CN202560229U - Transshipment machine - Google Patents

Transshipment machine Download PDF

Info

Publication number
CN202560229U
CN202560229U CN 201220228659 CN201220228659U CN202560229U CN 202560229 U CN202560229 U CN 202560229U CN 201220228659 CN201220228659 CN 201220228659 CN 201220228659 U CN201220228659 U CN 201220228659U CN 202560229 U CN202560229 U CN 202560229U
Authority
CN
China
Prior art keywords
bridge
elevating conveyor
chute
transshipment
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220228659
Other languages
Chinese (zh)
Inventor
曲天智
赵洪林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG MINING MACHINERY GROUP CO Ltd
Original Assignee
SHANDONG MINING MACHINERY GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG MINING MACHINERY GROUP CO Ltd filed Critical SHANDONG MINING MACHINERY GROUP CO Ltd
Priority to CN 201220228659 priority Critical patent/CN202560229U/en
Application granted granted Critical
Publication of CN202560229U publication Critical patent/CN202560229U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a transshipment machine, which includes a transshipment machine body, wherein a bridge extending along a chute is mounted on the chute of the transshipment machine body; fixed ladders extending downwards are mounted on the side of the bridge; and guardrails extending along the bridge are fixedly arranged on the two sides of the bridge to prevent working personnel walking on the bridge from falling off the bridge and greatly improve the safety of working personnel. The guardrails extend along the two sides of the bridge to guarantee the walking safety of the entire bridge; the working personnel can more smoothly walk on the bridge and grab the guardrails with hands for support; the base of the bridge is connected with the chute through bolts; at least two lifting oil cylinders are arranged between one side of the bridge and the corresponding chute and between the other side of the bridge and the corresponding chute respectively, and the lifting of the lifting oil cylinders is controlled by a controller mounted on the transshipment machine; the transshipment machine adopting the structure has a reasonable structure, is low for operation space requirement, does not influence mineral transshipment and brings convenience for personnel to pass through, has high safety, and facilitates guaranteeing the operation stability of mining.

