CN202498324U - Welding device for tower body standard knot steps - Google Patents
Welding device for tower body standard knot steps Download PDFInfo
- Publication number
- CN202498324U CN202498324U CN2012200676631U CN201220067663U CN202498324U CN 202498324 U CN202498324 U CN 202498324U CN 2012200676631 U CN2012200676631 U CN 2012200676631U CN 201220067663 U CN201220067663 U CN 201220067663U CN 202498324 U CN202498324 U CN 202498324U
- Authority
- CN
- China
- Prior art keywords
- seat
- basis
- base seat
- steps
- standard knot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
A welding device for tower body standard knot steps comprises a lower base seat, an upper base seat, fixing devices, a fixed reinforcing frame, support frames, positioning plates, positioning sleeves, and positioning bolts. The lower base seat is positioned in a bottom portion of the whole welding device. A bottom portion of the upper base seat is fixedly connected with an upper portion of the lower base plate. The positioning bolts transversely penetrate through the upper base seat and fix the steps. The positioning sleeves transversely penetrate through the upper base seat and are tightly contacted with arc surfaces of front ends of the steps. The fixed reinforcing frame transversely penetrates through the upper base seat and fixes steel pipes at two sides of the upper base seat with the fixing devices. The support frames used for supporting the steel pipes are respectively fixed at two sides of the lower base seat. The welding device for the tower body standard knot steps has the advantages that: the welding device for the tower body standard knot steps has a simple structure, the non-synchronization of the steps at two sides of a main chord member can be avoided, the welding performance of step plates and the main chord member can be guaranteed, and the production efficiency is improved.
Description
Technical field
This utility model relates to a kind of welding tooling, and the welding tooling that particularly a kind of body of the tower standard knot is marked time belongs to body of the tower manufacturing technology field.
Background technology
Very universal in the middle of the colleague from rising the type derrick crane; The processing welding of standard knot is the manufacturing difficult point of this crane; Because the jacking required distance is accurate in standard knot jacking process; General processes goes out marks time that the mark time welding reliability of nonsynchronous phenomenon and step plate and main swing arm of both sides can to occur not high, causes standard knot in the jacking process, deviation to occur, influences the security of complete machine.
Summary of the invention
Goal of the invention: the purpose of the utility model provides a kind of simple in structure, and the body of the tower standard knot that can guarantee the welding quality of marking time of the body of the tower standard knot welding tooling of marking time.
Technical scheme: a kind of body of the tower standard knot welding tooling of marking time; Comprise down the basis seat, go up the basis seat, fixture, fixedly hog frame, bracing frame, location-plate, positioning sleeve and bolt; Said basis down seat is positioned at whole frock bottom; Said bottom of going up the basis seat is fixedly connected with seat top, following basis, and said bolt crosses the basis seat and fixedly marks time, and said positioning sleeve crosses basic seat and closely contacts with the arc surface of the front end of marking time; Said fixedly hog frame crosses basis seat and the fixing steel pipe of going up seat both sides, basis of fixture; The bracing frame that is used for supporting steel pipe is individually fixed in down seat both sides, basis.At first will mark time and fix and accurate location through bolt and positioning sleeve; And then through bracing frame steel pipe flatly is placed on basis seat both sides respectively, at last through fixture and fixedly hog frame the steel pipe location is guaranteed that the distance between two steel pipes meets the requirements.
For the distance between the depth of parallelism that guarantees two steel pipes and two steel pipes meets the requirements; Said location-plate comprises first location-plate and second location-plate; Said first location-plate is fixedly connected with last basis seat and is positioned at the bracing frame top, and said second location-plate is in fixture with fixedly between the hog frame.
Beneficial effect: the utility model is simple in structure, can avoid the pedal of main swing arm both sides nonsynchronous phenomenon to occur, and guarantees the welding performance of step plate and main swing arm, has improved production efficiency.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the cutaway view of the utility model at the fixture place;
Fig. 3 is the cutaway view of the utility model at the bracing frame place.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is described further.
As shown in the figure; A kind of body of the tower standard knot welding tooling of marking time; Comprise down basis seat 1, go up basis seat 2, fixture 3, fixedly hog frame 4, bracing frame 5, location-plate 6, positioning sleeve 7 and bolt 8, said basis down seat 1 is positioned at whole frock bottom, the said bottom of basis seat 2 of going up is fixedly connected with basic 1 top down; Said bolt 8 crosses basis seat 2 and fixedly marks time 9, and said positioning sleeve 7 crosses basic 2 and closely contacts with the arc surface of 9 front ends of marking time; Said fixedly hog frame 4 crosses basis seat 2 and the fixture 3 fixing steel pipes 10 of going up seat 2 both sides, basis; The bracing frame 5 that is used for supporting steel pipe 10 is individually fixed in down seat 1 both sides, basis.At first will mark time and 9 fix and accurately locate through bolt 8 and positioning sleeve 7; And then through bracing frame 5 steel pipe 10 flatly is placed on basis seat 2 both sides respectively, at last through fixture 3 and fixedly hog frame 4 steel pipe 10 location are guaranteed that the distance between two steel pipes 10 meets the requirements.
