CN202544907U - Drilling, diversion, dust-settling and gas spray-preventing device - Google Patents

Drilling, diversion, dust-settling and gas spray-preventing device Download PDF

Info

Publication number
CN202544907U
CN202544907U CN2012201491346U CN201220149134U CN202544907U CN 202544907 U CN202544907 U CN 202544907U CN 2012201491346 U CN2012201491346 U CN 2012201491346U CN 201220149134 U CN201220149134 U CN 201220149134U CN 202544907 U CN202544907 U CN 202544907U
Authority
CN
China
Prior art keywords
air duct
flexible back
back bone
transferring box
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012201491346U
Other languages
Chinese (zh)
Inventor
林柏泉
张连军
王春利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU BOAN TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
XUZHOU BOAN TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU BOAN TECHNOLOGY DEVELOPMENT Co Ltd filed Critical XUZHOU BOAN TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN2012201491346U priority Critical patent/CN202544907U/en
Application granted granted Critical
Publication of CN202544907U publication Critical patent/CN202544907U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The utility model discloses a drilling, diversion, dust-settling and gas spray-preventing device, which mainly comprises a framework wind-cone device, a transferring box and a manual flange butterfly valve, wherein the framework wind-cone device comprises a flexible framework wind-cone; both sides of the top of the flexible framework wind-cone are provided with hooks; the lower part of the flexible framework wind-cone is provided with a water coal slag collecting box; the upper part of the flexible framework wind-cone is provided with a universal joint; the middle part of the flexible framework wind-cone is provided with a transparent observation window; the side face of the flexible framework wind-cone is provided with an air suction tube; the transferring box is provided with an air inlet, an air outlet and an observation hole, the air inlet of the transferring box is connected with the air suction tube; the air outlet of the transferring box is connected with an extraction tube; and the manual flange butterfly valve is arranged on the joint of the extraction tube and an extraction pipeline connecting tube. Due to the adoption of the drilling, diversion, dust-settling and gas spray-preventing device, the working efficiencies of drilling and extraction on a coal layer can be greatly increased, the labor intensity of workers is effectively lowered simultaneously, and the personal safety of construction workers is ensured. The device is simple in structure, and has a good extraction effect.

