CN202541746U - Front fork riser and stand pipe combined structure for bicycle - Google Patents

Front fork riser and stand pipe combined structure for bicycle Download PDF

Info

Publication number
CN202541746U
CN202541746U CN2012200517207U CN201220051720U CN202541746U CN 202541746 U CN202541746 U CN 202541746U CN 2012200517207 U CN2012200517207 U CN 2012200517207U CN 201220051720 U CN201220051720 U CN 201220051720U CN 202541746 U CN202541746 U CN 202541746U
Authority
CN
China
Prior art keywords
vertical tube
front fork
bicycle
unitized construction
pivot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200517207U
Other languages
Chinese (zh)
Inventor
郭文嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JD Components Co Ltd
Original Assignee
JD Components Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JD Components Co Ltd filed Critical JD Components Co Ltd
Priority to CN2012200517207U priority Critical patent/CN202541746U/en
Application granted granted Critical
Publication of CN202541746U publication Critical patent/CN202541746U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steering Devices For Bicycles And Motorcycles (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a front fork riser and stand pipe combined structure for a bicycle. An upper binding part and a lower binding part are sleeved on the front fork riser, the upper binding part is positioned between an upper cover and a stand pipe of a fastening component, and the lower binding part is positioned at the bottom edge of the stand pipe, so that the stability on the integral structure is increased, and the position of the lower binding part can be adjusted to coordinate with stand pipes with different sizes.

