CN202511613U CN2012201156719U CN201220115671U CN202511613U CN 202511613 U CN202511613 U CN 202511613U CN 2012201156719 U CN2012201156719 U CN 2012201156719U CN 201220115671 U CN201220115671 U CN 201220115671U CN 202511613 U CN202511613 U CN 202511613U
Authority
CN
China
Prior art keywords
guide rod
furnace
cantilever
heater
screw mandrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201156719U
Other languages
Chinese (zh)
Inventor
张骏
赵建军
魏常群
卢俊森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
14TH METALLURGICAL CONSTRUCTION Corp OF CHINA NONFERROUS METAL INDUSTRY
Original Assignee
14TH METALLURGICAL CONSTRUCTION Corp OF CHINA NONFERROUS METAL INDUSTRY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 14TH METALLURGICAL CONSTRUCTION Corp OF CHINA NONFERROUS METAL INDUSTRY filed Critical 14TH METALLURGICAL CONSTRUCTION Corp OF CHINA NONFERROUS METAL INDUSTRY
Priority to CN2012201156719U priority Critical patent/CN202511613U/en
Application granted granted Critical
Publication of CN202511613U publication Critical patent/CN202511613U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Furnace Details (AREA)

Abstract

The utility model relates to a single-stage arc melting furnace which comprises a bearing (1), a screw rod (2), guide sheaves (3), a movable nut (4), couplings (5), a speed reducer (6), a motor (7), a mounting table (8), a guide rod base (9), a tilting furnace shaft (10), cathode bars (11), a furnace body (12), an anode electrode bar (13), an electrode clamping cantilever (14), rib boards (15), a guide rod (16), a wedge (17), a furnace cover (18), a conical bearing (19), a cantilever notch (20), a furnace mouth (21) and a mounting board (22). According to the single-stage arc melting furnace, by inserting the anode electrode bar into mineral aggregates to be matched with a cathode at the bottom of the furnace body, the contact area of the mineral aggregates is large, the thermal efficiency is high, and the internal temperature is basically even; accordingly, the smelting quality is stable, the melting time is short, the efficiency is high, and power consumption is little; under the action of a sheave guide device, the blocking phenomenon in the lifting process is avoided, the friction and the impact load are reduced, and the service life of the furnace is prolonged.