Description

The bore diversion depositing dust is prevented the feeder device
Technical field
The utility model relates to a kind of dedusting blowout hookup, especially a kind of anti-feeder device of bore diversion depositing dust that is applicable under the coal mine.
Background technology
In the seam mining process,, reach the purpose that reduces or eliminate coal-bed gas hidden danger through to the coal bed drilling gas pumping.In the coal-bed gas extraction, also do not have at present perfect, the extraction of integral orifice blowout prevention targetedly device, main cause is that each equipment is in independent user mode.So-called independent user mode, promptly unit uses and disperses and do not concentrate, at needs to the boring deslagging, the aperture depositing dust, when water conservancy diversion, anti-feeder, various work have independent complex apparatus to accomplish respectively, can not form unified allomeric function fast.Cause potential safety hazard phenomenon big by labour intensity and the repetition construction operation, and the extraction effect is not up to standard.Therefore, repeating to construct, simplify and required time is installed, reaches the extraction technical requirements, is improved the promptness of hole pumping and mining for reducing labor strength and minimizing, is on-the-spot anxious problem to be solved.
Summary of the invention
Technical problem: the purpose of the utility model is the weak point that overcomes in the prior art, provide a kind of simple in structure, the extraction effect is up to standard, reduce labor strength, the anti-feeder device of the bore diversion depositing dust of construction safety.
Technical scheme: the bore diversion depositing dust of the utility model is prevented the feeder device, comprises skeleton air duct device, transferring box, manual flange form butterfly valve; Described skeleton air duct device comprises the flexible back bone air duct; The both sides, top of flexible back bone air duct are interval with the hook that flexibly connects with wall; Flexible back bone air duct bottom is provided with water cinder collecting box; The top of flexible back bone air duct is provided with is convenient to the universal joint that drilling rod passes, and universal joint and outside, flexible back bone air duct junction are provided with the universal joint fixed head, and inside is lined with one and slows down the square belt that coal dust impacts; The middle part of flexible back bone air duct is provided with transparent windows, and flexible back bone air duct side is provided with aspiration channel, and aspiration channel and flexible back bone air duct junction are provided with the aspiration channel fixed head; Described transferring box is provided with air inlet port, exhaust opening, peep hole; The bottom of transferring box is provided with slag-drip opening; The air inlet port of transferring box links to each other with aspiration channel; The exhaust opening of transferring box links to each other with extraction pipe on being connected extraction pipeline tube connector, and the junction of extraction pipe and extraction pipeline tube connector is provided with manual flange form butterfly valve; The outside of flexible back bone air duct is provided with portable watt of inspection appearance.
Described aspiration channel is two, and asymmetric arrangement is in the both sides of flexible back bone air duct; Described extraction pipe is two, respectively through manual flange form butterfly valve and be connected on the extraction pipeline tube connector; Air inlet port on the said transferring box, exhaust opening, peep hole are two, and the transferring box inner bottom part is provided with the deflector to the inclination of slag-drip opening direction; Described universal joint is provided with the nylon guide ring.
Beneficial effect: owing to adopted technique scheme; Adopt flexible back bone air duct and wall to flexibly connect; Coal dust is removed clean through transferring box and water cinder collecting box; Can significantly improve the operating efficiency of carrying out hole pumping and mining in the coal seam, effectively reduce labor strength simultaneously, ensure construction working personnel's personal safety.Reduced labor strength and the potential safety hazard that repeats to construct and possibly cause, it is simple in structure, and extraction is effective, has practicality widely.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: 1-flexible back bone air duct, 2-aspiration channel, 3-transferring box, 4-extraction pipe; The manual flange form butterfly valve of 5-, 6-extraction pipeline tube connector, 7-universal joint fixed head, 8-aspiration channel fixed head; The 9-transparent windows, 10-hook, 11-water cinder collecting box, 12-universal joint; 13-nylon guide ring, 14-belt, 15-anchor ear, 16-watt of inspection appearance.
The specific embodiment
To combine accompanying drawing that an embodiment of the utility model is further described below:
As shown in Figure 1, the bore diversion depositing dust of the utility model is prevented the feeder device, mainly is made up of skeleton air duct device, aspiration channel 2, transferring box 3, extraction pipe 4, manual flange form butterfly valve 5; Described skeleton air duct device comprises flexible back bone air duct 1; The both sides, top of flexible back bone air duct 1 are interval with the hook 10 that flexibly connects with wall; Flexible back bone air duct 1 bottom is provided with water cinder collecting box 11; Collecting box 11 inner bottom parts are provided with to underflow opening direction inclined guide plate, and underflow opening is over against the gutter.The top of flexible back bone air duct 1 is provided with is convenient to the universal joint 12 that drilling rod passes, and universal joint 12 is provided with nylon guide ring 13.Universal joint 12 is provided with universal joint fixed head 7 with outside, flexible back bone air duct 1 junction, and inside is lined with one and slows down the square belt 14 that coal dust impacts, in case coal dust impact failure flexible back bone air duct 1.Open " ten " font opening on the flexible back bone air duct 1 at universal joint 12 places, pass flexible back bone air duct 1 through nylon guide ring 13 and square belt 14, get into boring and implement bore operation to make things convenient for the coal seam drilling rod.The middle part of flexible back bone air duct 1 is provided with transparent windows 9; Flexible back bone air duct 1 side is provided with aspiration channel 2; Aspiration channel 2 is two, and asymmetric arrangement is in the both sides of flexible back bone air duct 1, and two aspiration channels 2 are equipped with aspiration channel fixed head 8 with flexible back bone air duct 1 junction; Aspiration channel fixed head 8 is provided with the gingival cyst of mucous gland in the newborn button, and two aspiration channels 2 are tightly connected through the gingival cyst of mucous gland in the newborn button on anchor ear 15 and the aspiration channel fixed head 8.Described transferring box 3 is provided with air inlet port, exhaust opening, peep hole, and the air inlet port on the transferring box 3, exhaust opening, peep hole are two, and transferring box 3 inner bottom parts are provided with the deflector to the inclination of slag-drip opening direction.Transferring box 3 is positioned over water cinder collecting box 11 1 side 3-5 rice; The bottom of transferring box 3 is provided with slag-drip opening; Slag-drip opening aligns the gutter, and the slag-drip opening place is provided with the flange that is threaded with scum pipe, and transferring box 3 is not tightly connected through the gingival cyst of mucous gland in the newborn deduction of points with aspiration channel 2 and extraction pipe 4; Two air inlet ports of transferring box 3 link to each other with two aspiration channels 2 respectively; Two exhaust openings of transferring box 3 connect two extraction pipes 4 respectively, and the junction of extraction pipe 4 and extraction pipeline tube connector 6 is provided with 5, two extraction pipes 4 of manual flange form butterfly valve respectively through manual flange form butterfly valve 5 and be connected on the extraction pipeline tube connector 6; The outside of flexible back bone air duct 1 is provided with portable watt of inspection appearance 16, so that guarantee in the work progress that gas does not transfinite in the tunnel, can shift to an earlier date the warning reminding staff and make a response.
The course of work: flexible back bone air duct 1 is fixed on the prebored hole position through linking up with 10; Require flexible back bone air duct 1 to cover prebored hole aperture powder delivery direction position fully; Drilling rod creeps into to the coal seam after universal joint 12 passes flexible back bone air duct 1, the sagging naturally water cinder collecting box 11 that is connected to of flexible back bone air duct 1.Stop the extraction pump work, extraction pipeline tube connector 6 is installed, close two manual flange form butterfly valves 5 in the connection procedure.Whether preoperation inspection extraction pipeline 4, aspiration channel 2, flexible back bone air duct 1 are connected correctly anchor ear 15 fixations with transferring box 3.The concentration value of record aperture gas density and tunnel mash gas extraction, the startup brill cuts device and holes, and as permeable medium, the rig operator can adjust form of construction work through transparent windows 9 observation boring deslagginves and hole internal return regimen condition with water at atmospheric pressure.When water outlet coal dust free or water quality are clear, can creep into; When finding not return water, should first pressure regulation, keep the drilling rod rotation, the push-and-pull drilling rod, or adopt to move back to bore and remove two drilling rods, the row's of giving powder slot milling is beneficial to coal dust and discharges from the aperture.In the course of work, scalable is opened aperture size one or two manual flange form butterfly valve 5 or single manual flange form butterfly valve 5, with the control vacuum magnitude, controls the work of extraction pipe 4, realizes the purpose of efficient extraction.When opening a manual flange form butterfly valve 5, the extraction suction function is in an extraction pipe 4, and negative pressure is big, but the mash gas extraction flow is little; When opening two manual flange form butterfly valves 5, the extraction suction function is in two extraction pipes 4, and negative pressure is little, but the mash gas extraction flow is big.At any time observe the numerical value change of watt inspection appearance 16, when spray orifice takes place when, gas amount moment increase; Concentration surpasses 0.6% o'clock of normal value; Two manual flange form butterfly valves 5 are opened fully, made in the hole and the aperture negative pressure is enough to accomplish extraction, proceed with the protection bore operation.After a drill site uses, close manual flange form butterfly valve 5, readjust the extraction pipeline, or move to next drill site continuation construction.

