instrument for measuring stress absorbability of asphalt mixture under negative pressure Download PDF

Info

Publication number
CN202562817U
CN202562817U CN2012201893433U CN201220189343U CN202562817U CN 202562817 U CN202562817 U CN 202562817U CN 2012201893433 U CN2012201893433 U CN 2012201893433U CN 201220189343 U CN201220189343 U CN 201220189343U CN 202562817 U CN202562817 U CN 202562817U
Authority
CN
China
Prior art keywords
support
stress absorption
asphalt
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201893433U
Other languages
Chinese (zh)
Inventor
李来宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai Road And Bridge Construction Group Co ltd
Original Assignee
XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO filed Critical XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority to CN2012201893433U priority Critical patent/CN202562817U/en
Application granted granted Critical
Publication of CN202562817U publication Critical patent/CN202562817U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model relates to an expansion instrument for measuring stress absorbability of an asphalt mixture under negative pressure. The expansion instrument solves the problems of no basis in design thickness of a stress absorption layer, realizes reasonable and scientific design thickness of the stress absorption layer, reduces wastes and ensures engineering safety. The technical scheme of the utility model is as follows: the expansion instrument structurally comprises a cylindrical hollow tube consisting of at least two pieces of arc-shaped steel plates and a radial expansion mechanism arranged in the hollow tube, and the arc-shaped steel plates are respectively connected with the power output end of the radial expansion mechanism in a positioning manner to form a radial expansion head. The expansion instrument disclosed by the utility model has the beneficial effect of solving the problem of no basis in the design thickness of the stress absorption layers of different asphalt mixtures. The expansion instrument disclosed by the utility model can be used for accurately measuring and calculating the crack widths of different sub-layers under the lowest temperature and the paved thickness of the stress absorption layers of different asphalt mixtures, thereby being capable of ensuring engineering safety, preventing material waste and saving investment.

