CN202519997U - Numerical-control synchronous tensioning system of jack - Google Patents

Numerical-control synchronous tensioning system of jack Download PDF

Info

Publication number
CN202519997U
CN202519997U CN2012201403025U CN201220140302U CN202519997U CN 202519997 U CN202519997 U CN 202519997U CN 2012201403025 U CN2012201403025 U CN 2012201403025U CN 201220140302 U CN201220140302 U CN 201220140302U CN 202519997 U CN202519997 U CN 202519997U
Authority
CN
China
Prior art keywords
tensioning
jack
oil
numerical
stretch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201403025U
Other languages
Chinese (zh)
Inventor
刘文峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Fashion Technology Co Ltd
Original Assignee
Jiangxi Fashion Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Fashion Technology Co Ltd filed Critical Jiangxi Fashion Technology Co Ltd
Priority to CN2012201403025U priority Critical patent/CN202519997U/en
Application granted granted Critical
Publication of CN202519997U publication Critical patent/CN202519997U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Tension Adjustment In Filamentary Materials (AREA)

Abstract

The utility model discloses a numerical-control synchronous tensioning system of a jack. The numerical-control synchronous tensioning system comprises a control component and two tensioning components arranged in an opposing way, wherein the tensioning component comprises a tensioning device, an oil inlet pipe, an oil outlet pipe and an oil tank; the oil tank is provided with an oil pump; the control component comprises a controller and electromagnetic control valves; the controller is provided with an interface converter; and the electromagnetic control valves are arranged on the oil inlet pipe and the oil outlet pipe and electrically connected with the interface converter. The numerical-control synchronous tensioning system is compact in structure, low in cost, simple in operation, good in reliability and high in precision and degree of automation; one control component controls two tensioning components automatically and synchronously, and records the data value in operation in real time, therefore, not only the synchronism during the tensioning process, the load time duration during the tensioning process and the precision and accuracy of the data collected can be ensured, but also the data during the tensioning process can be recoded automatically, so that the tensioning process can be represented in future for facilitating the verification.