Claims (5)

1. a bore diversion depositing dust is prevented the feeder device, it is characterized in that: it comprises skeleton air duct device, transferring box (3), manual flange form butterfly valve (5); Described skeleton air duct device comprises flexible back bone air duct (1); The both sides, top of flexible back bone air duct (1) are interval with the hook (10) that flexibly connects with wall; Flexible back bone air duct (1) bottom is provided with water cinder collecting box (11); The top of flexible back bone air duct (1) is provided with the universal joint (12) of being convenient to drilling rod and passing; Universal joint (12) is provided with universal joint fixed head (7) with flexible back bone air duct (1) outside, junction, and inside is lined with one and slows down the square belt (14) that coal dust impacts; The middle part of flexible back bone air duct (1) is provided with transparent windows (9), and flexible back bone air duct (1) side is provided with aspiration channel (2), and aspiration channel (2) is provided with aspiration channel fixed head (8) with flexible back bone air duct (1) junction; Described transferring box (3) is provided with air inlet port, exhaust opening, peep hole; The bottom of transferring box (3) is provided with slag-drip opening; The air inlet port of transferring box (3) links to each other with aspiration channel (2); The exhaust opening of transferring box (3) links to each other with extraction pipe (4) on being connected extraction pipeline tube connector (6), and extraction pipe (4) is provided with manual flange form butterfly valve (5) with the junction of extraction pipeline tube connector (6); The outside of flexible back bone air duct (1) is provided with portable watt of inspection appearance (17).
2. bore diversion depositing dust according to claim 1 is prevented the feeder device, it is characterized in that, described aspiration channel (2) is two, and asymmetric arrangement is in the both sides of flexible back bone air duct (1).
3. bore diversion depositing dust according to claim 1 is prevented the feeder device, it is characterized in that, described extraction pipe (4) is two, respectively through manual flange form butterfly valve (5) and be connected on the extraction pipeline tube connector (6).
4. bore diversion depositing dust according to claim 1 is prevented the feeder device, it is characterized in that, air inlet port, exhaust opening, the peep hole on the said transferring box (3) is two, and transferring box (3) inner bottom part is provided with the deflector to the inclination of slag-drip opening direction.
5. bore diversion depositing dust according to claim 1 is prevented the feeder device, it is characterized in that, described universal joint (12) is provided with nylon guide ring (13).
CN2012201491346U 2012-04-11 2012-04-11 Drilling, diversion, dust-settling and gas spray-preventing device Withdrawn - After Issue CN202544907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201491346U CN202544907U (en) 2012-04-11 2012-04-11 Drilling, diversion, dust-settling and gas spray-preventing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201491346U CN202544907U (en) 2012-04-11 2012-04-11 Drilling, diversion, dust-settling and gas spray-preventing device

