CN202559342U - Spiral steel strip-cement diameter increasing pipe pile - Google Patents

Spiral steel strip-cement diameter increasing pipe pile Download PDF

Info

Publication number
CN202559342U
CN202559342U CN2012202515102U CN201220251510U CN202559342U CN 202559342 U CN202559342 U CN 202559342U CN 2012202515102 U CN2012202515102 U CN 2012202515102U CN 201220251510 U CN201220251510 U CN 201220251510U CN 202559342 U CN202559342 U CN 202559342U
Authority
CN
China
Prior art keywords
pile
cement
pipe pile
spirality
prestressed pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012202515102U
Other languages
Chinese (zh)
Inventor
肖纹篯
肖斯熔
肖斯昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou No3 Construction Engineering Co Ltd
Original Assignee
Fuzhou No3 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou No3 Construction Engineering Co Ltd filed Critical Fuzhou No3 Construction Engineering Co Ltd
Priority to CN2012202515102U priority Critical patent/CN202559342U/en
Application granted granted Critical
Publication of CN202559342U publication Critical patent/CN202559342U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a spiral steel strip-cement diameter increasing pipe pile. The spiral steel strip-cement diameter increasing pipe pile comprises a prestressed pipe pile and a pile pressing paste injection hopper, wherein a spiral steel strip is welded on the outer wall of the prestressed pipe pile; the prestressed pipe pile is pressed into a soil body from the middle part of the pile pressing paste injection hopper; and cement paste or fine aggregate concrete is filled in the pile pressing paste injection hopper, so that the cement paste or the fine aggregate concrete is brought into the soil body through the spiral steel strip in the process of pressing the prestressed pipe pile into the soil body so as to form a steel-cement protective layer coated on the periphery of the prestressed pipe pile. The steel-cement protective layer has an effect of expanding the pipe pile; the pipe pile has the advantages of stronger horizontal shear resistance and vertical bearing force; and pile crack accidents caused by mechanical equipment in piling operation and soil excavation operation can be effectively avoided.

