CN202561256U - Pipe installation device with grouting function - Google Patents

Pipe installation device with grouting function Download PDF

Info

Publication number
CN202561256U
CN202561256U CN2012201085075U CN201220108507U CN202561256U CN 202561256 U CN202561256 U CN 202561256U CN 2012201085075 U CN2012201085075 U CN 2012201085075U CN 201220108507 U CN201220108507 U CN 201220108507U CN 202561256 U CN202561256 U CN 202561256U
Authority
CN
China
Prior art keywords
pipe
grouting
installation device
pipe installation
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201085075U
Other languages
Chinese (zh)
Inventor
宋玉喜
胡庆耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU JINENG ENVIRONMENT ENERGY TECHNOLOGY CO., LTD.
Original Assignee
SUZHOU JINENG ENVIRONMENT ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU JINENG ENVIRONMENT ENERGY TECHNOLOGY Co Ltd filed Critical SUZHOU JINENG ENVIRONMENT ENERGY TECHNOLOGY Co Ltd
Priority to CN2012201085075U priority Critical patent/CN202561256U/en
Application granted granted Critical
Publication of CN202561256U publication Critical patent/CN202561256U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a pipe installation device with a grouting function. The pipe installation device comprises a pipe installation device body and is characterized in that: one end of the pipe installation device body is provided with a head, the other end of the pipe installation device is provided with a grouting hole, a right side of the grouting hole is provided with a drill rod connecting part, and a pipe clamping device is arranged above the pipe installation device body which is hollow. When installing a pipe, the pipe clamping device is automatically opened and can firmly fixes a U type head to prevent the slipping of the U type head, that the U type head is automatically folded and withdrawn is ensured so as to reduce friction with a pipe wall and prevent damage of the pipe wall or pulling out of a pipe clamp, at the same of pulling back, the drill rod carries out grouting outward, slurry is penetrated into underground soil through the grouting hole, a speed of pipe installation is raised, the security of a well wall is ensured, a grouting position is directly reached, carrying out pipe laying and grouting at the same time is realized, the security of a project is ensured, and work efficiency is raised.

Description

The following pipe arrangement of band grouting function
Technical field
The utility model relates to the following pipe arrangement that a kind of subterranean pipe line is laid the band grouting function of grouting.
Background technique
The Along with people's harm understanding that rising brings to global temperatures is more and more clearer, and people seek the whole bag of tricks to reduce the discharging of people to the atmospheric heat energy, and earth source heat pump is exactly one of them; In recent years; The earth source heat pump development is rapid, but in the construction of earth source heat pump, has some problems; The existence of these problems reduces the speed of application and the safety reliability of ground pipe laying; Subterranean pipe line is laid the back can cause pipeline out of position in grouting again, can cause slurries not reach particular location as irritating down from ground, and cause grouting to be failed.
Summary of the invention
The utility model provides a kind of convenience and tubing and the following pipe arrangement of the band grouting function of grouting simultaneously.
The technological scheme of the utility model provides a kind of following pipe arrangement with the grouting function; Comprise pipe device main body down; It is characterized in that: said pipe device main body one end down is provided with the device head, and the said pipe device main body the other end down is provided with grout hole, and said grout hole right side is provided with the drilling rod connected element; Said pipe device main body down top is provided with the card pipe arrangement, and said pipe device main body down is a hollow.
After adopting said structure, be characterized in: under when managing, the card pipe arrangement is opened water pipe U type elbow is stuck between card pipe arrangement and the following pipe device main body; And between card pipe arrangement and the following pipe device main body angle being arranged, this angle can prevent that the card pipe arrangement inserts pipe under the borehole wall obstruction in following pipe way, and drilling rod is inserted the drilling rod connected element; After the following pipe arrangement of band grouting function is delivered to perpendicularly buried pipe the pipe well bottom; The following pipe arrangement of the band grouting function of upwards pulling back, this moment, water pipe can come off downwards between card pipe arrangement and following pipe device main body automatically, and the card pipe arrangement is because of receiving the grazing of borehole wall earth on every side; Pipe device main body is drawn close pipe device main body under the indentation downwards.Like this, when pulling back, the following pipe arrangement of band grouting function just can not damage tube wall, is airflow design because of card pipe arrangement top again; When pulling back, also can pipe clamp not taken out of, and pull back simultaneously, drilling rod is in the milk to the outside; Slurries are penetrated in the underground through grout hole, have improved the speed of time pipe, have ensured the safety of the borehole wall; And directly reach the grouting position, realized pipe laying and be in the milk carrying out simultaneously, guaranteed the safety of engineering and improved working efficiency.
Description of drawings:
Below in conjunction with accompanying drawing and case study on implementation the utility model is described further.
Fig. 1 is the structural representation of the utility model.
Among the figure: 1. descend pipe device main body, 2. the device head, 3. grout hole, 4. the drilling rod connected element, 5. the card pipe arrangement.
Embodiment:
The technological scheme of the utility model as shown in Figure 1 provides a kind of following pipe arrangement with the grouting function; Comprise pipe device main body 1 down; Said pipe device main body 1 one ends down are provided with device head 2, and said pipe device main body 1 the other end down is provided with grout hole 3, and said grout hole 3 right sides are provided with drilling rod connected element 4; Said pipe device main body 1 top down is provided with card pipe arrangement 5, and said pipe device main body 1 down is a hollow.
After adopting said structure, be characterized in: under when managing, card pipe arrangement 5 is opened water pipe U type elbow is stuck between card pipe arrangement 5 and the following pipe device main body 1; And between card pipe arrangement 5 and the following pipe device main body 1 angle being arranged, this angle can prevent that card pipe arrangement 5 inserts pipe under the borehole wall obstruction in following pipe way, and drilling rod is inserted drilling rod connected element 4; After the card pipe arrangement 5 of area grouting function is delivered to perpendicularly buried pipe the pipe well bottom; The following pipe arrangement of the area grouting function of upwards pulling back, this moment, water pipe can come off downwards between card pipe arrangement 5 and following pipe device main body 1 automatically, and card pipe arrangement 5 is because of receiving the grazing of borehole wall earth on every side; Pipe device main body 1 is drawn close pipe device main body 1 under the indentation downwards.Like this, the following pipe arrangement of band grouting function just can not damage tube wall when pulling back, and is airflow design because of card pipe arrangement 5 again; When pulling back, also can pipe clamp not taken out of, and pull back simultaneously, drilling rod is in the milk to the outside; Slurries are penetrated in the underground through grout hole 3, have improved the speed of time pipe, have ensured the safety of the borehole wall; And directly reach the grouting position, realized pipe laying and be in the milk carrying out simultaneously, guaranteed the safety of engineering and improved working efficiency.

