CN202370428U - Drilling machine - Google Patents
Drilling machine Download PDFInfo
- Publication number
- CN202370428U CN202370428U CN201120360095XU CN201120360095U CN202370428U CN 202370428 U CN202370428 U CN 202370428U CN 201120360095X U CN201120360095X U CN 201120360095XU CN 201120360095 U CN201120360095 U CN 201120360095U CN 202370428 U CN202370428 U CN 202370428U
- Authority
- CN
- China
- Prior art keywords
- borehole drill
- drill construction
- borehole
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 17
- 230000007246 mechanism Effects 0.000 claims abstract description 8
- 238000010276 construction Methods 0.000 claims description 26
- 239000011435 rock Substances 0.000 abstract description 9
- 239000002360 explosive Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to a drilling machine, which comprises a forward pushing device, wherein a connecting plate is arranged at the front end of the forward pushing device; a plurality of drilling mechanisms are arranged on the front end face of the connecting plate at intervals; and the drilling mechanisms comprise driving motors and drill stems connected with the driving motors. The drilling machine can punch a plurality of holes on the rock wall once, so that the labor intensity is reduced greatly, and the drilling efficiency is improved.
Description
Technical field
The utility model relates to a kind of auger.
Background technology
When digging underground passage, need with rig rock wall to be punched in advance, then, explosive is placed in the hole of being bored, through explosive rock is blown.
The artificial hand electric single hole rig of existing general employing is beaten a plurality of holes at rock wall, and keeps at a certain distance away between the adjacent holes.Adopt this mode to hole, labour intensity is big, and drilling efficiency is low.
The utility model content
The purpose of the utility model is to provide a kind of auger, and is big to solve the labour intensity of holing in the prior art, the problem that drilling efficiency is low.
To achieve these goals, the technical scheme of the utility model is following:
A kind of auger is characterized in that, comprises pushing ahead device, and the front end of pushing ahead device is provided with junction plate, is laid with some borehole drill constructions at interval on the front end face of junction plate, and said borehole drill construction comprises drive motors and the drilling rod that is connected with drive motors.
In a preferred embodiment of the utility model, the said device of pushing ahead is a fork truck.
In a preferred embodiment of the utility model, be embedded with some parallel guide rails on the front end face of said junction plate, borehole drill construction is arranged on the guide rail, and the outside of said guide rail is arranged at intervals with some keepers that are used for fixing the borehole drill construction position.Further, said borehole drill construction is dismountable is installed on the said guide rail.
In a preferred embodiment of the utility model, the borehole drill construction that is positioned at the centre position on the said junction plate front end face is a main borehole mechanism, and all the other are secondary borehole drill construction, and the drill pipe diameter of said main borehole mechanism is 25cm-30cm, and length is 50m-100m; The drill pipe diameter of said secondary borehole drill construction is 4cm, and length is 4m.
The utility model can disposablely be beaten a plurality of holes at rock wall, greatly reduces labour intensity, improves drilling efficiency.
The quantity of the borehole drill construction on the junction plate front end face of the utility model and position can be adjusted according to the situation of rock wall.
The characteristics of the utility model can consult this case graphic and below better embodiment detailed description and obtain to be well understood to.
Description of drawings
Fig. 1 is the sketch map of the utility model among the embodiment 1.
Fig. 2 is arranged on the sketch map on the junction plate for the borehole drill construction of the utility model among the embodiment 1.
Fig. 3 is the sketch map of embodiment 2.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, further set forth the utility model below in conjunction with specific embodiment.
Embodiment 1
As illustrated in fig. 1 and 2, auger comprises and pushes ahead device, and in the present embodiment, pushing ahead device is a fork truck 100.
The front end of fork truck 100 is provided with junction plate 200; Be embedded with some parallel guide rails 210 on the front end face of junction plate; Borehole drill construction 300 dismountable being installed on guide rail 210, the outside of guide rail is arranged at intervals with some keepers that are used for fixing the borehole drill construction position.In the present embodiment, this keeper adopts positioning bolt (not indicating among the figure).The quantity of borehole drill construction and position can be adjusted according to the situation of rock wall.Borehole drill construction 300 comprises drive motors 310 and the drilling rod that is connected with drive motors 320.
During use, start fork truck 100 and move forward, the drilling rod of borehole drill construction 300 is withstood on the rock wall, drilling rod 320 carries out boring work under the drive of drive motors.
Embodiment 2
Referring to Fig. 3, in the present embodiment, the borehole drill construction that is positioned at the centre position on the junction plate front end face is a main borehole mechanism 400, and all the other are secondary borehole drill construction 500, and drilling rod 410 diameters of main borehole mechanism are 25cm-30cm, and length is 50m-100m; Drilling rod 510 diameters of secondary borehole drill construction are 4cm, and length is 4m.
The utility model can disposablely be beaten a plurality of holes at rock wall, greatly reduces labour intensity, improves drilling efficiency.