Description

The vertical tube of front fork of bicycle and the unitized construction of vertical tube
Technical field
The utility model is relevant with bicycle, particularly relevant for a kind of unitized construction of vertical tube of front fork and vertical tube of bicycle.
Background technology
General bicycle mainly all is the control that is turned to by handgrip; Handgrip all is an end that is fixed on vertical tube usually; The other end of vertical tube then is the top of being fixed in vertical tube of front fork, the bottom of vertical tube of front fork again with the front-wheel winding, therefore; The rider can pass through handgrip, vertical tube, and vertical tube of front fork is controlled front-wheel and turned to.
Yet assembling with regard to present vertical tube of front fork and vertical tube; Except the garter spring that utilizes vertical tube one end is tightened the vertical tube of front fork; Usually the packing assembly of also can arranging in pairs or groups again is fixed in vertical tube with vertical tube of front fork; But it is quite limited to depend the fixed effect that such structure design can provide alone, so be easy in the process of driving, influence the structural stability between vertical tube of front fork and the vertical tube because of constantly bearing vibrations.
The utility model content
The purpose of the utility model is to provide a kind of unitized construction of vertical tube of front fork and vertical tube of bicycle, to improve the defective that exists in the known technology.
For realizing above-mentioned purpose, the vertical tube of front fork of the bicycle that the utility model provides and the unitized construction of vertical tube include:
One vertical tube of front fork;
One vertical tube has a sleeve joint hole, in order to be sheathed on this vertical tube of front fork;
One quick detach assembly is located at this vertical tube, in order to this vertical tube is fixed in this vertical tube of front fork;
Restraint part on one, be located at the top of this vertical tube of front fork;
One packing assembly has a loam cake, and the top and the packing that are covered on this vertical tube of front fork on this should be gone up the bundle part; And
Restraint part once, be located at this vertical tube of front fork and be positioned at the root edge of this vertical tube.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube wherein are provided with a lining between this vertical tube of front fork and this vertical tube.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube, wherein this lining is located at and is had a retaining edge in the sleeve joint hole of this vertical tube and in its top, this retaining edge this vertical tube with should on restraint between the part.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube, wherein this lining has a profile groove, makes this lining can receive the external force effect and produces radial deformation.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube; Wherein this packing assembly has a bolt and a flower tooth; But this bolt original place is arranged in this loam cake rotationally; This flower tooth is located in this front fork body and spiral shell is located at this bolt, can receive driving and the inner tubal wall of this front fork body of packing of this bolt.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube; Wherein this vertical tube has an articulated section; This quick detach assembly has a pivot, leader, and an adapter shaft, and this pivot is located at the articulated section of this vertical tube pivotly; This handle pivot is located at this pivot, and the two ends of this adapter shaft connect this vertical tube and this pivot respectively.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube, wherein this handle has an ear, in order to be hubbed at an end of this pivot.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube, wherein this handle has two ears, in order to be hubbed at the two ends of this pivot.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube, wherein this adapter shaft has an adjustment sleeve and an axostylus axostyle, and this adjustment sleeve spiral shell is located at this vertical tube, and an end of this axostylus axostyle is sheathed on this pivot, and the other end of this axostylus axostyle is connected in this adjustment sleeve.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube, wherein this vertical tube has a rotating limit block, and one of them of this upper and lower bundle spare has a limit turn trough, and the rotating limit block that supplies this vertical tube is embedded and limits the rotational angle of this vertical tube.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube, wherein this vertical tube of front fork has an internal thread part, and this loam cake has an external thread part, and this loam cake is located at the internal thread part of this vertical tube of front fork by this external thread part spiral shell and is fixed in the top of this vertical tube of front fork.
The vertical tube of front fork of said bicycle and the unitized construction of vertical tube; Wherein the bottom of this vertical tube of front fork has one first inclined-plane; This packing assembly has a bolt and a clamp holder; But this bolt original place is arranged in this vertical tube of front fork rotationally, and this clamp holder spiral shell is located at the terminal of this bolt and is had second inclined-plane that amplexiforms each other with this first inclined-plane, can receive driving and this vertical tube of front fork oblique course relatively of this bolt.
The vertical tube of front fork of the bicycle that the utility model provides and the unitized construction of vertical tube can increase integrally-built stability, and can be suitable for the vertical tube of different size.
The vertical tube of front fork of the bicycle that the utility model provides and the unitized construction of vertical tube can be by the positions of adjustment quick detach assembly, and change the connection relationship between vertical tube and vertical tube of front fork, taking in and transporting with convenient car body voluntarily.
Description of drawings
