CN202529401U - Cache conveying system for gantry crane - Google Patents

Cache conveying system for gantry crane Download PDF

Info

Publication number
CN202529401U
CN202529401U CN2012201901209U CN201220190120U CN202529401U CN 202529401 U CN202529401 U CN 202529401U CN 2012201901209 U CN2012201901209 U CN 2012201901209U CN 201220190120 U CN201220190120 U CN 201220190120U CN 202529401 U CN202529401 U CN 202529401U
Authority
CN
China
Prior art keywords
jib crane
high pedestal
pedestal jib
gantry crane
conveying system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201901209U
Other languages
Chinese (zh)
Inventor
刘朝斌
江国才
程国智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Port Storage & Transportation Co ltd
Original Assignee
Wuhu Port Storage & Transportation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Port Storage & Transportation Co ltd filed Critical Wuhu Port Storage & Transportation Co ltd
Priority to CN2012201901209U priority Critical patent/CN202529401U/en
Application granted granted Critical
Publication of CN202529401U publication Critical patent/CN202529401U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a cache conveying system for a gantry crane. The cache conveying system comprises the gantry crane, wherein a middle storage bin is arranged on a side of the gantry crane; the middle storage bin is provided with a discharging door; the discharging door is optimized and positioned on the lower part of the middle storage bin and is connected with a hydraulic cylinder. The cache conveying system has the advantages that limitation to the gantry crane is limited by the transport capacity of a truck can be overcome, so that the production efficiency is improved, and the production cost is saved.

Description

High pedestal jib crane buffer memory haul system
Technical field
The present invention relates to material transportation technology field, especially relate to a kind of high pedestal jib crane buffer memory haul system.
Background technology
Harbour, harbour utilization high pedestal jib crane lift materials such as powder to lorry, and afterwards, lorry is delivered to the destination with powder.General, because the transportation speed of lorry is comparatively slow for tower crane, thereby very easily causes high pedestal jib crane to have to quit work and wait for the situation of lorry.Obviously, such situation causes the equipment waste and the operating personal of high pedestal jib crane to delay work, and forms bigger waste.Therefore be necessary to improve.
Summary of the invention
To the deficiency that above-mentioned prior art exists, the purpose of this invention is to provide a kind of high pedestal jib crane buffer memory haul system, it has can avoid tower crane to receive the restriction of Freight Transport ability, thus the characteristics that improved production efficiency, practiced thrift productive costs.
To achieve these goals, the technical scheme that the present invention adopted is: high pedestal jib crane buffer memory haul system comprises that the avris of high pedestal jib crane, said high pedestal jib crane is provided with intermediate bunker, this intermediate bunker is provided with bin gate.
Said bin gate is positioned at the bottom of intermediate bunker.
Said bin gate is connected with hydraulic actuating cylinder.
The present invention compares the advantage that is had with prior art: can avoid high pedestal jib crane to receive the restriction of Freight Transport ability, thereby improve production efficiency, practiced thrift productive costs.High pedestal jib crane buffer memory haul of the present invention system is through increasing intermediate bunker in the intermediate link of high pedestal jib crane and lorry; Thereby when the Freight Transport ability is low; High pedestal jib crane can be about to powder earlier and be lifted to intermediate bunker, and lorry then connects powder in intermediate bunker.Obviously, this high pedestal jib crane buffer memory haul system has avoided leaving unused of high pedestal jib crane and delaying work of high pedestal jib crane operator.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified:
Fig. 1 is the structural representation of the mode of operation of embodiments of the invention;
Fig. 2 is the connection structure scheme drawing of bin gate of the present invention and hydraulic actuating cylinder.
Among the figure: 10, high pedestal jib crane; 20, intermediate bunker, 21, bin gate; 30, hydraulic actuating cylinder; 40, lorry.
The specific embodiment
The following stated is merely preferred embodiment of the present invention, does not therefore limit protection scope of the present invention.
Embodiment, see illustrated in figures 1 and 2: high pedestal jib crane buffer memory haul system, comprise high pedestal jib crane 10, the avris of high pedestal jib crane 10 is provided with intermediate bunker 20, and this intermediate bunker 20 is provided with bin gate 21.Like this, when the transport capacity of lorry 40 hour, high pedestal jib crane 10 can be about in powder lifting to this intermediate bunker 20 temporary earlier.40 in lorry can connect powder in middle feed bin 20.
Optimize, for the ease of the free-flowing of powder and be convenient to lorry 40 and connect powder, bin gate 21 is positioned at the bottom of intermediate bunker 20.That is, lorry 40 can directly arrive the bottom of intermediate bunker 20.Afterwards, bin gate 21 is opened, and powder flow in the lorry 40 voluntarily.
Further optimize, bin gate 21 is connected with hydraulic actuating cylinder 30.That is, after hydraulic actuating cylinder 30 work, automatically bin gate 21 is opened or closed.Certainly, hydraulic actuating cylinder 30 is connected with function unit (not shown on the figure).