Description

Elevating conveyor
Technical field
The utility model relates to a kind of elevating conveyor.
Background technology
The elevating conveyor full name is that crossheading is used the scraper plate elevating conveyor.It is mounted in the interior bridge-type drag conveyor of section haulage way of outlet under the mine working face.When work, the conveyer overlap joint of elevating conveyor one end and work plane, an end links to each other with the afterbody of ribbon conveyer, plays the effect of bridge tie, is requisite corollary equipment in the large-scale fully mechanized mining.
In the fully-mechanized mining working coordinative composition of equipments of routine; The structure of elevating conveyor is very ripe with layout, does not have any problem, but when the exploitation girdle; In order to reduce drivage ratio and cost of production; Work plane is arranged to the form to drawing, and promptly two adjacent work planes are exploited simultaneously, and the coal of extraction is all reprinted through same the elevating conveyor of laying in the shared tunnel, centre and is transported on the adhesive tape conveyor.But, so just caused the current contradiction with Coal Transport of personnel, cause the working space narrow and small, the current difficulty of personnel, and also abnormally dangerous.
Summary of the invention
The technical problem that the utility model will solve is to provide a kind of rational in infrastructure to above-mentioned deficiency, and working space requires little, and neither mineral are reprinted in influence, makes things convenient for personnel current again, and safe elevating conveyor.
For solving the problems of the technologies described above, this elevating conveyor comprises the elevating conveyor body, and its design feature is: the chute top of elevating conveyor body is equipped with the bridge formation that extends along chute, and the bridge formation avris is equipped with to the cat ladder that extends below.
The elevating conveyor of this structure is to realize working space is required little through upper support structure, and neither mineral are reprinted in influence, make things convenient for personnel current again, and safe.
Upper support structure mainly comprises the bridge formation that is installed on the elevating conveyor body, and the chute of build bridge bottom and elevating conveyor body links together, and is provided with along the chute length direction.Therefore, the position of the relative elevating conveyor body of building bridge is the top that is positioned at the elevating conveyor body, can not take the space of elevating conveyor body both sides.That is to say that this elevating conveyor is for traditional elevating conveyor, the height that has only increased elevating conveyor does not increase the width of elevating conveyor.And in real work, the space between elevating conveyor top and the coal seam, top is bigger and is not utilized, so this elevating conveyor not only effectively utilized surrounding space, and for the staff passage of being convenient to pass through is provided.In this elevating conveyor, the bridge formation both sides are provided with to the cat ladder that extends below.Through cat ladder, the staff can climb bridge formation smoothly or climb from building bridge.Like this, the staff just can successfully shift or between elevating conveyor body both sides, shift along elevating conveyor body length direction, and not only convenient transfer but also safety are higher.
As improvement, the bridge formation both sides are installed with the guardrail that extends along building bridge.
In the bridge formation both sides guardrail is set, the staff that can prevent to walk on building bridge falls from building bridge, and has strengthened staff's safety greatly.Guardrail extends setting along the bridge formation both sides, so just can guarantee the walking safety of whole bridge formation.And the staff can use during walking the hand steered guardrail of living to support obtaining on building bridge, and it is more smooth and easy to walk.
As further improvement, the base of bridge formation links together through bolt and chute, is respectively arranged with at least two lifting oil cylinders between bridge formation both sides and the corresponding chute, and the up-down of lifting oil cylinder is by the controller control that is installed on the elevating conveyor.
The bridge formation base is linked together by bolt and chute, can realize building bridge and the fixedlying connected of elevating conveyor body, help the structural stability of this elevating conveyor.Between bridge formation both sides and corresponding chute, the lifting oil cylinder is set, under the prerequisite that can be removed,, bridge formation is carried out horizontal descending operation through the control of controller at the bolt between bridge formation and the chute.Can according to actual needs this elevating conveyor be adjusted like this, compliance is stronger.
In sum, adopt the elevating conveyor of this structure, rational in infrastructure, working space requires little, and neither mineral are reprinted in influence, makes things convenient for personnel current again, and safe, helps to ensure the stability of mining activity.
Description of drawings
In conjunction with accompanying drawing the utility model is explained further details:
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the user mode figure that the utility model and scraper plate machine are used;
Fig. 3 overlooks user mode figure for the utility model.
Among the figure: 1 is the elevating conveyor body, and 2 is chute, and 3 for building bridge, and 4 is cat ladder, and 5 is guardrail, and 6 is bolt, and 7 is controller, and 8 are the lifting oil cylinder, and 9 is the scraper plate machine, and 10 is the coal seam.
The specific embodiment
As shown in Figure 1, this elevating conveyor mainly comprises the bridge formation 3 that is installed on the elevating conveyor body 1, and the chute 2 of build bridge 3 bottoms and elevating conveyor body 1 links together, and along chute 2 length direction settings.Therefore, the position of the 3 relative elevating conveyor bodies 1 of building bridge is the top that is positioned at elevating conveyor body 1, can not take the space of elevating conveyor body 1 both sides.That is to say that this elevating conveyor is for traditional elevating conveyor, the height that has only increased elevating conveyor does not increase the width of elevating conveyor.Structural representation as shown in Figure 2, as to be used for this elevating conveyor and scraper plate machine 9.In real work, the space between elevating conveyor top and the coal seam, top 10 is bigger and is not utilized, so this elevating conveyor not only effectively utilized surrounding space, and for the staff passage of being convenient to pass through is provided.In this elevating conveyor, 3 both sides of building bridge are provided with to the cat ladder that extends below 4.Through cat ladder 4, the staff can climb smoothly and build bridge 3 or 3 climb from building bridge.Like this, the staff just can successfully shift or between elevating conveyor body 1 both sides, shift along elevating conveyor body 1 length direction, and not only convenient transfer but also safety are higher.
As shown in Figure 3,3 both sides of building bridge are installed with along the guardrail 5 of 3 extensions of building bridge.Can prevent like this to walk and 3 fall from building bridge, strengthen staff's safety greatly the staff who builds bridge on 3.Guardrail 5 extends setting along 3 both sides of building bridge, and so just can guarantee the walking safety of whole bridge formation 3.And the staff can use the hand steered guardrail 5 of living to support obtaining when building bridge on 3 walking, and it is more smooth and easy to walk.
In the present embodiment, 3 the base of building bridge links together through bolt 6 and chute 2, can realize like this building bridge 3 with being fixedly connected of elevating conveyor body 1, help the structural stability of this elevating conveyor.Build bridge and be respectively arranged with at least two lifting oil cylinders 8 between 3 both sides and the corresponding chute 2, the up-down of lifting oil cylinder 8 is by controller 7 controls that are installed on the elevating conveyor.Like this can build bridge 3 and chute 2 between bolt 6 prerequisite that be removed under, through the control of controller 7,3 carry out horizontal descending operation to building bridge.Can according to actual needs this elevating conveyor be adjusted like this, compliance is stronger.

