CN202500152U - Supporting structure of underground factory floor - Google Patents

Supporting structure of underground factory floor Download PDF

Info

Publication number
CN202500152U
CN202500152U CN 201220135070 CN201220135070U CN202500152U CN 202500152 U CN202500152 U CN 202500152U CN 201220135070 CN201220135070 CN 201220135070 CN 201220135070 U CN201220135070 U CN 201220135070U CN 202500152 U CN202500152 U CN 202500152U
Authority
CN
China
Prior art keywords
anchor pole
floor
supporting construction
shearing resistance
power house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220135070
Other languages
Chinese (zh)
Inventor
宋静
郑治
宁华晚
吴正新
陈本龙
刘恩举
周小乾
曾树元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN 201220135070 priority Critical patent/CN202500152U/en
Application granted granted Critical
Publication of CN202500152U publication Critical patent/CN202500152U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a supporting structure of an underground factory floor. The supporting structure comprises an anchor rod beam (2) fixed on an underground factory palisades (1) through an anchor rod, the anchor rod beam (2) is connected with a secondary beam (3), and a floor (4) is arranged on the anchor rod beam (2) and the secondary beam (3). According to the supporting structure of the underground factory floor, the floor and the secondary beam are supported on the anchor rod beam of the factory palisades directly, columns for supporting beams and the floor in the underground factory are omitted, an excavation span of a small factory is effectively reduced, stability of surrounding rocks is improved, cave excavation supporting work amount can be reduced, and project investment is saved.

