CN202530449U - Tapered pipe pile with bidirectional misaligned through holes - Google Patents
Tapered pipe pile with bidirectional misaligned through holes Download PDFInfo
- Publication number
- CN202530449U CN202530449U CN2012200453402U CN201220045340U CN202530449U CN 202530449 U CN202530449 U CN 202530449U CN 2012200453402 U CN2012200453402 U CN 2012200453402U CN 201220045340 U CN201220045340 U CN 201220045340U CN 202530449 U CN202530449 U CN 202530449U
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- misaligned
- holes
- tapered pipe
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Disclosed is a tapered pipe pile with bidirectional misaligned through holes. A plurality of groups of Y-directional misaligned through holes and X-directional misaligned through holes are arranged on the wall of the tapered pipe pile, and the Y-directional misaligned through holes and the X-directional misaligned through holes in the same group are positioned on the same plane. The tapered pipe pile with the bidirectional misaligned through holes has the advantages that the tapered pipe pile with the bidirectional misaligned through holes is arranged in a soft foundation, owing to the characteristics of the tapered pipe pile, a small-diameter end of the tapered pipe pile is positioned on the lower side to make full use of side friction of pile soil particularly in the construction period, the soil compacting effect of the tapered pipe pile can be properly reduced, and excess pore water pressure is generated in the pile sinking process.
Description
Technical field
The utility model relates to a kind of conical pipe pile, relates in particular to a kind of two-way not to the bore conical pile tube.
Background technology
When at present existing conical pipe pile was constructed, particularly the hammer piling mode produced soil compaction effect and excess pore water pressure, very easily caused adjacent stake skew, even broken pile.PTC type conical pipe pile is used for the deep soft soil foundation treatment project, and main purpose is control foundation settlement and settlement after construction, improves bearing capacity of foundation soil, and conical pipe pile self bearing capacity is not a subject matter.The main cause that foundation settlement produces is because the discharge of soil body mesopore water under the outer load effect.Concerning deep soft soil foundations such as speedway, high-speed railway, road in airport, control its sedimentation, mostly is to control its settlement amount after construction, and its settlement amount after construction is controlled in the settlement amount after construction critical field.If produce more settling amount as far as possible in construction periods such as embankment, dykes and dams, roads, should water discharge as much as possible in native mesopore be reduced the water content of soil, then its settlement amount after construction will be able to reduce, and reach the purpose of control sedimentation and settlement amount after construction.
Summary of the invention
It is a kind of two-way not to the bore conical pile tube that the purpose of the utility model is to provide; Form two-way not to the bore conical pile tube; The soil body side friction of polywater effect that makes full use of the conical pipe pile cavity and performance conical pipe pile side, every linear meter(lin.m.) be provided with 2 groups two-way not to perforation.
The utility model is realized like this; It comprises conical pipe pile, Y to not to perforation, X to not to perforation; It is characterized in that having on the conical pipe pile lining some groups of Y to not to perforation and X to not to perforation, same group of Y to not to perforation and X to not to boring a hole not at grade.
The technique effect of the utility model is: be provided with two-way not to the bore conical pile tube in the soft foundation; Particularly in the construction period, because the conical pipe pile own characteristic, the end that diameter is little is descending; Help bringing into play a side friction of the side soil body; The soil compaction effect of conical pipe pile also can suitably reduce simultaneously, because pile driving process can produce the excess pore water pressure, water in soil can get in the conical pipe pile rapidly on the other hand.In the construction intermittent phase, under the hydrostatic pressure effect, along with the dissipation that excess pore water is pressed, water in soil also can get into rapidly in the conical pipe pile hole.If run into mucky soil, mud can not flow in the conical pipe pile perforation through two-way.If water is many in the hole, then can take the mode of drawing water that it is got rid of.Along with water level in the hole reduces, water in soil can infiltrate in the conical pipe pile again, makes the water content of soil be able to further reduction, and the intensity of soil is improved, and bearing capacity of foundation soil strengthens.Two-wayly can effectively reduce adjacent stake soil compaction effect during not to the bore conical tube pile construction, cleaning ambient, two-way also do not have energy-conservation advantage to the bore conical pile tube.