Claims (3)

1. an elevating conveyor comprises elevating conveyor body (1), it is characterized in that: chute (2) top of elevating conveyor body (1) is equipped with the bridge formation (3) that extends along chute (2), and (3) avris of building bridge is equipped with to the cat ladder that extends below (4).
2. elevating conveyor as claimed in claim 1 is characterized in that: (3) both sides of building bridge are installed with the guardrail (5) that extends along building bridge.
3. according to claim 1 or claim 2 elevating conveyor; It is characterized in that: the base of build bridge (3) links together through bolt (6) and chute (2); Building bridge is respectively arranged with at least two lifting oil cylinders (8) between (3) both sides and the corresponding chute (2), and the up-down of lifting oil cylinder (8) is by controller (7) control that is installed on the elevating conveyor.
CN 201220228659 2012-05-21 2012-05-21 Transshipment machine Expired - Fee Related CN202560229U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220228659 CN202560229U (en) 2012-05-21 2012-05-21 Transshipment machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220228659 CN202560229U (en) 2012-05-21 2012-05-21 Transshipment machine

Publications (1)

Publication Number Publication Date
CN202560229U true CN202560229U (en) 2012-11-28

Family

ID=47209893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220228659 Expired - Fee Related CN202560229U (en) 2012-05-21 2012-05-21 Transshipment machine

Country Status (1)

Country Link
CN (1) CN202560229U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295314A (en) * 2014-11-02 2015-01-21 陕西南梁矿业有限公司 Tail protection device of loading mechanism
CN115123802A (en) * 2022-07-08 2022-09-30 扎赉诺尔煤业有限责任公司 Transporter pedestrian bridge and transporter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295314A (en) * 2014-11-02 2015-01-21 陕西南梁矿业有限公司 Tail protection device of loading mechanism
CN115123802A (en) * 2022-07-08 2022-09-30 扎赉诺尔煤业有限责任公司 Transporter pedestrian bridge and transporter
CN115123802B (en) * 2022-07-08 2023-09-12 扎赉诺尔煤业有限责任公司 Pedestrian bridge of reversed loader and reversed loader

Similar Documents

Publication Publication Date Title
CN101985887B (en) End supporting, filling and transshipping system of coal face
CN102094664B (en) Hydraulic bracket for end of comprehensive mechanized filling coal face
CN205503122U (en) Chisel dress anchor all -in -one
CN103410545B (en) The hydraulic support of Sub-Level Caving and packing job can be realized
CN103244175B (en) A kind of underground coal mine trackless step type is from moving device train
CN202560229U (en) Transshipment machine
CN203452643U (en) Anchor rod drill carriage for coal mines
CN201460884U (en) Steeply sloping seam coal mining machine
CN103790602A (en) Single track hydraulic temporary support device
CN201953391U (en) Comprehensively mechanized filling coal face tip hydraulic support
CN104500117B (en) Without repeatedly supporting continuous supporting advanced hydraulic support
CN202743922U (en) Self-moving device of loader
CN102116155A (en) Method for supporting and coalmining in transition section of large-mining-height working face
CN202788900U (en) Circulating mobile fore support
CN208994724U (en) A kind of acid fracturing proppant high-altitude continuous conveying device
CN201068800Y (en) Drag-flight conveyer
CN207497603U (en) Recovery operation face scrapper conveyor returns the device of coal
CN105173768A (en) Portal-type three-scraper reclaimer for strip-shaped stockyard
CN203050773U (en) Suspended adhesive tape conveyor for mine
CN109236210A (en) A kind of open air drill rig dismountable moving drilling tool library
CN204999326U (en) Three scraper blade reclaimers of gate -type that bar stock ground was used
CN208700085U (en) A kind of novel stacker
CN209556960U (en) A kind of open air drill rig dismountable moving drilling tool library
CN208699954U (en) From the simple elevating conveyor of shifting
CN203879021U (en) Automatic ascending and descending type modular transferring platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20150521

EXPY Termination of patent right or utility model