CN202544923U - Mobile hydraulic seal filling device - Google Patents

Mobile hydraulic seal filling device Download PDF

Info

Publication number
CN202544923U
CN202544923U CN2012201816668U CN201220181666U CN202544923U CN 202544923 U CN202544923 U CN 202544923U CN 2012201816668 U CN2012201816668 U CN 2012201816668U CN 201220181666 U CN201220181666 U CN 201220181666U CN 202544923 U CN202544923 U CN 202544923U
Authority
CN
China
Prior art keywords
filling
cloth
hydraulic
horizontal pressure
door curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012201816668U
Other languages
Chinese (zh)
Inventor
石建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZIBO WANGZHUANG COAL MINE
Original Assignee
ZIBO WANGZHUANG COAL MINE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIBO WANGZHUANG COAL MINE filed Critical ZIBO WANGZHUANG COAL MINE
Priority to CN2012201816668U priority Critical patent/CN202544923U/en
Application granted granted Critical
Publication of CN202544923U publication Critical patent/CN202544923U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Revetment (AREA)

Abstract

The utility model relates to a mobile hydraulic seal filling device which comprises a plurality of hydraulic support groups which are arranged in parallel, wherein the back end of each hydraulic support group is connected with a vertical retaining wall made of hard plates through a cross beam; each hydraulic support is fixedly provided with an upper hydraulic cylinder and a lower hydraulic cylinder, which are back to back, through a supporting plate; the top end of a piston rod of each hydraulic cylinder is fixed with an adjusting plate; the adjusting plate comprises a horizontal pressure plate perpendicular to the piston rod, and two vertical plates which are welded with both ends of the horizontal pressure plate and parallel to the piston rod; the horizontal pressure plate is fixed to the top end of the piston rod; the vertical plates are positioned inside the vertical retaining wall; an integral waterproof cloth curtain is arranged outside a plurality of vertical retaining walls; the upper and lower ends of the cloth curtain respectively bypass the upper and lower horizontal pressure plates and are connected with the supporting plate through adjusting springs; a high-polymer elastic seal block is arranged above the cloth curtain above the horizontal pressure plate; and the seal block is connected with the cloth curtain through a positioning device. When being used for filling, the device has favorable seal effect, and has a good inhibiting action on top plate collapse and ground settlement by filling while exploiting.