Description

A kind of spirality steel band-cement increases the footpath pile tube
Technical field
The utility model relates to a kind of spirality steel band-cement and increases the footpath pile tube.
Background technology
Advantages such as prestressed reinforcement strong concrete pile tube has the prefabricated production of batch production, and quality control is reliable, and site operation is simple, civilized, and the duration is short, and recruitment is few, and cost is low.But when being applied to this prestressed reinforcement strong concrete pile tube in the soft subgrade soil earth, because the effect of top pile driving equipment and the influence of soil excavation can produce the horizontal shear active force to the pile tube of being driven underground, the quality accident of pile tube fracture takes place easily.
Summary of the invention
The purpose of the utility model is to provide a kind of spirality steel band-cement to increase the footpath pile tube; This pile tube has stronger anti-horizontal shear ability and vertical bearing capacity; Can effectively avoid when piling work and soil excavation operation, an accident that ruptures that is caused by plant equipment takes place.
The technical scheme of the utility model is: a kind of spirality steel band-cement increases the footpath pile tube; Comprise pile for prestressed pipe and piling slip casting bucket; Be welded with the spirality steel band on the outer wall of said pile for prestressed pipe; Port is pressed into the soil body said pile for prestressed pipe from piling slip casting bucket middle part, and in the piling slip casting bucket cement paste or pea gravel concreten is arranged, in order to being pressed at pile for prestressed pipe in the process of the soil body; Through the spirality steel band cement paste or pea gravel concreten are brought in the soil body together, formed and be coated on the peripheral steel-cement topping of pile for prestressed pipe.
In one embodiment, described piling slip casting bucket is provided with vibrating device.
In one embodiment, described spirality steel band is spirality shaped steel, spirality angle steel or spirality steel pipe.
Above-mentioned spirality steel band-cement increases the job practices of footpath pile tube, carries out according to the following steps:
(1) by the width and the pitch of designing requirement, steel are made into the spirality steel band, described steel are shaped steel, angle steel or steel pipe;
(2) spirality steel band cover is received on the pile for prestressed pipe periphery wall, and it is welded on the reservation solder joint on the pile for prestressed pipe periphery wall;
(3) piling slip casting bucket is set earlier on the soil body that will drive piles, and in piling slip casting bucket, pours into cement paste or pea gravel concreten, open and be arranged on the vibrating device on the piling slip casting bucket.
(4) adopt piling equipment that the outlet of pile for prestressed pipe from piling slip casting bucket lower end is pressed into the soil body, simultaneously constantly supplementing water mud or pea gravel concreten in the piling slip casting bucket.
(5) etc. after pile for prestressed pipe is pressed in the soil body fully, remove piling slip casting bucket.
The advantage of the utility model is: this steel-cement topping has the effect that enlarges pile tube; This pile tube has stronger anti-horizontal shear ability and vertical bearing capacity; Can effectively avoid when piling work and soil excavation operation, an accident that ruptures that is caused by plant equipment takes place.The construction technology of the utility model is close with former piling technology; Forming process at steel-cement topping can not increase too much pile driving pressure, adopts common pile driving equipment just can realize; And few to ambient influnence, have applicable to top in the pile for prestressed pipe design of weak soil layer.
Description of drawings
Fig. 1 is the work progress sketch map that the spirality steel band-cement among the embodiment increases the footpath pile tube.
Among the figure: 1-pile for prestressed pipe, 2-piling slip casting bucket, 3-spirality steel band, 4-steel-cement topping, 5-vibrating device, 6-soil body, 7-reservation solder joint.
The specific embodiment
For letting the above-mentioned feature and advantage of the utility model can be more obviously understandable, hereinafter is special lifts embodiment, and conjunction with figs., elaborates as follows.
Spirality steel band-the cement of the utility model increases the footpath pile tube; Comprise pile for prestressed pipe 1 and piling slip casting bucket 2; Be welded with spirality steel band 3 on the outer wall of said pile for prestressed pipe 1; Said pile for prestressed pipe 1 is pressed into the soil body 6 from piling slip casting bucket 2 middle part ports, and in the piling slip casting bucket cement paste or pea gravel concreten is arranged, in order to being pressed at pile for prestressed pipe in the process of the soil body; Through the spirality steel band cement paste or pea gravel concreten are brought in the soil body 6 together, be attached to outer cement paste of pile for prestressed pipe or pea gravel concreten and the soil body and form the steel-cement topping 4 that is coated on the pile for prestressed pipe periphery.
In one embodiment, described piling slip casting bucket is provided with vibrating device 5.
In one embodiment, described spirality steel band 3 is spirality shaped steel, spirality angle steel or spirality steel pipe.
Spirality steel band-the cement of the utility model increases the job practices of footpath pile tube, carries out according to the following steps:
(1) by the width and the pitch of designing requirement, steel are made into the spirality steel band, described steel are shaped steel, angle steel or steel pipe;
(2) spirality steel band cover is received on pile for prestressed pipe 1 periphery wall, and it is welded on the reservation solder joint 7 on the pile for prestressed pipe periphery wall;
(3) piling slip casting bucket 2 is set earlier on the soil body that will drive piles 6, and in piling slip casting bucket, pours into cement paste or pea gravel concreten, open and be arranged on the vibrating device 5 on the piling slip casting bucket.
(4) adopt piling equipment that the outlet of pile for prestressed pipe from piling slip casting bucket lower end is pressed into the soil body, simultaneously constantly supplementing water mud or pea gravel concreten in the piling slip casting bucket.
(5) etc. after pile for prestressed pipe is pressed in the soil body fully, remove piling slip casting bucket.
The above is merely the preferred embodiment of the utility model, and all equalizations of being done according to the utility model claim change and modify, and all should belong to the covering scope of the utility model.