Description

The supporting construction of underground power house floor
Technical field
the utility model relates to a kind of supporting construction of underground power house floor, belongs to the construction engineering technical field of underground power house.
Background technology
In hydroelectric project, underground power house cavity group cavern quantity is many, scale is big, and spatial placement is staggered complicated, and surrounding rock of chamber stability is outstanding, and the size of factory building excavation span still is responsive to surrounding rock stability.Traditional underground power house floor is bearing on concrete column or the brick rod structure, and the setting of pillar has occupied certain space, arranges needs for satisfying electromechanical equipment, must strengthen the excavation span of factory building.And the increase of excavation span will be unfavorable for can increasing the adjoining rock stability of underground power house cavity group the hole simultaneously to dig and the support engineering amount, prolong the duration, increase construction investment.
Summary of the invention
The purpose of the utility model is, a kind of supporting construction of underground power house floor is provided.Can effectively reduce factory building excavation span, help the adjoining rock stability of underground power house cavity group, can guarantee the safety and saving construction investment of floor slab structure simultaneously again.
The technical scheme of the utility model:
The supporting construction of underground power house floor comprises through anchor pole being fixed on the anchor pole beam on the underground power house crag that the anchor pole beam is connected with secondary beam, on anchor pole beam and secondary beam, is provided with floor.
In aforementioned supporting construction, the vertical cross-section of said anchor pole beam is trapezoidal, and the bottom surface of anchor pole beam and the angle of horizontal plane are 30 °~45 °.
In aforementioned supporting construction, the vertical distance H of inclined-plane bottom to floor end face is not more than 3 times of vertical distance h of top, inclined-plane to floor end face at the bottom of the anchor pole beam at the bottom of the said anchor pole beam.
In aforementioned supporting construction, said anchor pole beam is arranged along the length direction of underground power house.
In aforementioned supporting construction, said anchor pole comprises and tiltedly draws anchor pole and shearing resistance anchor pole.
In aforementioned supporting construction, said shearing resistance anchor pole comprises horizontal shearing resistance anchor pole and diagonal brace shearing resistance anchor pole; Tiltedly draw anchor pole and the shearing resistance anchor pole length direction separation along underground power house, spacing is 0.7m~1.2m.
In aforementioned supporting construction, said tiltedly to draw the angle of inclination of anchor pole and the angle of horizontal plane be 15 °~30 °; And is 10~20cm at the crag place apart from the distance of anchor pole top surface of the beam.
In aforementioned supporting construction, the angle of inclination of said diagonal brace shearing resistance anchor pole is identical with the angle of inclination of anchor pole soffit; And high 10~20cm apart from anchor pole beam base.
compared with prior art; The underground power house floor supporting construction of the utility model; Floor and secondary beam directly are bearing on the anchor pole beam that is fixed on the factory building crag; Cancelled the pillar of brace summer and floor in the underground power house, can effectively reduce factory building excavation span, increase surrounding rock stability, can reduce cavern excavation support engineering amount again, save construction investment.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the sectional view at the utility model anchor pole beam position.
Being labeled as in accompanying drawing: 1-underground power house crag, 2-anchor pole beam, 3-secondary beam, 4-floor, 5-tiltedly draw anchor pole, the horizontal shearing resistance anchor pole of 6-, 7-diagonal brace shearing resistance anchor pole, 8-anchor pole beam steel skeleton, 9-secondary beam cage of reinforcement, 10-floor bar skeleton.
The specific embodiment
are done further to specify to the utility model below in conjunction with accompanying drawing and embodiment, but not as any restriction to the utility model.
The supporting construction of a kind of underground power house floor, as depicted in figs. 1 and 2.Comprise through anchor pole and be fixed on the anchor pole beam 2 on the underground power house crag 1.Anchor pole comprises and tiltedly draws anchor pole 5 and shearing resistance anchor pole that the shearing resistance anchor pole comprises horizontal shearing resistance anchor pole 6 and diagonal brace shearing resistance anchor pole 7; Tiltedly drawing the angle of inclination of anchor pole 5 and the angle of horizontal plane is 15 °~30 °; And is 10~20cm at the crag place apart from the distance of anchor pole top surface of the beam.The angle of inclination of diagonal brace shearing resistance anchor pole 7 is identical with the angle of inclination of anchor pole beam 2 bottom surfaces; And high 10~20cm apart from anchor pole beam 2 bases; Tiltedly draw anchor pole 5, horizontal shearing resistance anchor pole 6 and the diagonal brace shearing resistance anchor pole length direction separation along underground power house, spacing is 0.7m~1.2m.The vertical cross-section of anchor pole beam 2 is trapezoidal, and the bottom surface of anchor pole beam 2 and the angle of horizontal plane are 30 °~45 °; Bottom, inclined-plane, 2 end of anchor pole beam is not more than 3 times of (see figure 2)s of the vertical distance h of top, inclined-plane, 2 end of anchor pole beam to floor 4 end faces to the vertical distance H of floor 4 end faces; Anchor pole beam 2 is arranged along the length direction of underground power house.Anchor pole beam 2 is connected with secondary beam 3, on anchor pole beam 2 and secondary beam 3, is provided with floor 4.
The utility model is constructed by following operation:
One group of bolthole is made a call to according to designing requirement in on underground power house crag 1; Comprise lateral aperture, bow hole and uphole; In lateral aperture, bow hole and uphole, inject cement mortar or the cement paste that strength grade is not less than M20; Respectively with horizontal shearing resistance anchor pole 6, diagonal brace shearing resistance anchor pole 7 with tiltedly draw anchor pole 5 to insert in lateral apertures, bow hole and the uphole, all anchor poles are fixed in the bolthole then; Treat that cement mortar or cement paste in the bolthole reach after the design strength, with anchor pole and anchor pole beam steel skeleton 8 firm welding; Colligation secondary beam cage of reinforcement 9 and floor bar skeleton 10 on this basis again; Outside anchor pole beam steel skeleton 8, secondary beam cage of reinforcement 9 and floor bar skeleton 10, build template again, the concrete that is not less than C25 with strength grade is accomplished building of anchor pole beam 2, secondary beam 3 and floor 4.