Description

The airtight device for filling of mobile hydraulic
Technical field
The utility model relates to the airtight device for filling of a kind of mobile hydraulic, belongs to coal mining filling field, is applicable to the filling of high-water material.
Background technology
At present, the coal-mining method in field of coal mining, the mode of handling by the goaf can be divided into: three kinds of caving method, coal column method and filling methods.Wherein, the method for collecting coal by the means of filling is meant in the exploitation process of work plane or after the exploitation, adopts the relatively inexpensive filler coal-mining method that goaf filling is closely knit.Its purpose mainly is to utilize obturation that country rock is controlled, to reduce ecology and geological disasters such as ground settlement and base plate gushing water.Simultaneously, create safer operating condition for stope.Using high-water material to carry out in the technology of filling mining,, need carry out airtight the open goaf of intending filling because high-water material has stronger flowability.To the goaf in the methods such as laneway type filling mining, strip-type filling mining, wall type filling mining, what usually adopt is the coal column wall, build brick wall or mould three kinds of modes such as compiling bag and carry out airtight.The subject matter that these three kinds of modes exist is that resource recovery is low, production efficiency is low, pack effectiveness is low.But up to now, also there is not good method can substitute aforesaid way.
The utility model content
According to above deficiency of the prior art; The technical problem that the utility model will solve is: a kind of filling good sealing effect is provided, cost is low and can improves the airtight device for filling of mobile hydraulic of pack effectiveness, be particularly useful for that high-water material is realized continuously at fully-mechanized mining working, efficient filling.
The utility model solves the technical scheme that its technical problem adopted: the airtight device for filling of described mobile hydraulic; Some groups of hydraulic supports that comprise parallel arranged; It is characterized in that: the rear end of every group of hydraulic support connects the vertical barricade of hard plate material through crossbeam; On the hydraulic support respectively through gripper shoe be installed with upper and lower two each other back to hydraulic cylinder, the piston rod top secured adjusted plate of hydraulic cylinder, adjustable plate comprise perpendicular to a horizontal pressure foot of piston rod be welded on the horizontal pressure foot two ends and be parallel to two vertical plates of piston rod; Horizontal pressure foot is fixed on the piston rod top; Vertical plate is positioned at the inboard of vertical barricade, and the outside of some vertical barricades is provided with the holistic waterproof door curtain made of cloth, and the upper/lower terminal of the door curtain made of cloth is walked around upper and lower horizontal pressure foot respectively and is connected with gripper shoe through regulating spring; The top of the horizontal pressure foot top door curtain made of cloth is provided with the high polymer elastic sealing block, and sealing block is connected with the door curtain made of cloth through positioner.
Wherein, positioner can be securing members such as bolt, and the utility model adopts following preferred version:
Described positioner comprises cylinder, bolt and packing ring; Cylinder and packing ring are separately positioned on the upper and lower of the door curtain made of cloth; Cylinder inside is provided with the screw that cooperates with bolt; Bolt passes packing ring, the door curtain made of cloth and is threaded with cylinder, and the corresponding circle cylinder is provided with detent in the bottom of sealing block, and cylinder is arranged in detent.Before packing job, especially behind the conversion workspace, need confirm the length of the door curtain made of cloth according to workspace situation (position of top board, base plate), through positioner the door curtain made of cloth and sealing block are located then.But because in same workspace, the distance between roof, the base plate is more or less the same, therefore, in the packing job process of same workspace, the length that generally need not regulate the door curtain made of cloth.
The left and right sides, top of described horizontal pressure foot is provided with deflector roll, and the door curtain made of cloth is walked around from two deflector rolls.Through deflector roll can reduce the horizontal pressure foot and the door curtain made of cloth between friction, thereby the door curtain made of cloth is played protective action, prolong the application life of the door curtain made of cloth.
The described door curtain made of cloth is PVC Polypropylence Sheet, nonwoven or rubberized fabric.The door curtain made of cloth through integral body stops the slit between the adjacent vertical barricade, the sealing effectiveness when guaranteeing filling.
Described hard plate material is a kind of of high molecular weight polyethylene board material, irony sheet material or wooden boards.
Described sealing block is block rubber or elastic polyurethane piece, and the contact surface of adjacent seals piece is a lozenges.Can guarantee the sealing between the adjacent seals piece through lozenges, improve the sealing effectiveness of filling.
During work; The front end of hydraulic support is parallel to coal-face, and need confirm mutually the quantity of hydraulic support side by side according to the width of coal-face, makes the vertical barricade of some groups of hydraulic support rear ends form the vertical barricade of one side filling jointly and seals with the slit between the adjacent vertical barricade of the door curtain made of cloth; Regulate the displacement of upper and lower two adjustable plates and two sealing blocks simultaneously through hydraulic cylinder; Sealing block is closely contacted with top board, base plate, guarantee the sealing between vertical barricade and top board, the base plate, then high-water expansion filling material is filled into vertical barricade and in the confined space between the filling area (that is: wait to fill district); After treating that high-water expansion filling material solidifies; Coal-winning machine continues exploitation along coal-face, exploit a segment distance after (this distance be no more than stride for the first time apart from), some groups of hydraulic supports move to coal-face with coal-winning machine simultaneously; Repeat above-mentioned filling action then, filling while exploiting.