Claims (3)

1. a spirality steel band-cement increases the footpath pile tube; It is characterized in that: comprise pile for prestressed pipe and piling slip casting bucket; Be welded with the spirality steel band on the outer wall of said pile for prestressed pipe; Port is pressed into the soil body said pile for prestressed pipe from piling slip casting bucket middle part, and in the piling slip casting bucket cement paste or pea gravel concreten is arranged, in order to being pressed at pile for prestressed pipe in the process of the soil body; Through the spirality steel band cement paste or pea gravel concreten are brought in the soil body together, formed and be coated on the peripheral steel-cement topping of pile for prestressed pipe.
2. spirality steel band-cement according to claim 1 increases the footpath pile tube, and it is characterized in that: described piling slip casting bucket is provided with vibrating device.
3. spirality steel band-cement according to claim 1 increases the footpath pile tube, and it is characterized in that: described spirality steel band is spirality shaped steel, spirality angle steel or spirality steel pipe.
CN2012202515102U 2012-05-31 2012-05-31 Spiral steel strip-cement diameter increasing pipe pile Expired - Fee Related CN202559342U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012202515102U CN202559342U (en) 2012-05-31 2012-05-31 Spiral steel strip-cement diameter increasing pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012202515102U CN202559342U (en) 2012-05-31 2012-05-31 Spiral steel strip-cement diameter increasing pipe pile

Publications (1)

Publication Number Publication Date
CN202559342U true CN202559342U (en) 2012-11-28

Family

ID=47209011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012202515102U Expired - Fee Related CN202559342U (en) 2012-05-31 2012-05-31 Spiral steel strip-cement diameter increasing pipe pile

Country Status (1)

Country Link
CN (1) CN202559342U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660945A (en) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 Spiral steel strip and cement diameter-increasing pipe pile and construction method thereof
WO2016058275A1 (en) * 2014-10-14 2016-04-21 南京联众建设工程技术有限公司 Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall thereof and manufacturing method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660945A (en) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 Spiral steel strip and cement diameter-increasing pipe pile and construction method thereof
CN102660945B (en) * 2012-05-31 2014-09-10 福州市第三建筑工程公司 Spiral steel strip and cement diameter-increasing pipe pile and construction method thereof
WO2016058275A1 (en) * 2014-10-14 2016-04-21 南京联众建设工程技术有限公司 Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall thereof and manufacturing method thereof
US10030792B2 (en) 2014-10-14 2018-07-24 Nanjing Lianzhong Construction Engineering Technology Co., Ltd. Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN103774514B (en) A kind of prefabricated tubular pile embankment structure and construction method thereof
CN102587361B (en) Polymer material grouted wedge precast pile construction method
CN104179174B (en) A kind of multiple holes grouting pipe shaped pile and pile making method thereof
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN111733837B (en) Rock slope filling and sealing protection system and construction method
CN103184734A (en) Implanted and grouted compound pile and construction method
CN106567303B (en) A kind of road foundation structure
CN103993598A (en) Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN105804083A (en) Grouting pipeline device, conical special-shaped pile and application method thereof
CN104404983A (en) Horse riding type well device for pipe jacking construction and construction method thereof
CN202194162U (en) Unchoking device for acoustic pipe for drilled pile
CN205742201U (en) A kind of grouting pipeline device and tapered shaped pile
CN204023559U (en) A kind of multiple holes grouting pipe shaped pile
CN202559342U (en) Spiral steel strip-cement diameter increasing pipe pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN203684022U (en) Prefabricated pipe pile embankment structure
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN102660945B (en) Spiral steel strip and cement diameter-increasing pipe pile and construction method thereof
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN205259188U (en) Miniature pressure -bearing stake of bag pocket type of controllable slip casting scope
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN103362122A (en) High-bearing-capacity sand filling pipe pile with pile joints and manufacturing and construction method of pile
CN103195077A (en) Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN107268534A (en) Approach channel shore protection repairs structure and its method
CN203174586U (en) Concrete pipe pile for reinforcing railway soft soil foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20150531

EXPY Termination of patent right or utility model