More than show and described the advantage of basic principle, principal character and the utility model of the utility model.The technician of the industry should understand; The utility model is not restricted to the described embodiments; The just principle of describing in the foregoing description and the manual of the utility model; The utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these variations and improvement all fall in the scope of the utility model that requires protection.The protection domain that the utility model requires is defined by appending claims and equivalent thereof.
Claims (5)
1. an auger is characterized in that, comprises and pushes ahead device, and the front end of pushing ahead device is provided with junction plate, is laid with some borehole drill constructions at interval on the front end face of junction plate, and said borehole drill construction comprises drive motors and the drilling rod that is connected with drive motors.
2. auger according to claim 1 is characterized in that, the said device of pushing ahead is a fork truck.
3. auger according to claim 1 is characterized in that, is embedded with some parallel guide rails on the front end face of said junction plate, and borehole drill construction is arranged on the guide rail, and the outside of said guide rail is arranged at intervals with some keepers that are used for fixing the borehole drill construction position.
4. auger according to claim 3 is characterized in that, said borehole drill construction is dismountable to be installed on the said guide rail.
5. auger according to claim 1; It is characterized in that the borehole drill construction that is positioned at the centre position on the said junction plate front end face is a main borehole mechanism, all the other are secondary borehole drill construction; The drill pipe diameter of said main borehole mechanism is 25cm-30cm, and length is 50m-100m; The drill pipe diameter of said secondary borehole drill construction is 4cm, and length is 4m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120360095XU CN202370428U (en) | 2011-09-23 | 2011-09-23 | Drilling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120360095XU CN202370428U (en) | 2011-09-23 | 2011-09-23 | Drilling machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202370428U true CN202370428U (en) | 2012-08-08 |
Family
ID=46594135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120360095XU Expired - Fee Related CN202370428U (en) | 2011-09-23 | 2011-09-23 | Drilling machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202370428U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103670275A (en) * | 2013-12-04 | 2014-03-26 | 贵阳矿山机器厂有限公司 | Hydraulic rock drilling machine |
CN107576238A (en) * | 2017-10-12 | 2018-01-12 | 贵州大学 | A kind of mining blasting pipe burying device |
CN110640691A (en) * | 2019-10-15 | 2020-01-03 | 中铁电气化局集团有限公司石家庄机械装备分公司 | Group drilling device for railway tunnels |
-
2011
- 2011-09-23 CN CN201120360095XU patent/CN202370428U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103670275A (en) * | 2013-12-04 | 2014-03-26 | 贵阳矿山机器厂有限公司 | Hydraulic rock drilling machine |
CN103670275B (en) * | 2013-12-04 | 2016-06-08 | 贵阳矿山机器厂有限公司 | A kind of hydraulic rock drilling machine |
CN107576238A (en) * | 2017-10-12 | 2018-01-12 | 贵州大学 | A kind of mining blasting pipe burying device |
CN107576238B (en) * | 2017-10-12 | 2023-05-12 | 贵州大学 | Mining blasting is with buried pipe device |
CN110640691A (en) * | 2019-10-15 | 2020-01-03 | 中铁电气化局集团有限公司石家庄机械装备分公司 | Group drilling device for railway tunnels |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103398215A (en) | Minimally-invasive non-excavation pipe jacking and pull technology | |
CN202370428U (en) | Drilling machine | |
CN203584444U (en) | Efficient and simple roofbolter | |
CN202832187U (en) | Hydraulic breaker type rotary drilling rig | |
CN201460724U (en) | Permafrost steam drilling pile machine | |
CN203796175U (en) | Embedment reamer for steel casings of rotary drilling bored piles | |
CN103410542B (en) | Device and method for improving hole forming efficiency and anchoring performance of anchor rod and anchor cable of roadway floor | |
CN102644285B (en) | Anchor cable is holed anti-collapse hole construction method | |
CN201635074U (en) | Ground anchor | |
CN203843233U (en) | Drilling and punching hole forming device | |
CN102235151B (en) | Advanced hole-forming method of sand gravel boulder layer | |
CN1982651A (en) | Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well | |
CN201991455U (en) | Special oriented flexible screen pipe for drilling and completion | |
CN206644159U (en) | Hard rock mass rope saw cut structure | |
CN207453879U (en) | Long spire pairing power drawing hole | |
CN201874455U (en) | Pneumatic luoyang shovel | |
CN202745755U (en) | Combination extension rod type water supply device | |
CN202630860U (en) | Testing device for long drill hole by virtue of deep-part base point method | |
CN207776795U (en) | A kind of chambering device structure | |
CN205154000U (en) | Can bore heterotype hole's rig | |
CN222362979U (en) | Portable hole grouting device for advanced exploratory following of underground tunnel of coal mine | |
CN206487410U (en) | A kind of drilling mechanism and small-sized pipe laying equipment | |
CN204591185U (en) | A kind of non-dredging guiding driller clamper assembly | |
CN105350408A (en) | Construction method for cutting, splitting, breaking and reforming existing integral track bed of subway | |
CN217583406U (en) | Pipe jacking device for municipal construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120808 Termination date: 20140923 |
|
EXPY | Termination of patent right or utility model |