Except above-mentioned points, upper and lower two hydraulic cylinders also can substitute with the double end hydraulic jack, control the up-down of two sealing blocks through the two-piston bar of double end hydraulic jack.
The beneficial effect that the utility model had is:
The airtight device for filling of this mobile hydraulic directly adopts the vertical barricade of hydraulic support rear end as the vertical barricade of filling; Need not the extra vertical barricade of building by laying bricks or stones; Therefore saved the labour's (build vertical barricade by laying bricks or stones or hang bag) in traditional stowing operation, reduced cost and improved pack effectiveness; Because top board and base plate are uneven, regulate the displacement of upper and lower two sealing blocks through hydraulic cylinder, sealing block is closely contacted, the sealing of vertical barricade and top board, base plate during with the assurance filling with top board, base plate; The door curtain made of cloth through integral body stops the slit between the adjacent vertical barricade, and the sealing effectiveness when both guaranteeing filling is avoided pollution and the infringement of filling slurry to vertical barricade again; Guarantee mode, country rock is moved the better controlled effect of playing, thereby roof caving and ground settlement are played the good restraining effect through filling while exploiting.
Description of drawings
Fig. 1 is the application state sketch map of the utility model;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Fig. 4 is the B-B sectional drawing of Fig. 1;
Fig. 5 is the partial enlarged drawing at I position among Fig. 4.
Among the figure: 1, top board; 2, sealing block; 3, lozenges; 4, the door curtain made of cloth; 5, vertical barricade; 6, base plate; 7, filling area; 8, district to be filled; 9, coal-face; 10, adjustable plate; 11, piston rod; 12, hydraulic cylinder; 13, regulating spring; 14, gripper shoe; 15, crossbeam; 16, hydraulic support; 17, cylinder; 18, bolt; 19, packing ring; 20, horizontal pressure foot; 21, deflector roll; 22, vertical plate.
The specific embodiment
Below in conjunction with accompanying drawing the embodiment of the utility model is done and to further describe:
Shown in Fig. 1~5; The airtight device for filling of mobile hydraulic; The some groups of hydraulic supports 16 that comprise parallel arranged, the rear end of every group of hydraulic support 16 connects the vertical barricade 5 of hard plate materials through crossbeam 15, on the hydraulic support 16 respectively through gripper shoe 14 be installed with upper and lower two each other back to hydraulic cylinder 12; The piston rod 11 top secured adjusted plates 10 of hydraulic cylinder 12; Adjustable plate 10 comprise perpendicular to a horizontal pressure foot 20 of piston rod 11 be welded on horizontal pressure foot 20 two ends and be parallel to two vertical plates 22 of piston rod 11, horizontal pressure foot 20 is fixed on piston rod 11 tops, vertical plate 22 is positioned at the inboard of vertical barricade 5; The outside of some vertical barricades 5 is provided with the holistic waterproof door curtain made of cloth 4; The upper/lower terminal of the door curtain made of cloth 4 is walked around upper and lower horizontal pressure foot 20 respectively and is connected with gripper shoe 14 through regulating spring 13, and the top of the horizontal pressure foot 20 top door curtains made of cloth 4 is provided with high polymer elastic sealing block 2, and sealing block 2 is connected with the door curtain made of cloth 4 through positioner.
Wherein:
Described positioner comprises cylinder 17, bolt 18 and packing ring 19; Cylinder 17 and packing ring 19 are separately positioned on the upper and lower of the door curtain made of cloth 4; Cylinder 17 inside are provided with the screw that cooperates with bolt 18; Bolt 18 passes packing ring 19, the door curtain made of cloth 4 and is threaded with cylinder 17, and corresponding circle cylinder 17 is provided with detent in the bottom of sealing block 2, and cylinder 17 is arranged in detent; The left and right sides, top of horizontal pressure foot 20 is provided with deflector roll 21, and the door curtain made of cloth 4 is walked around from two deflector rolls 21; The door curtain made of cloth 4 adopts PVC Polypropylence Sheet, nonwoven or rubberized fabric; Vertically the hard plate material of barricade 5 employings is a kind of of high molecular weight polyethylene board material, irony sheet material or wooden boards; Sealing block 2 is block rubber or elastic polyurethane piece, and the contact surface of adjacent seals piece 2 is a lozenges 3; In the utility model, upper and lower two hydraulic cylinders 12 also can substitute with the double end hydraulic jack, control the up-down of two sealing blocks 2 through the two-piston bar of double end hydraulic jack.
During work; The front end of hydraulic support 16 is parallel to coal-face 9, and need the vertical barricade 5 common vertical barricades 5 of one side fillings that form of some groups of hydraulic supports 16 rear ends also sealed with the slit between the door curtain made of cloth 4 adjacent vertical barricades 5 according to the quantity of the definite phase of the width of coal-face 9 hydraulic support 16 side by side; Regulate the displacement of upper and lower two adjustable plates 10 and two sealing blocks 2 simultaneously through hydraulic cylinder 11; Sealing block 2 is closely contacted with top board 1, base plate 6, guarantees the sealing between vertical barricade 5 and top board 1, the base plate 6, then with high-water expansion filling material be filled into vertical barricade 5 and the confined space between the filling area 7 (that is: wait to fill the district 8 in; After treating that high-water expansion filling material solidifies; Coal-winning machine continues exploitation along coal-face 9, exploit a segment distance after (this distance be no more than stride for the first time apart from), some groups of hydraulic supports 16 move to coal-face 9 with coal-winning machine simultaneously; Repeat above-mentioned filling action then, filling while exploiting.