Description

Jack numerical control synchronous tension system
Technical field
The utility model belongs to the building implements field, specifically, relates to a kind of jack numerical control synchronous tension system.
Background technology
Prestressed stretch-draw is exactly through jack tension presstressed reinforcing steel, gives bridge or member stress application in advance, makes bridge or member produce camber upwards, to improve the supporting capacity of bridge or member.Prestressed stretch-draw is divided into two kinds of pre-tensioning system and post stretching.Pre-tensioning system is meant strains earlier presstressed reinforcing steel on pedestal, through ground tackle that presstressed reinforcing steel is solid on pedestal, then concreting.When treating that concrete reaches prescribed strength, lay down ground tackle, loosen presstressed reinforcing steel, the strength of that part of presstressed reinforcing steel that combines with concrete just is delivered on the concrete.Post stretching is meant first concreting post tensioning, leaves the duct before the concreting in advance, treats that concrete reaches intensity, in the duct, imports presstressed reinforcing steel into, and stretch-draw anchor is preferably in and injects cement paste in the duct then.
In traditional form of construction work, prestressed stretch-draw is taked the mode of two ends symmetry simultaneous tension, adopts two control methods of control stretching force and elongation.In order to make Tension Control more accurate, generally adopt the two control methods of ess-strain, be main with Stress Control, strain is controlled to be auxilliary, requires simultaneously to carry out with the method that loads step by step, promptly exists requirement synchronous and pause.Wherein, all be through the manual type collection to the reading of oil meter, elongation, synchronism then realizes by whistling, do gesture or propagandaing directed to communicate through Walkie talkie.After stretch-draw finished, data record also was to lean on manual record.
Deficiency below above-mentioned traditional stretching mode exists:
At first be in operation; Because be that the two ends that two staff stand in stretch-draw are controlled two tensioning equipments respectively; Only through simply whistling or propagandaing directed to communicate; Start when be difficult to guaranteeing, just be difficult to guarantee synchronism, and synchronism plays crucial effects to the quality of stretch-draw quality equipment.In stretching process, need to adopt the mode that loads step by step, promptly in stretching process, requiring has pause and holds the lotus time, has taken operating personnel's great amount of time.And in a large amount of engineering practices is investigated, can learn; For the ignorance of perhaps starting from the stretch-draw quality in a hurry; A lot of staff almost are that as long as gathered after the data of this point, promptly starting drive begins the stretch-draw of next stroke at once to after certain point that pauses; Whole process is also imperfect, thereby has influence on the stretch-draw quality.In addition, also very inaccurate to the control of stretching force value.
Next is in the collection of data, and the mode of artificial stretch-draw is to read the oil pressure tabular value through naked eyes, because the vibrations of machine; The swing that the meeting of oil meter pointer is violent; Add the precision problem of oil meter, and the horizontal problem of workman's reading, all will have influence on the precision and the degree of accuracy of reading.On the elongation of measuring presstressed reinforcing steel, also be to adopt manual type at present, go to gather with steel ruler, can there be bigger error equally.
At last, whole stretching process cannot reproduce, and stretch-draw finishes, and after the sealing off and covering anchorage (wrapping the stretch-draw end with concrete), even the stretch-draw personnel have distorted the data that collect in the stretching process, also is difficult to verification.
In sum, above various reasons directly causes anchor lower prestress not meet designing requirement and instructions for use, has a strong impact on the application life of construction works such as bridge, increases the maintenance and the operation costs in construction work later stage.
Summary of the invention
The technical problem that the utility model will solve is to overcome above-mentioned defective, a kind of simple and compact for structure, with low cost, easy and simple to handle, good reliability is provided, precision is high, automaticity is high intelligent jack numerical control synchronous tension system.
For addressing the above problem, the technical scheme that the utility model adopted is:
Jack numerical control synchronous tension system comprises Control Component and two stretch-draw assemblies that are positioned opposite that link to each other with Control Component;
Said stretch-draw assembly comprises tensioning equipment, the oil inlet pipe that is communicated with tensioning equipment and flowline and the fuel tank that is communicated with oil inlet pipe and flowline, and fuel tank is provided with oil pump;
Said Control Component comprises controller, and controller is provided with interface convertor; Be arranged on the solenoid electric valve on oil inlet pipe and the flowline; Said solenoid electric valve is electrically connected with interface convertor.
Say further:
Said tensioning equipment is provided with oil pressure sensor; Said fuel tank is provided with oil pressure sensor; Said oil pressure sensor is electrically connected with interface convertor.
Said tensioning equipment is provided with displacement transducer, and displacement transducer is electrically connected with interface convertor.
Further say:
Said tensioning equipment is a jack.
Owing to adopted technique scheme; Compared with prior art; The utility model compact conformation, with low cost, easy and simple to handle, good reliability, precision is high, automaticity is high, and a Control Component is controlled two stretch-draw assemblies simultaneously automatically, and the data value during operation under the real time record; Not only can guarantee the synchronism of stretching process, accuracy of holding lotus time span and image data and the correctness in the stretching process; Can also automatically write down the data in the stretching process, can reproduce stretching process later on, convenient verification.
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is described further simultaneously.
Description of drawings
Fig. 1 is that block diagram is installed by the system of a kind of embodiment of the utility model.
Among the figure: the 1-tensioning equipment; The 2-oil pressure sensor; The 3-displacement transducer; The 4-ground tackle; The 5-oil inlet pipe; The 6-flowline; The 7-solenoid electric valve; The 8-interface convertor; The 9-controller; The 10-fuel tank; The 11-oil pump.
The specific embodiment
Embodiment:
As shown in Figure 1, jack numerical control synchronous tension system comprises Control Component and two stretch-draw assemblies that are positioned opposite that link to each other with Control Component.
In the present embodiment, said stretch-draw assembly comprises tensioning equipment 1, the oil inlet pipe 5 that is communicated with tensioning equipment 1 and flowline 6 and the fuel tank 10 that is communicated with oil inlet pipe 5 and flowline 6, and fuel tank 10 is provided with oil pump 11.Generally speaking, all be to adopt jack as tensioning equipment, what controller adopted is computer.
Said Control Component comprises controller 9, and controller 9 is provided with interface convertor 8.Oil inlet pipe 5 is provided with solenoid electric valve 7 with flowline 6.Said solenoid electric valve 7 is electrically connected with interface convertor 8.
In the present embodiment, said tensioning equipment 1 is provided with oil pressure sensor 2, also is provided with oil pressure sensor 2 on the fuel tank 10.Said oil pressure sensor 2 is electrically connected with interface convertor 8.Said tensioning equipment 1 is provided with displacement transducer 3, and displacement transducer 3 is electrically connected with interface convertor 8.
Before the work, at first checkout facility connects situation, engaging means power supply then.Open the control software in the computer, correctly configure relevant parameter,, click and confirm that system will start working like steel strand root bundle, model etc.
Jack is provided with when being used for detecting the stretch-draw operation flexible end movement and sends displacement signal the displacement transducer of computer to, and is used for detecting oil pressure in the jack and oil pressure value is sent to the pressure sensor of Control Component.Fuel tank is equiped with the oil pressure sensor that is used to detect the fuel tank oil pressure and oil pressure value is sent to computer.In the system work process, computer can be according to the signal that transmits in each sensor, under the real time record during stretch-draw operation; The variation of stretch-draw displacement and the variation of oil pressure in real time, and, adjust parameters such as fuel tank place solenoid electric valve is regulated the stress of stretch-draw, the point that pauses in real time according to above-mentioned variation; Reach best stretch-draw effect; And whole data recording process is true, reliable, can preserve as the process data of the best, convenient verification from now on.
The utility model compact conformation, with low cost, easy and simple to handle, good reliability, precision is high, automaticity is high; A Control Component is controlled two stretch-draw assemblies simultaneously automatically; And the data value during operation under the real time record, not only can guarantee the synchronism of stretching process, accuracy of holding lotus time span and image data and the correctness in the stretching process, can also automatically write down the data in the stretching process; Can reproduce stretching process later on, convenient verification.
The above only is the preferred implementation of the utility model, and the protection domain of the utility model also not only is confined to the foregoing description, and all technical schemes that belongs under the utility model thinking all belong to the protection domain of the utility model.Should be pointed out that for those skilled in the art in the some improvement and the retouching that do not break away under the utility model principle prerequisite, these improvement and retouching also should be regarded as the protection domain of the utility model.