Description

A kind of single-stage arc-melting furnace
Technical field
The utility model relates to a kind of single-stage arc-melting furnace, belong to coloured and the mineral of rare metals the smelting equipment technical field.
Background technology
Existing smelting technique particularly for coloured and rare metal, has the smelting furnace of a lot of types, can both satisfy technological requirement basically.But the ubiquity device structure is complicated, and floor space is big, and the mineral aggregate fusing time is long, shortcomings such as institute's smelting metal liquid quality instability.
Disclosed vacuum is from casting arc melted stove among the CN201593917U; Comprise the vacuum melting chamber that is arranged on the frame; Front side, vacuum melting chamber is provided with gallery ports, and three layers of water cooled electrode are installed above the vacuum melting chamber, is arranged on the upper top centre of vacuum melting chamber via the universal adjustment ball valve body sealing device on the vacuum melting chamber; Vacuum melting chamber rear side is provided with the fine pumping pipeline; It is connected to turbine pump, and smelting process is polluted for a short time under the vacuum environment, can effectively improve the purity and the quality of smelting.This smelting furnace requires on the smelting furnace basis, to add installs vaccum-pumping equipment, and cost increases, and causes equipment overall structure complicated, and inconvenient operation, smelts efficient and reduces relatively, is not easy to safeguard; Metal bath and solvent have corrosiveness to heating element heater, need often to change heating element heater.
Disclose a kind of inducing smelting furnace with composite shell among the CN2549415Y, it has outer steel shell and the aluminium inner casing that is fixed in one, and inner shell bottom has magnetic shield panel, is radially arranging support bar in the cavity that induction coil in the housing and inner casing form.This structure can shield the leakage field around the induction coil, reduces the body of heater temperature rise.But its structure relative complex, mechanical strength is low, is prone to produce relative displacement between magnetic conductor and induction coil, and the quality requirement of forming original paper higher for each, and body of heater maintenance difficulty is big.
Summary of the invention
In order to solve the technical problem that exists in the above-mentioned prior art, the purpose of the utility model provides a kind of single-stage arc-melting furnace, and it is that the anode electrode rod is inserted in the mineral aggregate; Cooperate with the bottom of furnace body negative electrode, make that the mineral aggregate contact area is big, the thermal efficiency is high; The basic uniformity of internal temperature, so smelting quality is stable, thus fusing time is short; Efficient is high, and power consumption is little; Under the effect of pulley guider, avoided the stuck phenomenon in the lifting process, reduced friction and shock loading, prolonged service life of equipment.
The utility model realizes that by following technical scheme it comprises bearing 1, screw mandrel 2, leading block 3, traveling nut 4, shaft coupling 5; Reductor 6, motor 7, erecting bed 8, guide rod base 9, turndown axle 10, cathode bar 11; Body of heater 12, anode electrode rod 13, electrode clamping cantilever 14, gusset 15, guide rod 16, voussoir 17; Bell 18, conical bearing 19, cantilever breach 20, converter nose 21, installing plate 22.
Motor 7 laterally connects with reductor 6 through shaft coupling 5, and through being bolted on the erecting bed 8, erecting bed 8 is perpendicular to guide rod 16; Be welded on guide rod 16 lower ends, with guide rod 16 rotations, guide rod 16 lower ends are installed in the guide rod base 9; Guide rod 16 upper ends are fixed with screw mandrel 2 parallel being connected, screw mandrel 2 upper ends and bearing 1 interference fit, and screw mandrel 2 lower ends and conical bearing 19 interference fit are installed on the installing plate 22; Installing plate 22 and guide rod 16 vertical welding, traveling nut 4 and leading block 3 are connected through bolt, and traveling nut 4 screwing installation are on screw mandrel 2; The two pairs of leading blocks 3 step up through steel plate, and contact is installed in guide rod 16 both sides, after electrode clamping cantilever 14 is strengthened with gusset 15 welding; Connect with leading block 3 through bolt, anode electrode rod 13 steps up to be fixed on electrode clamping cantilever 14 ends through voussoir 17, and smelting furnace body of heater 12 rotates through turndown axle 10; Body of heater 12 bottoms are buried and are cast with cathode bar 11, and body of heater 18 upper edges are cast with converter nose 21; Top bell 18 is installed through wire rope suspensioning, has cantilever breach 20 on bell 18 tops.