Description

A kind of stress absorption ability is used under the asphalt subzero temperature support appearance that expands of measuring
Technical field
The utility model relates to the test of a kind of highway pavement material experiment, belongs to the industry of building the road, the particularly a kind of stress absorption ability is used under the asphalt subzero temperature support appearance that expands of measuring.
Background technology
The current highway road surface, the crack can appear in the road surface under the subzero temperature condition, is to cause the bad one of the main reasons of damage by water.The crack that the road surface produces under the subzero temperature is in the majority with sub-surface cracking reflection crack again, solves an effective way in road reflection crack, is that stress absorbing layer is set under top course, sponge under the subzero temperature reflection crack from basic unit, thereby it is bad to reduce damage by water.And that stress absorbing layer need design is how thick, is that the different road material is also different with the stress absorption layer thickness of subzero temperature condition needs by the material decision of the fracture width of subzero temperature condition sub-layer and stress absorbing layer.If stress absorbing layer is too thick; The effect that solves the roadbed reflection crack is no doubt good, but cost is too high, if the stress absorbing layer laying is too thin; Do not reach the effect that absorbs stress again; Therefore, the materials amount of reasonable proof stress absorption layer under different road environments makes the design of stress absorbing layer reach the technical matters that most economical safest degree becomes the industry urgent need solution of building the road now.
Summary of the invention
The utility model is not have the problem of foundation in order to solve the Thickness Design of stress absorbing layer in the prior art; Designed a kind of bloated appearance of support that the stress absorption ability is used under the asphalt subzero temperature of measuring; Can obtain the stress absorption ability of different pitches compound exactly through this instrument; Can calculate the stress absorbing layer design thickness easily, be implemented in the materials amount of reasonable proof stress absorption layer under the different road environments, make the design of stress absorbing layer reach most economical safest degree.
The utility model for realizing the technical scheme that the foregoing invention purpose adopts is; A kind of stress absorption ability is used under the asphalt subzero temperature support appearance that expands of measuring; Above-mentioned support is expanded and to be comprised the cylindricality hollow tubular is made up of at least two curved plates in the structure of appearance, be arranged on radially support in the hollow tubular mechanism of expanding, and curved plate is located by connecting and forms the bloated head of radially support with the expand clutch end of mechanism of support radially respectively.
The beneficial effect of the utility model is: solved the problem that highway pavement stress absorbing layer design thickness does not have accurate foundation for a long time.The invention of this instrument can be measured different pitches compound crack the ratio of width to height under the subzero temperature condition exactly, calculates the stress absorption ability of asphalt, thereby carries out the stress absorbing layer Thickness Design exactly; Like this; Can guarantee engineering safety, prevent waste of material again, reduce investment outlay.
Below in conjunction with accompanying drawing the utility model is elaborated.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the structural representation that radially supports the head that expands in the utility model.
Among the figure, 1 represents curved plate, and 2 represent hydraulic cylinder, and 3 represent hydraulic stem, and 4 represent the flat-top screw, and 5 represent hydraulic pump, and 6 represent connecting pipe.
Embodiment
Referring to Fig. 1; A kind of stress absorption ability is used under the asphalt subzero temperature support appearance that expands of measuring; Its key is: above-mentioned support is expanded and to be comprised the cylindricality hollow tubular is made up of at least two curved plates 1 in the structure of appearance, be arranged on radially support in the hollow tubular mechanism of expanding, and curved plate 1 is located by connecting and forms the bloated head of radially support with the expand clutch end of mechanism of support radially respectively.
Above-mentioned radially support is expanded and is comprised hydraulic pump 5 in the structure of mechanism, is arranged on the hydraulic cylinder 2 in the cylindricality hollow tubular of being made up of curved plate 1 and radially evenly distributes and be arranged on one group of interior hydraulic stem 3 of hydraulic cylinder 2 along the cylindricality hollow tubular; The clutch end of hydraulic stem 3 is located by connecting by supporting coupling assembling and curved plate 1 respectively, and the output terminal of hydraulic pump 5 is connected with hydraulic cylinder 2 by connecting pipe 6.
Offer deep gouge on the above-mentioned curved plate 1, described coupling assembling is flat-top screw 4 or sunk screw.
Above-mentioned hollow tubular is made up of 2 ~ 6 curved plates 1.
The utility model is purchased hydraulic hand-pump or electric hydraulic pump 5 when concrete the use, connecting pipe 4 is a flexible pipe, and hydraulic cylinder 2 has bidirectional hydraulic bar or the relative hydraulic stem of four direction.Utilize wall thickness 5mm-8mm pipe to be cut into 2 lobes or 4 lobes, scrape sliding or wash the smooth curved plate 1 of processing, auger shell hole on curved plate 1 is fastened on curved plate 1 respectively on the hydraulic stem 3 on the hydraulic cylinder with screw, the support that promptly becoming to expand can the contract head that expands.The annular asphalt stress absorption test block that completes is put into test freeze cabinet,, hydraulic hose is penetrated refrigerator-freezer in the perforate of refrigerator-freezer wall; Hydraulic pump is outside refrigerator-freezer, and support is expanded head in cabinet, the bloated head of support is put into the endoporus of ring specimen; The internal diameter of endoporus and support are expanded, and the minimum outer diameter of cylindricality hollow tubular equates that cabinet temperature to project location minimum temperature is frozen in adjustment in the head, when in definite refrigerator-freezer during the deep colling of annular asphalt stress absorption test block; Can exert pressure to the bloated head of support; The bloated head of support struts annular asphalt stress absorption test block, and the internal diameter of annular asphalt stress absorption test block is strutted, the crack, and extends the crack to the external diameter direction.Take out test block; Length h with vernier caliper measurement annular asphalt stress absorption test block endoporus fracture width d and crack are extended by interior radial outer diameter then can confirm the length h that the stress absorption ability P=endoporus fracture width d/ crack of this asphalt under the subzero temperature condition of regulation extended by interior radial outer diameter.When learning through investigation; The sub-layer of certain material; When the maximum crack width under minimum temperature is L; Known the stress absorption ability of used asphalt, then the stress absorption layer thickness of design is H=L/P, and promptly H is the stress absorption layer thickness that on the sub-layer of certain material, need design the asphalt of this kind material grating of laying.

Claims (4)