Fig. 1 is the block diagram of the utility model first preferred embodiment.
Fig. 2 is the three-dimensional exploded view of the utility model first preferred embodiment.
Fig. 3 is the part sectional view of the utility model first preferred embodiment.
Fig. 4 is that the utility model first preferred embodiment is in the birds-eye view of receiving state.
Fig. 5 is the block diagram of the utility model second preferred embodiment.
Fig. 6 is the block diagram of the utility model the 3rd preferred embodiment.
Fig. 7 is the cutaway view of the utility model the 3rd preferred embodiment.
Primary clustering nomenclature in the accompanying drawing:
First embodiment
10 unitized constructions, 12 vertical tube of front fork, 14 vertical tubes, 141 garter springs, 142 sleeve joint holes, 144 articulated sections, 146 installation portions; 148 rotating limit blocks, 16 linings, 162 retaining edge, 164 profile grooves, 20 quick detach assemblies, 21 pivots, 22 handles; 221 ears, 23 adapter shafts, 24 adjustment sleeves, 25 axostylus axostyles, 26 latch fittings are restrainted part on 30; 40 packing assemblies, 42 loam cakes, 44 bolts, 46 flower teeth, 50 times bundle parts, 52 limit turn troughs;
Second embodiment
60 unitized constructions, 61 vertical tube of front fork, 62 vertical tubes, 63 quick detach assemblies, 64 pivots, 65 handles, 652 ears;
The 3rd embodiment
70 unitized constructions, 71 vertical tube of front fork, 712 internal thread parts, 713 first inclined-planes, 72 vertical tubes are restrainted part, 80 packing assemblies, 82 loam cakes, 822 external thread parts, 84 bolts, 86 clamp holders, 862 second inclined-planes, 864 packing faces, 90 vehicle frame pipes on 73.
The specific embodiment
The vertical tube of front fork of the utility model and the unitized construction of vertical tube include restraints part, a packing assembly on a vertical tube of front fork, a vertical tube, the quick detach assembly,, and restraints part once.This vertical tube is sheathed on this vertical tube of front fork with a sleeve joint hole; This quick detach assembly is located at this vertical tube, in order to this vertical tube is fixed in this vertical tube of front fork; Should go up the bundle part and be located at the top of this vertical tube of front fork; This packing assembly has a loam cake, and the top and the packing that are covered on this vertical tube of front fork on this should be gone up the bundle part; This time bundle part is located at this vertical tube of front fork and is positioned at the root edge of this vertical tube.By the design of this upper and lower bundle spare, can increase integrally-built stability really, this time bundle part can cooperate the vertical tube of different size to carry out the adjustment of position in addition, cooresponding convenience in the use.
In the unitized construction of vertical tube of front fork that the utility model provided and vertical tube, the loam cake of this packing assembly can be fixed in this vertical tube of front fork through the collocation of a bolt and a flower tooth, perhaps also directly spiral shell be located at the top of this vertical tube of front fork.
In the unitized construction of vertical tube of front fork that the utility model provided and vertical tube; This quick detach assembly has a pivot, leader; An and adapter shaft; This pivot is located at an articulated section of this vertical tube pivotly, and an end of this handle has one or two ear and this pivot forms pivot joint, and the two ends of this adapter shaft connect this vertical tube and this pivot respectively.
Following conjunction with figs. is also enumerated following preferred embodiment, is elaborated in order to structure and effect to the utility model.
Please consult Fig. 1 and Fig. 2 earlier; Unitized construction 10 for the vertical tube of front fork 12 and the vertical tube 14 of the utility model first preferred embodiment; Include bundle part 30, a packing assembly 40 on a vertical tube of front fork 12, a vertical tube 14, a lining 16, the quick detach assembly 20,, and restraint part 50 once.
One end of vertical tube 14 is used the handgrip assembling for bicycle; The other end has a garter spring 141, and garter spring 141 end wises run through a sleeve joint hole 142, in order to the top of sheathed vertical tube of front fork 12; The two ends of garter spring 141 extend outward an articulated section 144 and an installation portion 146 respectively again; In addition, as shown in Figure 3, the root edge of garter spring 141 stretches out a rotating limit block 148 downwards.
As shown in Figure 3, lining 16 is located in the sleeve joint hole 142 of vertical tube 14 and between the hole wall of the sleeve joint hole 142 of the outer tube wall of vertical tube of front fork 12 and vertical tube 14, is worn and torn in order to avoid producing between vertical tube of front fork 12 and the vertical tube 14.The top of lining 16 has a retaining edge 162, is located at the end face of the garter spring 141 of vertical tube 14 in order to retaining, lets lining 16 can not come off from the sleeve joint hole 142 of vertical tube 14, and in addition, lining 16 has a profile groove 164, makes lining 16 can receive the external force effect and produces radial deformation.
Quick detach assembly 20 has a pivot 21, leader 22, and an adapter shaft 23.The two ends of pivot 21 are hubbed at the articulated section 144 of vertical tube 14 respectively via a latch fitting 26; Handle 22 has two ears 221 in the present embodiment, and is hubbed at the two ends of pivot 21 respectively with this two ear 221; Adapter shaft 23 has an adjustment sleeve 24 and an axostylus axostyle 25, and adjustment sleeve 24 spiral shells are located at the installation portion 146 of vertical tube 14, and an end of axostylus axostyle 25 is sheathed on pivot 21; The other end of axostylus axostyle 25 is locked on adjustment sleeve 24 via a latch fitting 26; Thus, when compressing handle 22, the garter spring 141 of vertical tube 14 will produce radial shrinkage; In order to vertical tube 14 is tightened on the top of vertical tube of front fork 12, vertical tube 14 will produce the interlock of one with vertical tube of front fork 12.On the contrary; When release handle 22, the garter spring 141 of vertical tube 14 disappears for the strength that tightens up of vertical tube of front fork 12 outer peripheral faces, and vertical tube 14 can be with respect to vertical tube of front fork 12 rotations; As shown in Figure 4; Let vertical tube 14 take in Shi Buhui and drive the front-wheel rotation, make things convenient for the rider to carry out taking in and transporting of car body thus, also can apply to the folding design of folding car simultaneously through vertical tube of front fork 12 in rotation.
