CN202493232U - Drilling pressure control device - Google Patents

Drilling pressure control device Download PDF

Info

Publication number
CN202493232U
CN202493232U CN 201220136600 CN201220136600U CN202493232U CN 202493232 U CN202493232 U CN 202493232U CN 201220136600 CN201220136600 CN 201220136600 CN 201220136600 U CN201220136600 U CN 201220136600U CN 202493232 U CN202493232 U CN 202493232U
Authority
CN
China
Prior art keywords
drilling
pipeline
pressure
fixedly connected
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220136600
Other languages
Chinese (zh)
Inventor
杨刚
兰作军
伊明
戴勇
郑传义
刘永伟
杨兆亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN 201220136600 priority Critical patent/CN202493232U/en
Application granted granted Critical
Publication of CN202493232U publication Critical patent/CN202493232U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the field of drilling technology for controlling fluctuation of a pressure at the bottom of a well and discloses a drilling pressure control device. The drilling pressure control device comprises a drilling pump, a well mouth rotary blowout preventer, a circular drilling liquid tank, a return pressure pump, a controlled pressure drilling throttle manifold, a drilling crew throttle manifold, a deposition tank and a liquid-gas separator, wherein the well mouth rotary blowout preventer and a drilling spool are fixedly mounted together; and the inlet of the drilling pump is provided with a liquid inlet pipe in a connecting manner. By adding branch loops of the drilling liquid entering into a shaft, the drilling pressure control device, disclosed by the utility model, has the advantages of reducing difficulty of controlling the pressure of the shaft by the controlled pressure drilling throttle manifold and damage to each valve of the controlled pressure drilling throttle manifold, reducing requirements of the controlled pressure drilling operation to a drilling machine, being better for the implementation of the controlled pressure drilling operation and enabling the drilling liquid entering into the shaft during the controlled pressure drilling operation to reach to the ruled requirements, thereby realizing the goal of controlled pressure drilling; ground devices are simple in structure; and the drilling pressure control device is convenient and easy to operate.