1. measure the bloated appearance of support that the stress absorption ability is used under the asphalt subzero temperature for one kind; It is characterized in that: described support is expanded and to be comprised the cylindricality hollow tubular is made up of at least two curved plates (1) in the structure of appearance, be arranged on radially support in the hollow tubular mechanism of expanding, and curved plate (1) is located by connecting and forms the bloated head of radially support with the expand clutch end of mechanism of support radially respectively.
2. a kind of bloated appearance of support that the stress absorption ability is used under the asphalt subzero temperature of measuring according to claim 1; It is characterized in that: described radially support is expanded and to be comprised hydraulic pump (5) in the structure of mechanism, be arranged on the hydraulic cylinder (2) in the cylindricality hollow tubular of being made up of curved plate (1) and radially evenly distribute and be arranged on the interior one group of hydraulic stem (3) of hydraulic cylinder (2) along the cylindricality hollow tubular; The clutch end of hydraulic stem (3) is located by connecting by supporting coupling assembling and curved plate (1) respectively, and the output terminal of hydraulic pump (5) is connected with hydraulic cylinder (2) by connecting pipe (6).
3. a kind of bloated appearance of support that the stress absorption ability is used under the asphalt subzero temperature of measuring according to claim 2, it is characterized in that: described curved plate offers deep gouge on (1), and described coupling assembling is flat-top screw (4) or sunk screw.
4. a kind of bloated appearance of support that the stress absorption ability is used under the asphalt subzero temperature of measuring according to claim 1, it is characterized in that: described hollow tubular is made up of 2 ~ 6 curved plates (1).
CN2012201893433U 2012-04-28 2012-04-28 Expansion instrument for measuring stress absorbability of asphalt mixture under negative pressure Expired - Lifetime CN202562817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201893433U CN202562817U (en) 2012-04-28 2012-04-28 Expansion instrument for measuring stress absorbability of asphalt mixture under negative pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201893433U CN202562817U (en) 2012-04-28 2012-04-28 Expansion instrument for measuring stress absorbability of asphalt mixture under negative pressure

Publications (1)

Publication Number Publication Date
CN202562817U true CN202562817U (en) 2012-11-28

Family

ID=47212462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201893433U Expired - Lifetime CN202562817U (en) 2012-04-28 2012-04-28 Expansion instrument for measuring stress absorbability of asphalt mixture under negative pressure

Country Status (1)

Country Link
CN (1) CN202562817U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106018463A (en) * 2016-05-31 2016-10-12 深圳市市政设计研究院有限公司 Evaluation method for low temperature crack resistance of asphalt

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106018463A (en) * 2016-05-31 2016-10-12 深圳市市政设计研究院有限公司 Evaluation method for low temperature crack resistance of asphalt
CN106018463B (en) * 2016-05-31 2017-06-30 深圳市市政设计研究院有限公司 A kind of evaluation method of pitch crack resistance at low-temperature

Similar Documents

Publication Publication Date Title
CN203403438U (en) Inspection well cover with protective construction die ring
CN202660067U (en) Waterproof sleeve preventing wall body leakage
Li et al. Field performance of large section concrete pipes cracking during jacking in Chongqing–A case study
CN202562817U (en) Expansion instrument for measuring stress absorbability of asphalt mixture under negative pressure
CN202247832U (en) Portable sounding machine
CN104179353B (en) Concrete pumping pipe heat sink and cool-down method thereof under high temperature
Wang et al. Analyze on development prospects of 300m level ultra-high CFRD from Shuibuya high CFRD
CN208668462U (en) A kind of pipe gallery supporting structure
CN217399861U (en) Underground engineering support bracket
CN206479161U (en) Bar code level ruler support
CN102677568B (en) Method for reasonably controlling thickness of stress absorbing layer of pavement in area
CN204703051U (en) Steel corrugated sheet Combined concrete cross section arch bridge is contained
CN205209498U (en) Fixing device of total powerstation prism
CN201180869Y (en) Polythene steel strip reinforced hollow winding structure wall pipes
CN107036588A (en) Tunnel surrounding rock displacement monitors point equipment
CN203498726U (en) Steel slag water permeable brick
CN207331390U (en) A kind of corrugated steel pipe ventilated embankment structure
Chunshan et al. Selection of reasonable scheme of entering into a working well in shield construction
RU141336U1 (en) JAWLESS MONOLITHIC ROOF
Wei et al. Application of a new thermal insulation layer to subgrade
CN210834589U (en) Device for testing permeability of filter element
CN202882421U (en) Novel water-sealing screw
CN107778029A (en) The concrete curing method of pipe laying in structure
CN207512798U (en) The empty accurate survey tool of stake
CN201811837U (en) Thrust stand of pipeline fixing joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 054001 Xingtai road and Bridge Construction Corporation, No. 79, Gaozhuang Bridge Road, Qiaodong District, Xingtai City, Hebei Province

Patentee after: Xingtai road and Bridge Construction Group Co.,Ltd.

Address before: 054001 Xingtai road and Bridge Construction Corporation, No. 79, Gaozhuang Bridge Road, Qiaodong District, Xingtai City, Hebei Province

Patentee before: XINGTAI ROAD & BRIDGE CONSTRUCTION GENERAL Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20121128

CX01 Expiry of patent term