Claims (7)

1. airtight device for filling of mobile hydraulic; The some groups of hydraulic supports (16) that comprise parallel arranged; It is characterized in that: the rear end of every group of hydraulic support (16) connects the vertical barricade (5) of hard plate material through crossbeam (15); On the hydraulic support (16) respectively through gripper shoe (14) be installed with upper and lower two each other back to hydraulic cylinder (12); Piston rod (11) the top secured adjusted plate (10) of hydraulic cylinder (12); Adjustable plate (10) comprises perpendicular to a horizontal pressure foot (20) of piston rod (11) and is welded on horizontal pressure foot (20) two ends and is parallel to two vertical plates (22) of piston rod (11) that horizontal pressure foot (20) is fixed on piston rod (11) top, and vertical plate (22) is positioned at the inboard of vertical barricade (5); The outside of some vertical barricades (5) is provided with the holistic waterproof door curtain made of cloth (4); The upper/lower terminal of the door curtain made of cloth (4) is walked around upper and lower horizontal pressure foot (20) respectively and is connected with gripper shoe (14) through regulating spring (13), and the top of horizontal pressure foot (20) the top door curtain made of cloth (4) is provided with high polymer elastic sealing block (2), and sealing block (2) is connected with the door curtain made of cloth (4) through positioner.
2. the airtight device for filling of mobile hydraulic according to claim 1; It is characterized in that: described positioner comprises cylinder (17), bolt (18) and packing ring (19); Cylinder (17) and packing ring (19) are separately positioned on the upper and lower of the door curtain made of cloth (4); Cylinder (17) inside is provided with the screw that cooperates with bolt (18); Bolt (18) passes packing ring (19), the door curtain made of cloth (4) and is threaded with cylinder (17), and corresponding circle cylinder (17) is provided with detent in the bottom of sealing block (2), and cylinder (17) is arranged in detent.
3. the airtight device for filling of mobile hydraulic according to claim 1 is characterized in that: the left and right sides, top of described horizontal pressure foot (20) is provided with deflector roll (21), and the door curtain made of cloth (4) is walked around from two deflector rolls (21).
4. according to claim 1, the airtight device for filling of 2 or 3 described mobile hydraulics, it is characterized in that: the described door curtain made of cloth (4) is PVC Polypropylence Sheet, nonwoven or rubberized fabric.
5. the airtight device for filling of mobile hydraulic according to claim 1 is characterized in that: described hard plate material is a kind of of high molecular weight polyethylene board material, irony sheet material or wooden boards.
6. the airtight device for filling of mobile hydraulic according to claim 1 is characterized in that: the contact surface of adjacent seals piece (2) is lozenges (3).
7. according to claim 1 or the airtight device for filling of 6 described mobile hydraulics, it is characterized in that: described sealing block (2) is block rubber or elastic polyurethane piece.
CN2012201816668U 2011-12-02 2012-04-26 Mobile hydraulic seal filling device Withdrawn - After Issue CN202544923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201816668U CN202544923U (en) 2011-12-02 2012-04-26 Mobile hydraulic seal filling device

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201110396497.X 2011-12-02
CN201110396497XA CN102400700A (en) 2011-12-02 2011-12-02 Moveable type mechanical seal filling exploitation bracket
CN2012201816668U CN202544923U (en) 2011-12-02 2012-04-26 Mobile hydraulic seal filling device

Publications (1)

Publication Number Publication Date
CN202544923U true CN202544923U (en) 2012-11-21

Family

ID=45883303

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201110396497XA Pending CN102400700A (en) 2011-12-02 2011-12-02 Moveable type mechanical seal filling exploitation bracket
CN2012201816668U Withdrawn - After Issue CN202544923U (en) 2011-12-02 2012-04-26 Mobile hydraulic seal filling device
CN 201210125192 Expired - Fee Related CN102619543B (en) 2011-12-02 2012-04-26 Mobile type hydraulic airtight filling device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201110396497XA Pending CN102400700A (en) 2011-12-02 2011-12-02 Moveable type mechanical seal filling exploitation bracket

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN 201210125192 Expired - Fee Related CN102619543B (en) 2011-12-02 2012-04-26 Mobile type hydraulic airtight filling device

Country Status (1)