Claims (4)

1. jack numerical control synchronous tension system comprises Control Component and two stretch-draw assemblies that are positioned opposite that link to each other with Control Component;
Said stretch-draw assembly comprises tensioning equipment (1), the oil inlet pipe (5) that is communicated with tensioning equipment (1) and flowline (6) and the fuel tank (10) that is communicated with oil inlet pipe (5) and flowline (6), and fuel tank (10) is provided with oil pump (11);
Said Control Component comprises controller (9), and controller (9) is provided with interface convertor (8); Be arranged on the solenoid electric valve (7) on oil inlet pipe (5) and the flowline (6); Said solenoid electric valve (7) is electrically connected with interface convertor (8).
2. jack numerical control synchronous tension according to claim 1 system, it is characterized in that: said tensioning equipment (1) is provided with oil pressure sensor (2); Said fuel tank (10) is provided with oil pressure sensor (2); Said oil pressure sensor (2) is electrically connected with interface convertor (8).
3. jack numerical control synchronous tension according to claim 1 and 2 system, it is characterized in that: said tensioning equipment (1) is provided with displacement transducer (3), and displacement transducer (3) is electrically connected with interface convertor (8).
4. jack numerical control synchronous tension according to claim 3 system, it is characterized in that: said tensioning equipment (1) is a jack.
CN2012201403025U 2012-04-06 2012-04-06 Numerical-control synchronous tensioning system of jack Expired - Lifetime CN202519997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201403025U CN202519997U (en) 2012-04-06 2012-04-06 Numerical-control synchronous tensioning system of jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201403025U CN202519997U (en) 2012-04-06 2012-04-06 Numerical-control synchronous tensioning system of jack

Publications (1)

Publication Number Publication Date
CN202519997U true CN202519997U (en) 2012-11-07

Family

ID=47102952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201403025U Expired - Lifetime CN202519997U (en) 2012-04-06 2012-04-06 Numerical-control synchronous tensioning system of jack

Country Status (1)

Country Link
CN (1) CN202519997U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088757A (en) * 2013-02-06 2013-05-08 山西斯普瑞机械制造股份有限公司 Box girder prestressed tension automatic control method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088757A (en) * 2013-02-06 2013-05-08 山西斯普瑞机械制造股份有限公司 Box girder prestressed tension automatic control method and system
CN103088757B (en) * 2013-02-06 2015-10-28 山西斯普瑞机械制造股份有限公司 Box girder pre-stressed tension automatic control method and system

Similar Documents

Publication Publication Date Title
CN102031874B (en) Intelligent type synchronous prestress tensioning system
CN103526948B (en) The control method of intelligent tensioning system and intelligent tensioning system
CN104499485B (en) One pile for one column fully automatic hydraulic verticality-regulating system and vertical adjustment method
CN103629173B (en) Prestressed stretch-draw hydraulic system, prestress tensioning equipment and controlling method thereof
CN201865358U (en) Intelligent synchronous prestress tensioning system
CN202562677U (en) Prestress under anchorage intelligent synchronous stretching and drawing detection device
CN204920237U (en) Push -pull system is opened to prestressing force intelligence
CN102431090B (en) Fiber grating precast beam prestress intelligent tensioning control system and implementation method thereof
CN103364276B (en) A kind of anchor lower prestress intelligent synchronization tension test device
CN102922601A (en) Bridge prestress tensioning control and feedback method
CN113408927A (en) Big data-based prestressed construction quality evaluation method and system
CN108505458A (en) A kind of suspension bridge removes the monitoring method of overall process
CN202826047U (en) Prestress tensioning system
CN104762884B (en) The control method of Multipoint synchronous intelligent tensioning system
CN205134189U (en) Test oneself ground tackle of stress
CN203584930U (en) Prestress tension hydraulic system and prestress tension equipment
CN202519997U (en) Numerical-control synchronous tensioning system of jack
CN102722617A (en) Petroleum and petrochemical plant station stereoscopic perfect information visual production operation system and control method thereof
CN206095494U (en) Control of tension power testing system under prestressed concrete bridge roof beam anchor
CN203096616U (en) Intelligent synchronous tensioning system
CN203684688U (en) Post-tensioned prestressed girder grouting system capable of being monitored in entire process
CN204044036U (en) Metallic bellows anti-leakage performance test apparatus
CN102888996B (en) Based on the pre-stress construction system of Internet of Things
CN108894113A (en) A kind of pylon adjusts cable system and method automatically
CN113281581B (en) Test method of LF furnace electrode test system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121107