Publications (1)

Publication Number Publication Date
CN202544907U true CN202544907U (en) 2012-11-21

Family

ID=47165559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201491346U Withdrawn - After Issue CN202544907U (en) 2012-04-11 2012-04-11 Drilling, diversion, dust-settling and gas spray-preventing device

Country Status (1)

Country Link
CN (1) CN202544907U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606191A (en) * 2012-04-11 2012-07-25 徐州博安科技发展有限责任公司 Drilling, flow guiding, dust falling and gas blowout control device
CN103046948A (en) * 2013-01-15 2013-04-17 中国矿业大学 Device and method for preventing coal drilling and cutting or gas emission
CN104120989A (en) * 2014-07-16 2014-10-29 平顶山市铁福来机电设备有限公司 Gas and cinder collecting and separating device for coal mine punching
CN104120988A (en) * 2014-07-16 2014-10-29 平顶山市铁福来机电设备有限公司 Blowout prevention collecting device for coal mine punching

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606191A (en) * 2012-04-11 2012-07-25 徐州博安科技发展有限责任公司 Drilling, flow guiding, dust falling and gas blowout control device
CN102606191B (en) * 2012-04-11 2014-10-01 徐州博安科技发展有限责任公司 Drilling, flow guiding, dust falling and gas blowout control device
CN103046948A (en) * 2013-01-15 2013-04-17 中国矿业大学 Device and method for preventing coal drilling and cutting or gas emission
CN104120989A (en) * 2014-07-16 2014-10-29 平顶山市铁福来机电设备有限公司 Gas and cinder collecting and separating device for coal mine punching
CN104120988A (en) * 2014-07-16 2014-10-29 平顶山市铁福来机电设备有限公司 Blowout prevention collecting device for coal mine punching

Similar Documents

Publication Publication Date Title
CN202544907U (en) Drilling, diversion, dust-settling and gas spray-preventing device
CN108301799A (en) A kind of hole pumping and mining dust-extraction unit and its application method
CN202325631U (en) Gas-slag separating and coalbed gas recycling device for downhole drilling of coal mine
CN202176355U (en) Coal mine downhole drilling hole dust-reducing device
CN104481580B (en) A kind of down-hole coal bed mash gas pumping drilling restorative procedure and the device of use thereof
CN103410461B (en) A kind of three anti-devices of drilling in process
CN102996160B (en) A kind of safety device anti-reflection for water jet slot and method
CN103195469A (en) Pneumatic type gas and slag separation device and method
CN201560795U (en) Apparatus for controlling dust with wind as medium during boring construction for gas drainage
CN112228143A (en) Drainage, slag discharge, exhaust, blowout prevention and dust prevention device for multi-stage gas extraction drilling orifice
CN205918391U (en) Coalbed gas blowout preventer
CN202250165U (en) Integration device for separating gas and water and discharging water and slag for drill hole in gas extraction crossheading drill site
CN202970548U (en) Gas jet flow dust collector for mine drilling
CN208203184U (en) A kind of hole pumping and mining dust-extraction unit
CN102606191B (en) Drilling, flow guiding, dust falling and gas blowout control device
CN214464354U (en) Drainage, slag discharge, exhaust, blowout prevention and dust prevention device for multi-stage gas extraction drilling orifice
CN102434195A (en) Rock crossing hole blowout preventor
CN213510709U (en) Colliery dust safety breather
CN209780950U (en) Automatic integrated device that discharges of coal seam gas drainage and drilling ponding
CN202767919U (en) Mining drilling drainage and dust removal device
CN209145488U (en) Multicutter combines large-scale vertical drilling drilling system
CN201202493Y (en) Safe operating and controlling protector
CN201686706U (en) Water atomizing device of blast furnace tapping machine
CN202348316U (en) Air screen and water mist linkage system for preventing fully mechanized excavation face dusts
CN203463050U (en) Three-proofing device in drilling process

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121121

Effective date of abandoning: 20141001

RGAV Abandon patent right to avoid regrant