During smelting, the lifting bell adds mineral aggregate in body of heater; Put down bell and cover body of heater, at this moment, electrode clamping cantilever 14 just sticks into the cantilever breach; Energising is smelted, and under the effect of anode electrode rod and smelting furnace cathode bar, Metal Melting is liquid; In the fusion process, the dusty gas of generation is discharged from the elongated portion sealing on bell top.Melting finishes, and cuts off electrode supply, the lifting bell; Just changeing motor, driving decelerator through shaft coupling and rotate, reductor rotates through the shaft coupling drive screw mandrel deceleration of upper end; Under the effect of screw mandrel, traveling nut drives electrode clamping cantilever and at the uniform velocity rises under the effect of leading block, the anode electrode rod is extracted out from molten metal; Directly over the anode electrode rod was lifted to body of heater, when not contacting with the body of heater upper edge, the motor outage stopped operating; Electrode clamping cantilever stops to rise under the self-locking action of screw mandrel, and keeps current height; At this moment, artificial rotating electrode clamping cantilever, directly over body of heater, at this moment, through turndown axle upset body of heater, molten metal flows out along dumping mouth, casts on demand then or other technology, accomplishes smelting process.
Compared with prior art, this utility model has following advantage:
1) under the effect of pulley guider, avoided the stuck phenomenon in the lifting process, reduced friction and shock loading, prolonged service life of equipment;
2) the anode electrode rod buries and inserts in the mineral aggregate, cooperates with the bottom of furnace body negative electrode, makes that the mineral aggregate contact area is big, and the thermal efficiency is high, thereby fusing time is short, and efficient is high, and power consumption is little;
3) the body of heater volume is little, the basic uniformity of internal temperature, so smelting quality is stable, yield rate is high.
Description of drawings
Fig. 1 forms structural front view for the utility model.1 is bearing among the figure, and 2 is screw mandrel, and 3 is leading block, and 4 is traveling nut, and 5 is shaft coupling; 6 is reductor, and 7 is motor, and 8 is erecting bed, and 9 is the guide rod base, 10 turndown axles; 11 is the smelting furnace cathode filament, and 12 is body of heater, and 13 is the anode electrode rod, and 14 is electrode clamping cantilever; 15 gussets, 16 is guide rod, and 17 is voussoir, and 18 is bell;
Fig. 2 is the vertical view of Fig. 1.20 is the cantilever breach among the figure, and 21 is converter nose;
Fig. 3 is a B structure enlarged drawing partly among Fig. 1.19 is conical bearing among the figure, and 22 is installing plate.
The specific embodiment
Embodiment: a kind of single-stage arc-melting furnace as shown in Figure 1, it comprises bearing 1, screw mandrel 2, leading block 3, traveling nut 4, shaft coupling 5; Reductor 6, motor 7, erecting bed 8, guide rod base 9, turndown axle 10, cathode bar 11; Body of heater 12, anode electrode rod 13, electrode clamping cantilever 14, gusset 15, guide rod 16, voussoir 17; Bell 18, conical bearing 19, cantilever breach 20, converter nose 21, installing plate 22.
Motor 7 laterally connects with reductor 6 through shaft coupling 5, and through being bolted on the erecting bed 8, erecting bed 8 is perpendicular to guide rod 16; Be welded on guide rod 16 lower ends, with guide rod 16 rotations, guide rod 16 lower ends are installed in the guide rod base 9; Guide rod 16 upper ends are fixed with screw mandrel 2 parallel being connected, screw mandrel 2 upper ends and bearing 1 interference fit, and screw mandrel 2 lower ends and conical bearing 19 interference fit are installed on the installing plate 22; Installing plate 22 and guide rod 16 vertical welding, traveling nut 4 and leading block 3 are connected through bolt, and traveling nut 4 screwing installation are on screw mandrel 2; The two pairs of leading blocks 3 step up through steel plate, and contact is installed in guide rod 16 both sides, after electrode clamping cantilever 14 is strengthened with gusset 15 welding; Connect with leading block 3 through bolt, anode electrode rod 13 steps up to be fixed on electrode clamping cantilever 14 ends through voussoir 17, and smelting furnace body of heater 12 rotates through turndown axle 10; Body of heater 12 bottoms are buried and are cast with cathode bar 11, and body of heater 18 upper edges are cast with converter nose 21; Top bell 18 is installed through wire rope suspensioning, has cantilever breach 20 on bell 18 tops.

