CN202519906U - Improved stair handrail - Google Patents
Improved stair handrail Download PDFInfo
- Publication number
- CN202519906U CN202519906U CN2012201220842U CN201220122084U CN202519906U CN 202519906 U CN202519906 U CN 202519906U CN 2012201220842 U CN2012201220842 U CN 2012201220842U CN 201220122084 U CN201220122084 U CN 201220122084U CN 202519906 U CN202519906 U CN 202519906U
- Authority
- CN
- China
- Prior art keywords
- iron plate
- cement
- railing
- pipe
- stair handrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model relates to the technical field of building decoration and particularly relates to an improved stair handrail. The improved stair handrail comprises a rail, a cement step and a pre-embedded iron plate, and is characterized in that the pre-embedded iron plate is connected between the rail and the cement step; an abnormal steel pipe is welded outside the pre-embedded iron plate and an abnormal pipe is sleeved outside the abnormal steel pipe; and a cement mortar layer is arranged between the abnormal pipe and the cement step. Compared with the prior art, the pre-embedded iron plate is utilized in the improved stair handrail so that the connection between the rail and the cement step is firmer and stable, so that the accidents are prevented from happening.
Description
Technical field
The utility model relates to the building decoration technical field, specifically a kind of improved balustrade railing.
Background technology
Tradition installation for the balustrade railing in the building decoration industry is that the surface connects, and directly utilizes seccotine that railing and cement ladder are bonded together, along with the prolongation of service time; Seccotine then can lose viscosity, adds to receive external force when railing often is used and apply, in the course of time; Railing can rock and come off; In case during the railing loss of stability, then can meet accident, life safety is impacted.
Summary of the invention
The utility model is the deficiency that overcomes prior art, utilizes pre-buried iron plate, makes to be connected more firmly, and stable between railing and the cement ladder, reduces unexpectedly and takes place.
For realizing above-mentioned purpose, design a kind of improved balustrade railing, comprise railing, cement ladder, pre-buried iron plate, it is characterized in that: be connected pre-buried iron plate between railing and the cement ladder; Described pre-buried iron plate external welding chapped pipe, chapped pipe is arranged with special pipe outward, is provided with cement sand bed between special pipe and the cement ladder.
The utility model is compared with prior art, utilizes pre-buried iron plate, makes to be connected more firmly, and stable between railing and the cement ladder, reduces unexpectedly and takes place.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the enlarged diagram of A among Fig. 1.
Referring to Fig. 1, Fig. 2,1 is railing, and 2 is the cement ladder, and 3 is pre-buried iron plate, and 4 is chapped pipe, and 5 is special pipe, and 6 is cement sand bed.
The specific embodiment
According to accompanying drawing the utility model is done further explanation below.
Like Fig. 1, shown in Figure 2, be connected pre-buried iron plate 3 between railing 1 and the cement ladder 2; Described pre-buried iron plate 3 external welding chapped pipes 4 are arranged with special pipe 5 outside the chapped pipe 4, are provided with cement sand bed 6 between special pipe 5 and the cement ladder 2.
Between railing 1 and cement ladder 2, set up pre-buried iron plate 3; Utilize pre-buried iron plate 3 to connect, because pre-buried iron plate 3 meeting bending under long-term the use, therefore at pre-buried iron plate 3 external welding chapped pipes 4; And outside chapped pipe 4 sheathed special pipe 5; Utilize cement sand bed 6 to fill, better being connected between firm whole railing 1 and the cement ladder 2, reduce generation unexpectedly.
Claims (1)
1. an improved balustrade railing comprises railing, cement ladder, pre-buried iron plate, it is characterized in that: be connected pre-buried iron plate (3) between railing (1) and the cement ladder (2); Described pre-buried iron plate (3) external welding chapped pipe (4), chapped pipe (4) is outer to be arranged with special pipe (5), is provided with cement sand bed (6) between special pipe (5) and the cement ladder (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201220842U CN202519906U (en) | 2012-03-27 | 2012-03-27 | Improved stair handrail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201220842U CN202519906U (en) | 2012-03-27 | 2012-03-27 | Improved stair handrail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202519906U true CN202519906U (en) | 2012-11-07 |
Family
ID=47102861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201220842U Expired - Fee Related CN202519906U (en) | 2012-03-27 | 2012-03-27 | Improved stair handrail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202519906U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103899058A (en) * | 2012-12-28 | 2014-07-02 | 德胜(苏州)洋楼有限公司 | Fixing device for upright rod of stair railing |
-
2012
- 2012-03-27 CN CN2012201220842U patent/CN202519906U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103899058A (en) * | 2012-12-28 | 2014-07-02 | 德胜(苏州)洋楼有限公司 | Fixing device for upright rod of stair railing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243926B (en) | Construction method for hoisting engineering tube well stand pipe of high-rise building | |
CN102900022B (en) | Cable stayed bridge leaning tower hydraulic climbing mould construction method | |
CN105178167B (en) | A kind of double-deck steel cable bridge and its erection method | |
CN203820287U (en) | Composite steel carrying pole for hoisting roof tiles of steel structure workshops | |
CN106351335A (en) | Aerial vertical aligning connecting device for steel structures | |
CN202787926U (en) | Overhanging scaffold simple and convenient to disassemble and assemble | |
CN202519906U (en) | Improved stair handrail | |
CN204282682U (en) | Anti-seismic precast stair composition structure | |
CN204804366U (en) | Construction safety rail guard and stair railing | |
CN203961014U (en) | A kind of precast concrete building structure | |
CN204608833U (en) | Municipal administration manhole | |
CN104594575B (en) | A kind of stair | |
CN204199566U (en) | The pre-buried structure of balustrade | |
CN103883038B (en) | Steaming and pressing light aerated concrete outer wallboard and steel beam connecting construction member and construction method | |
CN202176037U (en) | Glass rib connecting clamp plate member for full-glass curtain wall | |
CN202430977U (en) | Profile steel outside set-up scaffold structure for junction of exterior wall and stair hall | |
CN203603393U (en) | Beam-free stairway | |
CN105040592A (en) | Flat suspension bridge and erecting method thereof | |
CN104727469A (en) | Staircase prefabricated reinforced concrete fireproof bulkhead structure and construction method thereof | |
CN203499139U (en) | Beam type anti-seismic stair | |
CN203257073U (en) | Elevator shaft operating platform | |
CN213539525U (en) | Assembled stair | |
CN103334592B (en) | Step-type sliding installation construction method for convex structure of high-rise building | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN205577101U (en) | Shaped steel gypsum combined strength structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121107 Termination date: 20160327 |
|
CF01 | Termination of patent right due to non-payment of annual fee |