Claims (8)

1. the supporting construction of underground power house floor, it is characterized in that: comprise through anchor pole being fixed on the anchor pole beam (2) on the underground power house crag (1), anchor pole beam (2) is connected with secondary beam (3), on anchor pole beam (2) and secondary beam (3), is provided with floor (4).
2. according to the said supporting construction of claim 1, it is characterized in that: the vertical cross-section of said anchor pole beam (2) is trapezoidal, and the bottom surface of anchor pole beam (2) and the angle of horizontal plane are 30 °~45 °.
3. according to the said supporting construction of claim 2, it is characterized in that: the vertical distance H of said anchor pole beam (2) inclined-plane, end bottom to floor (4) end face is not more than 3 times of vertical distance h of top, anchor pole beam (2) inclined-plane, the end to floor (4) end face.
4. according to the said supporting construction of claim 2, it is characterized in that: said anchor pole beam (2) is arranged along the length direction of underground power house.
5. according to the said supporting construction of claim 1, it is characterized in that: said anchor pole comprises and tiltedly draws anchor pole (5) and shearing resistance anchor pole; Tiltedly draw anchor pole (5) and the shearing resistance anchor pole length direction separation along underground power house, spacing is 0.7m~1.2m.
6. according to the said supporting construction of claim 5, it is characterized in that: said shearing resistance anchor pole comprises horizontal shearing resistance anchor pole (6) and diagonal brace shearing resistance anchor pole (7).
7. according to the said supporting construction of claim 5, it is characterized in that: said tiltedly to draw the angle of inclination of anchor pole (5) and the angle of horizontal plane be 15 °~30 °; And is 10~20cm at the crag place apart from the distance of anchor pole top surface of the beam.
8. according to the said supporting construction of claim 6, it is characterized in that: the angle of inclination of said diagonal brace shearing resistance anchor pole (7) is identical with the angle of inclination of anchor pole beam (2) bottom surface; And apart from anchor pole beam (2) high 10~20cm in base.
CN 201220135070 2012-04-01 2012-04-01 Supporting structure of underground factory floor Expired - Lifetime CN202500152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220135070 CN202500152U (en) 2012-04-01 2012-04-01 Supporting structure of underground factory floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220135070 CN202500152U (en) 2012-04-01 2012-04-01 Supporting structure of underground factory floor

Publications (1)

Publication Number Publication Date
CN202500152U true CN202500152U (en) 2012-10-24

Family

ID=47036768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220135070 Expired - Lifetime CN202500152U (en) 2012-04-01 2012-04-01 Supporting structure of underground factory floor

Country Status (1)

Country Link
CN (1) CN202500152U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733419A (en) * 2012-04-01 2012-10-17 中国水电顾问集团贵阳勘测设计研究院 Supporting structure of underground plant floor slab and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733419A (en) * 2012-04-01 2012-10-17 中国水电顾问集团贵阳勘测设计研究院 Supporting structure of underground plant floor slab and construction method

Similar Documents

Publication Publication Date Title
WO2018196151A1 (en) Prefabricated cavity-type perpend forming concrete shear wall
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN204753843U (en) PC primary and secondary roof beam bolted connection node
CN203296166U (en) Supporting structure of main module unit in module building
CN204491825U (en) Can restore funcitons Aseismic Structure System
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN103967332B (en) The construction method of a kind of building site enclosing
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN202500152U (en) Supporting structure of underground factory floor
CN103061408B (en) Powerful confined concrete core wall with obvious columns and hidden beams
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN105003035B (en) The construction method and structure of bridge machine steel ladder on a kind of underground power house
CN205445125U (en) Execute i -shaped assembled enclosure fast
CN104005476A (en) Prefabricated frame system easy to manufacture and mount and construction method
CN103276889B (en) Full hall fastener type steel pipe scaffold anti-side shifting method
CN102733419A (en) Supporting structure of underground plant floor slab and construction method
RU108785U1 (en) DEVICE FOR UNLOADING STONE CONSTRUCTIONS OF BUILDING
CN104674938A (en) Aseismic structure system capable of restoring functions
CN207974140U (en) A kind of limited high-order double bearing platform construction elevators basis of engineering specifications
CN204298993U (en) A kind of large floor height frame-shear-wall structure system
CN204940688U (en) Body of wall
CN204418208U (en) Anchor rod foundation
CN210195233U (en) Combined assembled plug pin type independent support system for post-cast strip template
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R

Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP

CP01 Change in the name or title of a patent holder

Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee after: China Kweiyang survey and design research institute company limited of electricity Jian group

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Patentee before: Guiyang Prospection & Design Inst, China Hydraulic Power Consultary Group

CX01 Expiry of patent term

Granted publication date: 20121024

CX01 Expiry of patent term