Claims (1)

1. single-stage arc-melting furnace, it is characterized in that: it comprises bearing (1), screw mandrel (2), leading block (3), traveling nut (4); Shaft coupling (5), reductor (6), motor (7), erecting bed (8); Guide rod base (9), turndown axle (10), cathode bar (11), body of heater (12); Anode electrode rod (13), electrode clamping cantilever (14), gusset (15), guide rod (16); Voussoir (17), bell (18), conical bearing (19), cantilever breach (20); Converter nose (21), installing plate (22), motor (7) laterally connects with reductor (6) through shaft coupling (5), through being bolted on the erecting bed (8); Erecting bed (8) is welded on guide rod (16) lower end perpendicular to guide rod (16), and with guide rod (16) rotation, guide rod (16) lower end is installed in the guide rod base (9); Guide rod (16) upper end and parallel being connected of screw mandrel (2), screw mandrel (2) upper end is fixed with bearing (1) interference fit, and screw mandrel (2) lower end and conical bearing (19) interference fit are installed on the installing plate (22), installing plate (22) and the vertical welding of guide rod (16); Traveling nut (4) is connected through bolt with leading block (3), and traveling nut (4) screwing installation is on screw mandrel (2), and two pairs of leading blocks (3) step up through steel plate, and contact is installed in guide rod (16) both sides; Electrode clamping cantilever (14) connects with leading block (3) through bolt after strengthening with gusset (15) welding, and anode electrode rod (13) steps up to be fixed on electrode clamping cantilever (14) end through voussoir (17), and smelting furnace body of heater (12) rotates through turndown axle (10); Body of heater (12) bottom is buried and is cast with cathode bar (11), and body of heater (18) upper edge is cast with converter nose (21), and top bell (18) is installed through wire rope suspensioning, has cantilever breach (20) on bell (18) top.
CN2012201156719U 2012-03-26 2012-03-26 Single-stage arc melting furnace Expired - Lifetime CN202511613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201156719U CN202511613U (en) 2012-03-26 2012-03-26 Single-stage arc melting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201156719U CN202511613U (en) 2012-03-26 2012-03-26 Single-stage arc melting furnace

Publications (1)

Publication Number Publication Date
CN202511613U true CN202511613U (en) 2012-10-31

Family

ID=47064094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201156719U Expired - Lifetime CN202511613U (en) 2012-03-26 2012-03-26 Single-stage arc melting furnace

Country Status (1)

Country Link
CN (1) CN202511613U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260647A (en) * 2019-05-28 2019-09-20 江苏天楹环保能源成套设备有限公司 A kind of vertical rotating direct current electric arc furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260647A (en) * 2019-05-28 2019-09-20 江苏天楹环保能源成套设备有限公司 A kind of vertical rotating direct current electric arc furnace

Similar Documents

Publication Publication Date Title
CN102228895B (en) Movable type multistation suction hood
CN204478795U (en) Airtight negative pressure electric smelting furnace
CN2859418Y (en) A direct current arc inductive stove
CN104713349B (en) Airtight negative pressure electric smelting furnace
CN202511613U (en) Single-stage arc melting furnace
CN202591588U (en) Symmetric high-position concentrated lead supply casting system
CN218179608U (en) High-power energy-saving environment-friendly zirconia smelting furnace
CN104313342B (en) A kind of metal electric slag refusion and smelting equipment
CN104357673B (en) Metal electric slag refusion and smelting method
CN100451514C (en) DC arc induction furnace
CN204421635U (en) A kind of Novel Titanium slag hearth
CN107120965B (en) A kind of high efficiency levels continuous casting induction furnace
CN202174098U (en) Movable multi-station suction hood
CN102826490A (en) Jacking ladle car and applications thereof in vacuum circulating degasification refining method
CN207987275U (en) A kind of blast furnace replaces rock drill and lifts trolley
CN203203392U (en) Novel energy-saving sintering intermediate-frequency furnace
CN105689695A (en) Steel ladle covering and uncovering device provided with oblique plane rails
CN202083215U (en) Crucible base for large lead smelting coreless induction furnace
CN205980742U (en) Steelmaking electric arc furnace
CN216159620U (en) Smelting furnace raw material crushing device
CN211626104U (en) Electric arc furnace cover body lifting device matched with composite converting technology
CN114893986A (en) High-power energy-saving environment-friendly zirconia smelting furnace
CN204944169U (en) Casting smelting intermediate frequency furnace increase part
CN204830843U (en) Non ferrous metal melting furnace
CN209443058U (en) Car type furnace heat-proof device bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: THE 14TH METALLURGICAL CONSTRUCTION GROUP YUNNAN INSTALLATION ENGINEERING CO., LTD.

Assignor: The 14th Metallurgical Construction Corporation of China Nonferrous Metal Industry

Contract record no.: 2013530000082

Denomination of utility model: Electrode clamping device of single-stage electric-arc smelting furnace

Granted publication date: 20121031

License type: Exclusive License

Record date: 20130722

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CX01 Expiry of patent term

Granted publication date: 20121031

CX01 Expiry of patent term