The supporting construction of underground power house floor
Technical field
the utility model relates to a kind of supporting construction of underground power house floor, belongs to the construction engineering technical field of underground power house.
Background technology
In
hydroelectric project, underground power house cavity group cavern quantity is many, scale is big, and spatial placement is staggered complicated, and surrounding rock of chamber stability is outstanding, and the size of factory building excavation span still is responsive to surrounding rock stability.Traditional underground power house floor is bearing on concrete column or the brick rod structure, and the setting of pillar has occupied certain space, arranges needs for satisfying electromechanical equipment, must strengthen the excavation span of factory building.And the increase of excavation span will be unfavorable for can increasing the adjoining rock stability of underground power house cavity group the hole simultaneously to dig and the support engineering amount, prolong the duration, increase construction investment.
Summary of the invention
The purpose of
the utility model is, a kind of supporting construction of underground power house floor is provided.Can effectively reduce factory building excavation span, help the adjoining rock stability of underground power house cavity group, can guarantee the safety and saving construction investment of floor slab structure simultaneously again.
The technical scheme of the utility model:
The supporting construction of
underground power house floor comprises through anchor pole being fixed on the anchor pole beam on the underground power house crag that the anchor pole beam is connected with secondary beam, on anchor pole beam and secondary beam, is provided with floor.
In
aforementioned supporting construction, the vertical cross-section of said anchor pole beam is trapezoidal, and the bottom surface of anchor pole beam and the angle of horizontal plane are 30 °~45 °.
In
aforementioned supporting construction, the vertical distance H of inclined-plane bottom to floor end face is not more than 3 times of vertical distance h of top, inclined-plane to floor end face at the bottom of the anchor pole beam at the bottom of the said anchor pole beam.
In
aforementioned supporting construction, said anchor pole beam is arranged along the length direction of underground power house.
In
aforementioned supporting construction, said anchor pole comprises and tiltedly draws anchor pole and shearing resistance anchor pole.
In
aforementioned supporting construction, said shearing resistance anchor pole comprises horizontal shearing resistance anchor pole and diagonal brace shearing resistance anchor pole; Tiltedly draw anchor pole and the shearing resistance anchor pole length direction separation along underground power house, spacing is 0.7m~1.2m.
In
aforementioned supporting construction, said tiltedly to draw the angle of inclination of anchor pole and the angle of horizontal plane be 15 °~30 °; And is 10~20cm at the crag place apart from the distance of anchor pole top surface of the beam.
In
aforementioned supporting construction, the angle of inclination of said diagonal brace shearing resistance anchor pole is identical with the angle of inclination of anchor pole soffit; And high 10~20cm apart from anchor pole beam base.
compared with prior art; The underground power house floor supporting construction of the utility model; Floor and secondary beam directly are bearing on the anchor pole beam that is fixed on the factory building crag; Cancelled the pillar of brace summer and floor in the underground power house, can effectively reduce factory building excavation span, increase surrounding rock stability, can reduce cavern excavation support engineering amount again, save construction investment.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the sectional view at the utility model anchor pole beam position.
Being labeled as in
accompanying drawing: 1-underground power house crag, 2-anchor pole beam, 3-secondary beam, 4-floor, 5-tiltedly draw anchor pole, the horizontal shearing resistance anchor pole of 6-, 7-diagonal brace shearing resistance anchor pole, 8-anchor pole beam steel skeleton, 9-secondary beam cage of reinforcement, 10-floor bar skeleton.
The specific embodiment
are done further to specify to the utility model below in conjunction with accompanying drawing and embodiment, but not as any restriction to the utility model.
The supporting construction of
a kind of underground power house floor, as depicted in figs. 1 and 2.Comprise through anchor pole and be fixed on the anchor pole beam 2 on the underground power house crag 1.Anchor pole comprises and tiltedly draws anchor pole 5 and shearing resistance anchor pole that the shearing resistance anchor pole comprises horizontal shearing resistance anchor pole 6 and diagonal brace shearing resistance anchor pole 7; Tiltedly drawing the angle of inclination of anchor pole 5 and the angle of horizontal plane is 15 °~30 °; And is 10~20cm at the crag place apart from the distance of anchor pole top surface of the beam.The angle of inclination of diagonal brace shearing resistance anchor pole 7 is identical with the angle of inclination of anchor pole beam 2 bottom surfaces; And high 10~20cm apart from anchor pole beam 2 bases; Tiltedly draw anchor pole 5, horizontal shearing resistance anchor pole 6 and the diagonal brace shearing resistance anchor pole length direction separation along underground power house, spacing is 0.7m~1.2m.The vertical cross-section of anchor pole beam 2 is trapezoidal, and the bottom surface of anchor pole beam 2 and the angle of horizontal plane are 30 °~45 °; Bottom, inclined-plane, 2 end of anchor pole beam is not more than 3 times of (see figure 2)s of the vertical distance h of top, inclined-plane, 2 end of anchor pole beam to floor 4 end faces to the vertical distance H of floor 4 end faces; Anchor pole beam 2 is arranged along the length direction of underground power house.Anchor pole beam 2 is connected with secondary beam 3, on anchor pole beam 2 and secondary beam 3, is provided with floor 4.
The utility model is constructed by following operation:
One group of bolthole is made a call to according to designing requirement in
on underground power house crag 1; Comprise lateral aperture, bow hole and uphole; In lateral aperture, bow hole and uphole, inject cement mortar or the cement paste that strength grade is not less than M20; Respectively with horizontal shearing resistance anchor pole 6, diagonal brace shearing resistance anchor pole 7 with tiltedly draw anchor pole 5 to insert in lateral apertures, bow hole and the uphole, all anchor poles are fixed in the bolthole then; Treat that cement mortar or cement paste in the bolthole reach after the design strength, with anchor pole and anchor pole beam steel skeleton 8 firm welding; Colligation secondary beam cage of reinforcement 9 and floor bar skeleton 10 on this basis again; Outside anchor pole beam steel skeleton 8, secondary beam cage of reinforcement 9 and floor bar skeleton 10, build template again, the concrete that is not less than C25 with strength grade is accomplished building of anchor pole beam 2, secondary beam 3 and floor 4.