Claims (3)

1. high pedestal jib crane buffer memory haul system comprises high pedestal jib crane (10), it is characterized in that: the avris of said high pedestal jib crane (10) is provided with intermediate bunker (20), and this intermediate bunker (20) is provided with bin gate (21).
2. high pedestal jib crane buffer memory haul according to claim 1 system, it is characterized in that: said bin gate (21) is positioned at the bottom of intermediate bunker (20).
3. high pedestal jib crane buffer memory haul according to claim 1 and 2 system, it is characterized in that: said bin gate (21) is connected with hydraulic actuating cylinder (30).
CN2012201901209U 2012-05-01 2012-05-01 Cache conveying system for gantry crane Expired - Fee Related CN202529401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201901209U CN202529401U (en) 2012-05-01 2012-05-01 Cache conveying system for gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201901209U CN202529401U (en) 2012-05-01 2012-05-01 Cache conveying system for gantry crane

Publications (1)

Publication Number Publication Date
CN202529401U true CN202529401U (en) 2012-11-14

Family

ID=47130599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201901209U Expired - Fee Related CN202529401U (en) 2012-05-01 2012-05-01 Cache conveying system for gantry crane

Country Status (1)

Country Link
CN (1) CN202529401U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104355140A (en) * 2014-10-30 2015-02-18 安仁县生平米业有限公司 Unhusked rice warehousing and transportation system in rice production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104355140A (en) * 2014-10-30 2015-02-18 安仁县生平米业有限公司 Unhusked rice warehousing and transportation system in rice production

Similar Documents

Publication Publication Date Title
CN204702146U (en) A kind of material transport cart
CN104192576A (en) Container horizontal transportation system and method
CN205661892U (en) Load and unload formula container by oneself
CN202529401U (en) Cache conveying system for gantry crane
CN202782818U (en) Freight car carriage facilitating unloading of goods
CN203033479U (en) A double car dumper for various kinds of railway open cars and drop bottom cars
CN202657502U (en) Automatic turning-type bulk material recoverer
CN204918795U (en) Novel automatic unloading of aluminium oxide device
CN203568518U (en) Unloading device of coal unloading car in closed yard
CN203889908U (en) Two-petal nickel mineral-coal compatible grab bucket with four-cable outer rib plates
CN202967619U (en) Double car dumper applied to tipping coke car
CN206375436U (en) A kind of lifting suspension bucket
CN101830355B (en) Mechanically loading and discharging material holding grating device for use in transportation of bulk material of small specific gravity with railway gondola
CN204490061U (en) Can across station track bulk cargo loading mechanism
CN201338553Y (en) Bottom supporting rocker dump car
CN202594601U (en) Vehicle-mounted portal crane coal shipment accessory
CN202464808U (en) Gravity-type self-discharging bucket device
CN202518146U (en) Self-loading and self-unloading trailer
CN202046846U (en) Novel fork type mechanical grab bucket
CN201864260U (en) Automatic opening and closing device for carriage back door of garbage truck
CN205076289U (en) Multipurpose combination funnel
CN204822713U (en) Multi -functional hopper
CN202516597U (en) Crushing device for waste concrete blocks
CN201423962Y (en) Self-unloading carriage
CN202912204U (en) Opening and closing upper roof for bulk grain transport truck bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20150501

EXPY Termination of patent right or utility model