And when rotating adjustment sleeve 24; Can change the screwed distance of 146 of adjustment sleeve 24 and vertical tube 14 installation portions; That is change between adjustment sleeve 24 and the axostylus axostyle 25 annexation; And then impel drive shaft rod 25 to produce longitudinal travel, and can adjust the elasticity of handle 22 when operation thus, when axostylus axostyle 25 moves, can establish and can not produce in addition and separate through the lock of latch fitting 26 with adjustment sleeve 24.
Last bundle part 30 is sheathed on the top of vertical tube of front fork 12 and is tight against the retaining edge 162 of lining 16 with its root edge, and is as shown in Figure 3.
Packing assembly 40 has a loam cake 42, a bolt 44 in the present embodiment, and a flower tooth 46, and shown in second and three figure, loam cake 42 is located at the apical margin of bundle part 30 on top and the butt of vertical tube of front fork 12; But bolt 44 original places are arranged in loam cake 42 rotationally and stretch in the vertical tube of front fork 12; Flower tooth 46 is located in the vertical tube of front fork 12 and is bolted in bolt 44.Thus, when rotating bolt 44, come the inner tubal wall of packing vertical tube of front fork 12, also can drive bundle part 30 in the loam cake 42 downward packings simultaneously, let to have good structural stability between vertical tube of front fork 12 and the vertical tube 14 except meeting drives flower tooth 46.
Restraint the root edge that part 50 is sheathed on vertical tube of front fork 12 and is positioned at vertical tube 14 down, the apical margin of following bundle part 50 has a limit turn trough 52, like Fig. 2 and shown in Figure 3, uses rotating limit block 148 for vertical tube 14 to be embedded and limits the rotational angle of vertical tube 14.What this needed supplemental instruction be; Limit turn trough 52 not necessarily will be formed at down the apical margin of bundle part 50; Also can be arranged on the root edge of bundle part 30; 148 of the rotating limit blocks of this moment are that the apical margin from the garter spring 141 of vertical tube 14 makes progress projection and goes out, and in other words, turn trough 52 can reach due effect as long as one of them of upper and lower bundle spare 30,50 has limit.
Can know via said structure; The unitized construction 10 of the utility model is utilized the design of upper and lower bundle spare 30,50, the installation of the packing assembly 40 of arranging in pairs or groups again; Can increase the structural stability between vertical tube of front fork 12 and the vertical tube 14 really; And following bundle part 50 can be fixed on the position of vertical tube of front fork 12 according to the different size adjustment of vertical tube 14, to increase convenience in the use.
On the other hand; The handle of quick detach assembly can have different forms; As shown in Figure 5; The vertical tube of front fork 61 that is provided for the utility model second preferred embodiment and the unitized construction 60 of vertical tube 62, its keystone configuration and above-mentioned first embodiment are roughly the same, precisely because difference is that the handle 64 of quick detach assembly 63 has only the top of single ear 642 and pivot to form and articulates; So except reaching tightening the effect originally, the problem that can avoid two ears 221 of the handle 22 of above-mentioned first embodiment when operation, to block simultaneously again.
Please consult Fig. 6 and Fig. 7 again, for the utility model the 3rd than the vertical tube of front fork 71 that embodiment provided and the unitized construction 70 of vertical tube 72, its keystone configuration and second embodiment are roughly the same, precisely because difference is the structure of vertical tube of front fork 71 and packing assembly 80.In the present embodiment, vertical tube of front fork 71 is arranged with a vehicle frame pipe 90, and the top of vertical tube of front fork 71 has an internal thread part 712, and the bottom of vertical tube of front fork 71 has one first inclined-plane 713.Packing assembly 80 has a loam cake 82, a bolt 84; An and clamp holder 86; Wherein, Loam cake 82 has an external thread part 822, makes loam cake 82 to be located at the internal thread part 712 of vertical tube of front fork 71 and to be fixed in the top of vertical tube of front fork 71 by external thread part 822 spiral shells itself, to reach the effect of bundle part 73 in the packing; But bolt 84 original places are arranged in the vertical tube of front fork 71 rotationally; Clamp holder 86 spiral shells are located at the terminal of bolt 84 and are had one second inclined-plane 862, and second inclined-plane 862 of clamp holder 86 amplexiforms with first inclined-plane 713 of vertical tube of front fork 71 each other.Thus; When rotating bolt 84; Clamp holder 86 will be through cooperating and vertical tube of front fork 71 generation oblique courses relatively between first inclined-plane 713 of second inclined-plane 862 and vertical tube of front fork 71 of itself; Make clamp holder 86 be able to the inner tubal wall that a packing face 864 is packed in vehicle frame pipe 90, with fixing between the unitized construction 70 of accomplishing the utility model and the vehicle frame pipe 90.
The constituent components that the utility model is disclosed in the foregoing description is merely casehistory, is not the scope that is used for limiting the utility model, and the substituting or change of other equivalent elements also should be the claim scope that the utility model applies for and contain.