Claims (2)

  1. One kind with grouting function following pipe arrangement; Comprise pipe device main body (1) down; It is characterized in that: said pipe device main body (1) one end down is provided with device head (2); Said pipe device main body (1) the other end down is provided with grout hole (3), and said grout hole (3) right side is provided with drilling rod connected element (4), and said pipe device main body (1) top down is provided with card pipe arrangement (5).
  2. 2. according to the said a kind of following pipe arrangement with the grouting function of claim 1, it is characterized in that: said pipe device main body (1) down is a hollow.
CN2012201085075U 2012-03-21 2012-03-21 Pipe installation device with grouting function Expired - Fee Related CN202561256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201085075U CN202561256U (en) 2012-03-21 2012-03-21 Pipe installation device with grouting function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201085075U CN202561256U (en) 2012-03-21 2012-03-21 Pipe installation device with grouting function

Publications (1)

Publication Number Publication Date
CN202561256U true CN202561256U (en) 2012-11-28

Family

ID=47210915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201085075U Expired - Fee Related CN202561256U (en) 2012-03-21 2012-03-21 Pipe installation device with grouting function

Country Status (1)

Country Link
CN (1) CN202561256U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606805A (en) * 2012-03-21 2012-07-25 苏州际能环境能源技术有限公司 Tube downing device with grouting function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606805A (en) * 2012-03-21 2012-07-25 苏州际能环境能源技术有限公司 Tube downing device with grouting function

Similar Documents

Publication Publication Date Title
CN103047951B (en) Method for installing multipoint extensometer for detecting displacement at deep part of surrounding rock
WO2012142543A3 (en) System and method for coupling an impregnated drill bit to a whipstock
CN102587380A (en) Construction method for wholly removing drilling pile head
CN204984343U (en) Split combined type bag hole sealing device
US9564748B2 (en) Inclined conductor device
US8444346B2 (en) Method of installing geothermal heat pump system and device for installation
CN202561256U (en) Pipe installation device with grouting function
CN103742098B (en) A kind of colliery Di Chou lane layer-through drilling return slag hole sealing device and method
CN204728297U (en) Earth pressure cell device is buried in boring underground
CN202900204U (en) Downhole throttle device for coiled tubing
CN102606805A (en) Tube downing device with grouting function
CN204402406U (en) A kind of down-hole coal bed mash gas pumping drilling prosthetic device
CN202532015U (en) Movable pipe-laying device for buried pipes
CN206458499U (en) Colliery extraction borehole sleeve pipe suspended and fixed device
CN205049135U (en) Solve inclinometer card gauge head unit
CN205315026U (en) Anchor agent even ends ware
CN204140088U (en) Underground coal mine connects anchor net arrangement automatically
CN201738905U (en) Layered oil extraction device of oil well
CN203783631U (en) Flexible filling bag for opposite-pulling anchoring rod penetrating
CN202370428U (en) Drilling machine
CN203476266U (en) Multifunctional ground anchor device
CN105133676A (en) Building inclination rectification construction method
CN202662958U (en) Auxiliary device for burying ground wire stud
CN206158726U (en) Drilling through -hole survey device
CN105064384A (en) Vacuum tube well precipitation system under special geological conditions

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JIANGSU JINENG ENVIRONMENTAL ENERGY TECHNOLOGY CO.

Free format text: FORMER NAME: SUZHOU JINENG ENVIRONMENT ENERGY TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: Xinghu street Suzhou Industrial Park of Jiangsu province No. 328 B304 215000

Patentee after: Jiangsu Jineng Environmen Energy Technology Co., Ltd.

Address before: Xinghu Street Industrial Park of Suzhou city in Jiangsu province 215123 China No. 328 building B304

Patentee before: Suzhou Jineng Environment Energy Technology Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: SUZHOU JINENG ENVIRONMENT ENERGY TECHNOLOGY CO., L

Free format text: FORMER NAME: JIANGSU JINENG ENVIRONMENTAL ENERGY TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: Suzhou City, Jiangsu Province, Suzhou Industrial Park 215000 Xinghu Street No. 328 B304

Patentee after: SUZHOU JINENG ENVIRONMENT ENERGY TECHNOLOGY CO., LTD.

Address before: Xinghu street Suzhou Industrial Park of Jiangsu province No. 328 B304 215000

Patentee before: Jiangsu Jineng Environmen Energy Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20180321

CF01 Termination of patent right due to non-payment of annual fee