For the distance between the depth of parallelism that guarantees two steel pipes 10 and two steel pipes 10 meets the requirements; Said location-plate 6 comprises first location-plate 61 and second location-plate 62; Said first location-plate 61 is fixedly connected with last basis seat 2 and is positioned at bracing frame 5 tops, and said second location-plate 62 is in fixture 3 with fixedly between the hog frame 4.
Claims (2)
1. body of the tower standard knot welding tooling of marking time; It is characterized in that: comprise down basis seat (1), go up basis seat (2), fixture (3), fixedly hog frame (4), bracing frame (5), location-plate (6), positioning sleeve (7) and bolt (8); Said basis seat (1) down is positioned at whole frock bottom; Said bottom of going up basis seat (2) is fixedly connected with seat (1) top, following basis; Said bolt (8) crosses basis seat (2) and fixedly marks time (9), and said positioning sleeve (7) crosses basis seat (2) and closely contacts with the arc surface of (9) front end of marking time; Said fixedly hog frame (4) crosses basis seat (2) and the fixing steel pipe (10) of going up seat (2) both sides, basis of fixture (3); The bracing frame (5) that is used for supporting steel pipe (10) is individually fixed in down seat (1) both sides, basis.
2. the body of the tower standard knot according to claim 1 welding tooling of marking time; It is characterized in that: said location-plate (6) comprises first location-plate (61) and second location-plate (62); Said first location-plate (61) is fixedly connected with last basis seat (2) and is positioned at above the bracing frame (5), and said second location-plate (62) is positioned at fixture (3) and fixedly between the hog frame (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200676631U CN202498324U (en) | 2012-02-28 | 2012-02-28 | Welding device for tower body standard knot steps |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200676631U CN202498324U (en) | 2012-02-28 | 2012-02-28 | Welding device for tower body standard knot steps |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202498324U true CN202498324U (en) | 2012-10-24 |
Family
ID=47034950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200676631U Expired - Fee Related CN202498324U (en) | 2012-02-28 | 2012-02-28 | Welding device for tower body standard knot steps |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202498324U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114749836A (en) * | 2022-05-11 | 2022-07-15 | 湖南省辉泰电力器材有限公司 | Power transmission line iron tower body welding device |
-
2012
- 2012-02-28 CN CN2012200676631U patent/CN202498324U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114749836A (en) * | 2022-05-11 | 2022-07-15 | 湖南省辉泰电力器材有限公司 | Power transmission line iron tower body welding device |
CN114749836B (en) * | 2022-05-11 | 2023-08-01 | 湖南省辉泰电力器材有限公司 | Welding device for tower body of transmission line iron tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204052557U (en) | Steel tube punching device | |
CN203726044U (en) | Splicing and welding tool for cargo boom of tower crane | |
CN203292739U (en) | Welding tool for steering frame side beam | |
CN102398164B (en) | For the fixed head of screw hole clamp of small flange of exhaust pipe drill | |
CN202498324U (en) | Welding device for tower body standard knot steps | |
CN202964140U (en) | Drilling tool for one-time clamping of two-cylinder exhaust pipe of diesel engine | |
CN202934161U (en) | Drilling template | |
CN201913276U (en) | Special steel pipe rod drilling device | |
CN201997888U (en) | Welding jig | |
CN204711278U (en) | A kind of hole drilling die | |
CN203401113U (en) | Drilling jig of half coupling | |
CN204449765U (en) | A kind of cross plug board assembly tool | |
CN204413464U (en) | A kind of box-shaped column assembly device | |
CN203649748U (en) | Device for aligning head ends of flange plates and webs for H-shaped section steel assembly apparatus | |
CN203527039U (en) | Fixing device used for drilling of supporting pin | |
CN203141138U (en) | Horizontal type hook body machining center positioning device | |
CN202263959U (en) | Foot pin hole processing mold for ladder stand steel pipe | |
CN204817559U (en) | Crane end beam correcting unit | |
CN202291945U (en) | Frame welding and positioning device for baby carrier | |
CN203887450U (en) | Locating device for belt conveyor middle frame supporting leg | |
CN202607657U (en) | Automatic center searching template | |
CN203443991U (en) | Installation positioner for electric meter box | |
CN202964142U (en) | Diesel engine four-cylinder exhaust pipe drilling tool clamped for one time | |
CN201922274U (en) | Positioning clamp | |
CN205290207U (en) | New forms of energy car battery frame crossbeam weld fixture apparatu |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121024 Termination date: 20180228 |