Claims (12)

1. the unitized construction of the vertical tube of front fork of a bicycle and vertical tube is characterized in that, includes:
One vertical tube of front fork;
One vertical tube has a sleeve joint hole, in order to be sheathed on this vertical tube of front fork;
One quick detach assembly is located at this vertical tube, in order to this vertical tube is fixed in this vertical tube of front fork;
Restraint part on one, be located at the top of this vertical tube of front fork;
One packing assembly has a loam cake, and the top and the packing that are covered on this vertical tube of front fork on this should be gone up the bundle part; And
Restraint part once, be located at this vertical tube of front fork and be positioned at the root edge of this vertical tube.
2. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 1, it is characterized in that, wherein be provided with a lining between this vertical tube of front fork and this vertical tube.
3. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 2, it is characterized in that wherein this lining is located at and is had a retaining edge in the sleeve joint hole of this vertical tube and in its top, this retaining edge this vertical tube with should on restraint between the part.
4. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 2, it is characterized in that wherein this lining has a profile groove, make this lining can receive the external force effect and produce radial deformation.
5. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 1; It is characterized in that; Wherein this packing assembly has a bolt and a flower tooth; But this bolt original place is arranged in this loam cake rotationally, and this flower tooth is located in this front fork body and spiral shell is located at this bolt, can receive driving and the inner tubal wall of this front fork body of packing of this bolt.
6. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 1; It is characterized in that wherein this vertical tube has an articulated section, this quick detach assembly has a pivot, leader; An and adapter shaft; This pivot is located at the articulated section of this vertical tube pivotly, and this handle pivot is located at this pivot, and the two ends of this adapter shaft connect this vertical tube and this pivot respectively.
7. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 6, it is characterized in that wherein this handle has an ear, in order to be hubbed at an end of this pivot.
8. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 6, it is characterized in that wherein this handle has two ears, in order to be hubbed at the two ends of this pivot.
9. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 6; It is characterized in that wherein this adapter shaft has an adjustment sleeve and an axostylus axostyle, this adjustment sleeve spiral shell is located at this vertical tube; One end of this axostylus axostyle is sheathed on this pivot, and the other end of this axostylus axostyle is connected in this adjustment sleeve.
10. according to the unitized construction of the vertical tube of front fork and the vertical tube of the said bicycle of claim 1; It is characterized in that; Wherein this vertical tube has a rotating limit block, and one of them of this upper and lower bundle spare has a limit turn trough, and the rotating limit block that supplies this vertical tube is embedded and limits the rotational angle of this vertical tube.
11. unitized construction according to the vertical tube of front fork and the vertical tube of the said bicycle of claim 1; It is characterized in that; Wherein this vertical tube of front fork has an internal thread part; This loam cake has an external thread part, and this loam cake is located at the internal thread part of this vertical tube of front fork by this external thread part spiral shell and is fixed in the top of this vertical tube of front fork.
12. according to the vertical tube of front fork of claim 1 or 11 said bicycles and the unitized construction of vertical tube; It is characterized in that; Wherein the bottom of this vertical tube of front fork has one first inclined-plane, and this packing assembly has a bolt and a clamp holder, but this bolt original place is arranged in this vertical tube of front fork rotationally; This clamp holder spiral shell is located at the terminal of this bolt and is had second inclined-plane that amplexiforms each other with this first inclined-plane, can receive driving and this vertical tube of front fork oblique course relatively of this bolt.
CN2012200517207U 2012-02-17 2012-02-17 Front fork riser and stand pipe combined structure for bicycle Expired - Fee Related CN202541746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200517207U CN202541746U (en) 2012-02-17 2012-02-17 Front fork riser and stand pipe combined structure for bicycle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200517207U CN202541746U (en) 2012-02-17 2012-02-17 Front fork riser and stand pipe combined structure for bicycle

