Aqueduct anchor block pile foundation
Technical field:
The utility model relates to the water conservancy and hydropower construction field, particularly be a kind of aqueduct anchor block pile foundation.
Background technology:
At present, pressure pipeline anchor block pile foundation stake top section is directly to insert the anchor block underplate concrete, and there is stressed weak link in anchor block concrete construction joint structural plane; Even the stake top is imbedded in two layer concretes; But contact area is too little, and stress is concentrated, in order to satisfy the force request on stake top; Guarantee the resistance to overturning of anchor block, the cross dimensions of anchor block and pile foundation design is generally bigger.
The utility model content:
The purpose of the utility model is in order to overcome the deficiency of existing anchor block pile foundation, to provide a kind of and can improve the pile body stress, improve the resistance to overturning of anchor block and pile foundation, reducing the aqueduct anchor block pile foundation of anchor block and pile foundation cross dimensions.
The purpose of the utility model realizes like this:
The utility model aqueduct anchor block pile foundation; Comprise anchor block concrete lower floor, with compound anchor block concrete upper strata, the pile foundation of anchor block concrete lower floor; Pile body is arranged in the pile foundation, be positioned at the pile body top the rounding of all-in-one-piece with it frustum, be positioned at the cylinder of the all-in-one-piece with it cushion cap at rounding frustum top; Pile foundation top cylinder cushion cap passes that anchor block concrete lower floor embeds in the anchor block concrete upper strata and the rounding frustum embeds in the anchor block concrete lower floor; Rounding frustum and cylinder cushion cap are formed pile cover, because pile cover load area strengthens, the stressed better of section pushed up in stake; And can the upper and lower layer concrete of anchor block be connected more reliable, reduce anchor block and pile foundation cross dimensions.
The constuction joint face of anchor block concrete upper strata and anchor block concrete lower floor is the weak link of structure in the utility model; Rounding frustum through enlarging is connected anchor block concrete upper strata and anchor block concrete lower floor with the cylinder cushion cap; The load area of constuction joint face strengthens like this; Anchor block and pile foundation fuse, and whole stressing conditions is better.
The utility model is simple in structure; Easy construction, the moulding of pile foundation one-time-concreting, the rounding post cushion cap of pile foundation passes anchor block concrete lower floor and embeds in the anchor block concrete upper strata and the rounding frustum stretches in the anchor block concrete; Improved the bonding force of anchor block concrete construction joint face; It is stressed also better that stake is pushed up, and the resistance to overturning of anchor block and pile foundation is better, reduces the cross dimensions of anchor block and pile foundation.
Description of drawings:
Fig. 1 is the utility model structural representation.
Fig. 2 is the pile body structural representation.
The specific embodiment:
Referring to Fig. 1, Fig. 2; Present embodiment aqueduct anchor block pile foundation; Comprise anchor block concrete lower floor 4, with compound anchor block concrete upper strata 5, the pile foundation 7 of anchor block concrete lower floor, pile body 1 is arranged in the pile foundation, be positioned at the pile body top the rounding of all-in-one-piece with it frustum 2, be positioned at the cylinder of the all-in-one-piece with it cushion cap 3 at rounding frustum top.Pile foundation top cylinder cushion cap passes that anchor block concrete lower floor embeds in the anchor block concrete upper strata and the rounding frustum embeds in the anchor block concrete lower floor.
Rounding frustum 2 has been formed pile cover with cylinder cushion cap 3, and the pile cover section is bigger than pile body 1.The constuction joint face of the upper and lower layer of anchor block concrete is stressed weak link, improves the bonding force of constuction joint face 6 through the pile cover that enlarges.Simultaneously the cylinder cushion cap passes that anchor block concrete lower floor embeds in the anchor block concrete upper strata and rounding frustum embedding anchor block concrete lower floor.This structure has been improved the stress of stake, improves the resistance to overturning of anchor block and pile foundation, reduces the cross dimensions of anchor block and pile foundation.