CN202544417U - Novel concrete pump truck - Google Patents
Novel concrete pump truck Download PDFInfo
- Publication number
- CN202544417U CN202544417U CN2012201723555U CN201220172355U CN202544417U CN 202544417 U CN202544417 U CN 202544417U CN 2012201723555 U CN2012201723555 U CN 2012201723555U CN 201220172355 U CN201220172355 U CN 201220172355U CN 202544417 U CN202544417 U CN 202544417U
- Authority
- CN
- China
- Prior art keywords
- pump truck
- monitor
- camera
- conveying pipe
- carrier pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a novel concrete pump truck, belonging to the field of civil engineering equipment. The novel concrete pump truck comprises a pump truck, a camera, a conveying pipe and a monitor, wherein the conveying pipe is installed on the pump truck; the camera is installed at the outlet of the conveying pipe; the monitor is installed in the truck head of the pump truck; and the monitor is connected with the camera through a signal line. A driver can see the specific position of the pipe orifice of the conveying pipe through the monitor, and concrete is avoided from being conveyed to a wrong position by the conveying pipe.
Description
Technical field
The utility model relates to a kind of concrete mixer, mainly is a kind of concrete mixer with surveillance, belongs to the civil engineering plant field.
Background technology
Fast development along with realty industry; It is increasingly high that the house is built; The general at present concrete mixer that uses to carry mixed earth to more than 10 meters eminences, because highly high, the driver of concrete mixer can't see carrier pipe at all and whether aims at the place that will carry; Often causing mistake to carry, is a urgent problem.
Summary of the invention
The purpose of the utility model provides a kind of new concrete pump truck.
The problem that the utility model will solve is that the driver of existing concrete pump truck can't see the deficiency whether carrier pipe aims at the place that will carry.
For realizing the purpose of the utility model, the technical scheme that the utility model adopts is:
The new concrete pump truck comprises pump truck, camera, carrier pipe and monitor, and carrier pipe is installed on the pump truck, and the carrier pipe exit is equipped with camera, in the headstock of pump truck monitor is installed, and monitor is connected with camera through holding wire.
The utility model has the advantages that: the driver just can see the particular location of the carrier pipe mouth of pipe at driver's cabin through monitor, can avoid carrier pipe to carry wrong position to mixed earth, should have the vast market space.
Description of drawings
Fig. 1 is the sketch map of the utility model new concrete pump truck;
Among the figure: 1, pump truck 2, camera 3, carrier pipe 4, monitor.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described.
The new concrete pump truck; Comprise pump truck 1, camera 2, carrier pipe 3 and monitor 4; Carrier pipe 3 is installed on the pump truck 1, and carrier pipe 3 exits are equipped with camera 2, and monitor 4 is installed in the headstock of pump truck 1; Monitor 4 is connected with camera 2 through holding wire, can see the picture that camera 2 captures on the monitor 4.
The method for using of this device: the driver just can see the particular location of carrier pipe 3 mouths of pipe at driver's cabin through monitor 4, can avoid carrier pipe 3 to carry wrong position to mixed earth, uses also simple.
Claims (1)
1. new concrete pump truck; Comprise pump truck (1), camera (2), carrier pipe (3) and monitor (4); It is characterized in that: carrier pipe (3) is installed on the pump truck (1); Carrier pipe (3) exit is equipped with camera (2), and monitor (4) is installed in the headstock of pump truck (1), and monitor (4) is connected with camera (2) through holding wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201723555U CN202544417U (en) | 2012-04-23 | 2012-04-23 | Novel concrete pump truck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201723555U CN202544417U (en) | 2012-04-23 | 2012-04-23 | Novel concrete pump truck |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202544417U true CN202544417U (en) | 2012-11-21 |
Family
ID=47165069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201723555U Expired - Fee Related CN202544417U (en) | 2012-04-23 | 2012-04-23 | Novel concrete pump truck |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202544417U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790670A (en) * | 2015-04-08 | 2015-07-22 | 深圳市富斯遥控模型技术有限公司 | Automatic cement pouring system based on remote control |
CN108737792A (en) * | 2018-07-15 | 2018-11-02 | 河南中建西部建设有限公司 | A kind of visualization device for monitoring distal end working performance of concrete |
-
2012
- 2012-04-23 CN CN2012201723555U patent/CN202544417U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790670A (en) * | 2015-04-08 | 2015-07-22 | 深圳市富斯遥控模型技术有限公司 | Automatic cement pouring system based on remote control |
CN108737792A (en) * | 2018-07-15 | 2018-11-02 | 河南中建西部建设有限公司 | A kind of visualization device for monitoring distal end working performance of concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202544417U (en) | Novel concrete pump truck | |
CN203191729U (en) | Intelligent remote industrial control system | |
CN106128163A (en) | A kind of intelligent management system of tourist attraction | |
CN206648862U (en) | A kind of air V OCs orients sampling system | |
CN203338096U (en) | A data acquisition and control system achieving a pipeline flushing function | |
CN205983869U (en) | Intelligent management system of tourist attraction based on cloud platform | |
CN201599041U (en) | Synchronous slip casting device for shielding machine | |
CN203463139U (en) | Pressure differential dust suppressant adding device | |
CN203309521U (en) | City pipe network pressure remote measurement terminal | |
CN204962298U (en) | Remote monitering system of long distance slurry pipeline based on sound location | |
CN202706567U (en) | Concrete pump truck with pumping height monitoring system | |
CN203492054U (en) | An intelligent sanitation Beidou emergency command monitoring management dispatching system | |
CN203552018U (en) | Powder coating transport means | |
CN202334912U (en) | Radio network test device based on general packet radio service (GPRS) networking | |
CN203444114U (en) | ADS-B beacon based on satellite positioning | |
CN204068068U (en) | A kind of threading apparatus seeker and the threading apparatus made | |
CN201746136U (en) | Transport cart inlet filtering device | |
CN203702182U (en) | High pressure air grouting device for reinforcing weak surrounding rock of tunnel and underground construction | |
CN202708157U (en) | Mine essence safety type electric ball valve | |
CN202422590U (en) | Communication wire transmitting/receiving tag fixing device | |
CN202828826U (en) | Novel frequency conversion pipeline transport device | |
CN201851882U (en) | Filling and recovery apparatus for harmful gases | |
CN203101961U (en) | PLC control system | |
CN202737977U (en) | Remote mobile phone remote control system based on GSM wireless transmission technology | |
CN202886944U (en) | Continuous feeding system in cobalt-compound production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121121 Termination date: 20130423 |