Publications (1)

Publication Number Publication Date
CN202541746U true CN202541746U (en) 2012-11-21

Family

ID=47162418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200517207U Expired - Fee Related CN202541746U (en) 2012-02-17 2012-02-17 Front fork riser and stand pipe combined structure for bicycle

Country Status (1)

Country Link
CN (1) CN202541746U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229045A (en) * 2013-06-18 2014-12-24 久鼎金属实业股份有限公司 Handlebar stem of bicycle
WO2020225181A1 (en) * 2019-05-03 2020-11-12 Jochen Klieber Stem for a bicycle
CN111959663A (en) * 2019-05-20 2020-11-20 劲马有限公司 Bicycle handle and vertical tube combined structure
EP3912892A1 (en) * 2020-05-20 2021-11-24 Horst Wedemann Quick release and rotatable bicycle handlebar stem

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229045A (en) * 2013-06-18 2014-12-24 久鼎金属实业股份有限公司 Handlebar stem of bicycle
WO2020225181A1 (en) * 2019-05-03 2020-11-12 Jochen Klieber Stem for a bicycle
CN111959663A (en) * 2019-05-20 2020-11-20 劲马有限公司 Bicycle handle and vertical tube combined structure
CN111959663B (en) * 2019-05-20 2021-07-27 劲马有限公司 Bicycle handle and vertical tube combined structure
EP3912892A1 (en) * 2020-05-20 2021-11-24 Horst Wedemann Quick release and rotatable bicycle handlebar stem
US11724767B2 (en) 2020-05-20 2023-08-15 Horst Wedemann Quickly detachable and rotatable bicycle handlebar stem

Similar Documents

Publication Publication Date Title
CN202541746U (en) Front fork riser and stand pipe combined structure for bicycle
US8141893B2 (en) Folding apparatus for a bicycle frame
CN202628756U (en) Sleeve cap combination structure for gear-shifting inhaul cable
JP3196055U (en) Three-wheel stroller joint position limiter
CN203784598U (en) Support used for photographic camera equipment
JP3220735U (en) Bicycle foldable handlebar
CN104395187A (en) Rotor system for a bicycle
US9475534B2 (en) Locking threadless bicycle headset
JP3193432U (en) Folding bicycle handle storage structure
JP2013503769A (en) Folding joint device
JP5618668B2 (en) Bicycle folding structure
CN204299529U (en) Detachable gland and well head hot extractor
CN206550941U (en) Bent axle stop device
CN103921879A (en) Rotary positioning quick-folding mechanism
CN201757111U (en) Connecting structure for trampoline frame pipe
CN203652022U (en) Quick-folding mechanism capable of realizing rotating positioning
CN207931910U (en) A kind of fast disassembly type bicycle middle shaft component
CN104309749B (en) A kind of folding bed being contained on bicycle
CN203864905U (en) Balance bike and bike integrated middle shaft device
CN104401444A (en) Center shaft applicable to bicycle
CN215824208U (en) Tower sand box capable of reducing sand eating amount
CN212220475U (en) Bicycle front fork gap tightening device
TWM555823U (en) Quick disassembly structure of expansion pipe fitting
CN204610468U (en) Anti-rotational diddle-net
CN207328705U (en) Vehicle frame and electric car

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20140217