Country Link
CN (3) CN102400700A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619543A (en) * 2011-12-02 2012-08-01 淄博市王庄煤矿 Mobile type hydraulic airtight filling device
CN104405441A (en) * 2014-11-18 2015-03-11 武汉钢铁(集团)公司 Detachable filling and retaining wall

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437792B (en) * 2013-09-13 2016-12-07 陕西中能煤田有限公司 Filling sealing device and placement method thereof
CN103742147A (en) * 2014-01-17 2014-04-23 淄博王煤矿业有限公司 Coal mining technology by using continuous beam bridge type filling method
CN103742146B (en) * 2014-01-17 2016-02-03 淄博王煤矿业有限公司 Pier stud type filling method coal winning technology
CN105735347A (en) * 2016-04-13 2016-07-06 李远志 Formwork sealing material preventing root rotting of road bridge foundation engineering retaining wall
CN107178390B (en) * 2017-07-26 2023-07-25 淮南矿业(集团)有限责任公司 Movable lifting type coal mine goaf filling device
CN109356644B (en) * 2018-12-25 2021-03-19 江苏师范大学 Paste filling retaining wall system and mounting method thereof
CN112796830B (en) * 2021-02-05 2023-06-13 中煤科工集团西安研究院有限公司 Hydraulic support type sealing device for goaf filling
CN116842623B (en) * 2023-08-30 2023-11-10 武汉科技大学 Method and system for calculating, analyzing and reinforcing stability of filling retaining wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3818725A1 (en) * 1988-06-01 1989-12-14 Gewerk Eisenhuette Westfalia Support chock, in particular for use in pneumatic stowing operations
CN201025053Y (en) * 2007-03-29 2008-02-20 天地科技股份有限公司 Hydraulic pressure supporter for exploration filling on coal mine working ground
CN201539274U (en) * 2009-12-04 2010-08-04 沈阳市华祥矿山机械厂 Tank type filling hydraulic support
CN101892856B (en) * 2010-07-03 2012-07-25 霍州煤电集团有限责任公司 Special hydraulic support for underground filling coal mining of coal mine
CN102400700A (en) * 2011-12-02 2012-04-04 淄博市王庄煤矿 Moveable type mechanical seal filling exploitation bracket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619543A (en) * 2011-12-02 2012-08-01 淄博市王庄煤矿 Mobile type hydraulic airtight filling device
CN104405441A (en) * 2014-11-18 2015-03-11 武汉钢铁(集团)公司 Detachable filling and retaining wall

Also Published As

Publication number Publication date
CN102400700A (en) 2012-04-04
CN102619543A (en) 2012-08-01
CN102619543B (en) 2013-11-06

Similar Documents

Publication Publication Date Title
CN202544923U (en) Mobile hydraulic seal filling device
CN1920255B (en) Single bracket for retreating type pillar type mining during chamber-and-pillar working
CN201747390U (en) Suspension type multifunctional tunnel operation machine
CN101858215B (en) Road retained method for extrusion molding of waste rock
CN106968676B (en) Method for tunneling through cavity
CN102852551A (en) Gob-side entry retaining method using high-water material filling columns
CN103437792B (en) Filling sealing device and placement method thereof
CN203362198U (en) Track walking type immediate support device of fully-mechanized drivage roadway
CN105221185A (en) A kind of coal winning technology
CN205025481U (en) Gangue filling hydraulic support
CN205025484U (en) Electrohydraulic control waste filling mines hydraulic support
CN110159327B (en) Continuous tunneling temporary support device and method for tunnel with separated tunneling and anchoring
CN201539278U (en) Filling formwork support
CN208996752U (en) A kind of soft mould filling mining bracket
CN201344041Y (en) Stepping self-moving type bracket
CN102031985B (en) Walking support
CN103075188B (en) Downhole waste rock filling equipment and filling method using same
CN202659267U (en) Integral graded spanning-type walking bracket
CN105178998A (en) Hydraulic support for waste rock filling
CN210141146U (en) Narrow body rotary four-arm jumbolter for coal mine
CN201786365U (en) Hydraulic telescopic bracket for borehole coal mine
CN203570313U (en) Double-alley chain type stoping and filling arrangement structure
CN202645601U (en) Roadway support machine
CN206972299U (en) A kind of moving lift type coal mine gob filling device
CN105971649A (en) Whole set of supporting equipment for roof cutting entry retaining

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121121

Effective date of abandoning: 20131106

RGAV Abandon patent right to avoid regrant