Description of drawings
Fig. 1 is the sectional drawing of the utility model.
Fig. 2 is the sectional drawing of the utility model A-A.
Fig. 3 is the sectional drawing of the utility model B-B.
Fig. 4 is the sectional drawing of the utility model C-C.
Fig. 5 is the sectional drawing of the utility model D-D.
In the drawings, 1, conical pipe pile 2, Y to not to bore a hole 3, X is to perforation.
The specific embodiment
Like Fig. 1, Fig. 2, Fig. 3, Fig. 4, shown in Figure 5, the utility model realizes like this, have on conical pipe pile 1 wall some groups of Y to not to bore a hole 2 with X to not to boring a hole 3, same group of Y to not to bore a hole 2 with X to not to boring a hole 3 at grade.Two-wayly the bore conical pile tube is not only needed to adopt special conical pipe pile punching block produce on request in factory; Method is with existing conical pipe pile production technology; Site operation adopts silent piling method pile sinking; Other operations are considered its problem of stress concentration with existing conical pipe pile construction technology, must not adopt pile vibrosinking and hammer piling mode during this structure construction.
Claims (1)
- One kind two-way not to the bore conical pile tube; It comprises conical pipe pile, Y to not to perforation, X to not to perforation; It is characterized in that having on the pile lining of conical pipe pile some groups of Y to not to perforation and X to not to perforation, same group of Y to not to perforation and X to not to boring a hole not at grade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200453402U CN202530449U (en) | 2012-02-13 | 2012-02-13 | Tapered pipe pile with bidirectional misaligned through holes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200453402U CN202530449U (en) | 2012-02-13 | 2012-02-13 | Tapered pipe pile with bidirectional misaligned through holes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202530449U true CN202530449U (en) | 2012-11-14 |
Family
ID=47131643
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200453402U Expired - Fee Related CN202530449U (en) | 2012-02-13 | 2012-02-13 | Tapered pipe pile with bidirectional misaligned through holes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202530449U (en) |
-
2012
- 2012-02-13 CN CN2012200453402U patent/CN202530449U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493437B (en) | Grouting-type micro steel pipe pile and grouting reinforcement method | |
CN103603342B (en) | Major diameter assembled casing super-long filling pile construction method | |
CN101812976B (en) | Adjustable multiple coil extruding and expanding drilling tool | |
CN205135406U (en) | Can dash rig of filling thick liquid | |
CN202324017U (en) | Grouting type micro steel pipe pile | |
CN102312427A (en) | Half soil squeezing screw expansion pile forming method | |
CN204000840U (en) | Concrete floral tube slip casting uplift pile | |
CN103114576A (en) | Post grouting construction method for cast-in-place concrete pile | |
CN204827213U (en) | Double dynamical head digs rig soon | |
CN202530449U (en) | Tapered pipe pile with bidirectional misaligned through holes | |
CN201635074U (en) | Ground anchor | |
CN202482849U (en) | Asymmetric tapered pipe pile with bidirectional counter-through-holes | |
CN202482850U (en) | Bidirectional opposite perforation conical tubular pile | |
CN202090335U (en) | Two-way paired perforation hole tubular pile | |
CN202482847U (en) | Conical tubular pile with starlike perforated holes | |
CN201650154U (en) | Adjustable multi-stage helical extruding type drilling tool | |
CN204125931U (en) | Foundation pile structure | |
CN201520973U (en) | Precast pile with grouting hole | |
CN204000846U (en) | Floral tube slip casting uplift pile | |
CN202482851U (en) | Positive temperature coefficient (PTC) type pair-punched hole conical tube pile for deep soft foundation treatment | |
CN202482848U (en) | Cone-shaped tubular pile with non-through holes | |
CN202124857U (en) | Splitting pile | |
CN203569567U (en) | Hydraulic eccentric pick head | |
CN202745037U (en) | Non-through perforated tubular pile for processing deep soft foundation | |
CN201620410U (en) | PTC-type tubular pile with holes for deep soft foundation treatment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121114 Termination date: 20130213 |