Description

The drilling well pressure control device
Technical field
the utility model relates to the drilling technology field of controlling bottom hole pressure surge, is a kind of drilling well pressure control device.
Background technology
controlled pressure drilling technology is one of important content of 21 century drilling well development of new techniques, and international-domestic number of applications practice shows that the controlled pressure drilling technology has realistic meaning to safety drilling, the prevention hole condition complicacy of narrow density window well.The range request borehole pump is crossed in controlled pressure drilling turn on pump and termination of pumping can be by the strokes per minute substep turn on pump and the termination of pumping of regulation; Drilling fluid to realize getting in the pit shaft increases and reduces by the staged of stipulating; But the electric drilling machine particularly turn on pump and the termination of pumping of machine dimensions drill can't accurately be controlled, and can not satisfy controlled pressure drilling closes termination of pumping to the borehole pump turn on pump requirement.
Summary of the invention
the utility model provides a kind of drilling well pressure control device; Overcome the deficiency of above-mentioned prior art, it can effectively solve the drilling process middle-opening pump and the problem of controlled pressure drilling to the requirement of borehole pump turn on pump and termination of pumping can't be accurately controlled, can't be satisfied in termination of pumping.
The technical scheme of the utility model realizes through following measure: a kind of drilling well pressure control device comprises well head rotating blowout preventer, drilling spool, borehole pump, circulating drilling flow container, controlled pressure drilling choke manifold, drilling team's choke manifold, liquid-gas separator, settling tank and backpressure pump; Well head rotating blowout preventer and drilling spool are fixedly installed togather; The import of borehole pump is fixedly connected with feed tube; Be fixedly connected with first pipeline between drilling well delivery side of pump and the well head rotating blowout preventer; Be fixedly connected with second pipeline between feed tube and the circulating drilling flow container; Be fixedly connected with the 3rd pipeline between first pipeline and the circulating drilling flow container, be fixedly connected with the 4th pipeline between the import of well head rotating blowout preventer and controlled pressure drilling choke manifold, be fixedly connected with the 5th pipeline between drilling spool and the drilling team's choke manifold; Be fixedly connected with the 6th pipeline between the outlet of drilling team's choke manifold and the liquid-gas separator; Be fixedly connected with the 7th pipeline between the liquid outlet of liquid-gas separator and the settling tank, be fixedly connected with the 8th pipeline between settling tank and the circulating drilling flow container, be fixedly connected with the 9th pipeline between the outlet of controlled pressure drilling choke manifold and the 7th pipeline; Backpressure pump is fixed together through the tenth pipeline and controlled pressure drilling choke manifold, on the 3rd pipeline of circulating drilling flow container, is installed with slide valve, ball-and-seat and choke valve from first pipeline successively.
Be to the further optimization of above-mentioned utility model technical scheme below or/and improve:
above-mentioned settling tank can be the taper settling tank.
above-mentioned first pipeline can be hard tube.
above-mentioned the 4th pipeline can be high-pressure hose.
the utility model is through increasing the shunting circuit of the drilling fluid that gets into pit shaft; With the difficulty that reduces controlled pressure drilling choke manifold control wellbore pressure with to the infringement of each valve of controlled pressure drilling choke manifold, reduce the requirement of controlled pressure drilling operation to rig, be more conducive to the enforcement of controlled pressure drilling operation; Realize getting in the controlled pressure drilling operation process requirement that the interior drilling fluid of pit shaft reaches regulation simultaneously; With the target of realization controlled pressure drilling, and ground installation is simple in structure, and is easy and simple to handle.
Description of drawings
accompanying drawing 1 is the process flow diagram of the utility model.
Coding in accompanying drawing is respectively: 1 is the well head rotating blowout preventer, and 2 is drilling spool, and 3 is borehole pump, and 4 is feed tube, and 5 is first pipeline; 6 is the circulating drilling flow container, and 7 is second pipeline, and 8 is the 3rd pipeline, and 9 is the controlled pressure drilling choke manifold, and 10 is the 4th pipeline; 11 is drilling team's choke manifold, and 12 is the 5th pipeline, and 13 is liquid-gas separator, and 14 is the 6th pipeline, and 15 is settling tank; 16 is the 7th pipeline, and 17 is the 8th pipeline, and 18 is the 9th pipeline, and 19 is backpressure pump; 20 is the tenth pipeline, and 21 is slide valve, and 22 is ball-and-seat, and 23 is choke valve.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing the utility model is further described:
embodiment: shown in accompanying drawing 1, this drilling well pressure control device comprises well head rotating blowout preventer 1, drilling spool 2, borehole pump 3, circulating drilling flow container 6, controlled pressure drilling choke manifold 9, drilling team's choke manifold 11, liquid-gas separator 13, settling tank 15 and backpressure pump 19; Well head rotating blowout preventer 1 is fixedly installed togather with drilling spool 2; The import of borehole pump 3 is fixedly connected with feed tube 4; Be fixedly connected with first pipeline 5 between the outlet of borehole pump 3 and the well head rotating blowout preventer 1; Be fixedly connected with second pipeline 7 between feed tube 4 and the circulating drilling flow container 6; Be fixedly connected with the 3rd pipeline 8 between first pipeline 5 and the circulating drilling flow container 6, be fixedly connected with the 4th pipeline 10 between the import of well head rotating blowout preventer 1 and controlled pressure drilling choke manifold 9, be fixedly connected with the 5th pipeline 12 between drilling spool 2 and the drilling team's choke manifold 11; Be fixedly connected with the 6th pipeline 14 between the outlet of drilling team's choke manifold 11 and the liquid-gas separator 13; Be fixedly connected with the 7th pipeline 16 between the liquid outlet of liquid-gas separator 13 and the settling tank 15, be fixedly connected with the 8th pipeline 17 between settling tank 15 and the circulating drilling flow container 6, be fixedly connected with the 9th pipeline 18 between the outlet of controlled pressure drilling choke manifold 9 and the 7th pipeline 16; Backpressure pump 19 is fixed together with controlled pressure drilling choke manifold 9 through the tenth pipeline 20, on the 3rd pipeline 8 of circulating drilling flow container 6, is installed with slide valve 21, ball-and-seat 22 and choke valve 23 from first pipeline 5 successively.Set up the drilling fluid shunting circuit through borehole pump 3, circulating drilling flow container 6 and the 3rd pipeline 8, slide valve 21, choke valve 23 can be controlled automatically, and the minimum bearing capacity that slide valve 21, ball-and-seat 22, choke valve 23, the 3rd pipeline 8 require is 35 MPas.
Can according to actual needs above-mentioned drilling well pressure control device be done further to optimize or/and improve:
are as shown in Figure 1, and settling tank 15 is the taper settling tank.
are as shown in Figure 1, and first pipeline 5 is a hard tube.
are as shown in Figure 1, and the 4th pipeline 10 is a high-pressure hose.
above technical characterictic has constituted the embodiment of the utility model, and it has stronger compliance and implementation result, can increase and decrease non-essential technical characterictic according to actual needs, satisfies the demand of different situations.
The method for using of the utility model drilling well pressure control device is undertaken by following step:
(1) when being the duty of normal drilling well or circulation of drilling fluid, slide valve 21 is in closed condition, controls bottom hole pressure surge separately by controlled pressure drilling choke manifold 9, realizes controlled pressure drilling;
(2) when being the turn on pump duty, borehole pump 3 is opened by strokes per minute step by step, opens slide valve 21 the drilling fluid displacement staged that gets in the pit shaft is increased; Shunt through regulating 23 pairs of drilling fluids that get in the pit shaft of choke valve, cooperate the operation of controlled pressure drilling choke manifold 9 and backpressure pump 19 simultaneously, carry out back pressure control; Make the smooth transition of whole pit shaft internal pressure; The balance that keep-ups pressure when treating that turn on pump end-of-job pump gets into normal operating conditions, is closed backpressure pump 19, slide valve 21; Control bottom hole pressure surge separately by controlled pressure drilling choke manifold 9, realize controlled pressure drilling;
When for pass pump work state, borehole pump 3 progressively turns down by strokes per minute (3), opens slide valve 21 the drilling fluid displacement staged that gets in the pit shaft is reduced; Shunt through regulating 23 pairs of drilling fluids that get in the pit shaft of choke valve; Open backpressure pump 19 simultaneously to cooperate control controlled pressure drilling choke manifold 9, carry out back pressure control, make the smooth transition of whole pit shaft internal pressure; To reach pressure balance; Wait to close pump and finish, close slide valve 21, by controlled pressure drilling choke manifold 9 and backpressure pump 19 control back pressure.
above technical characterictic has constituted the embodiment of the utility model, and it has stronger compliance and implementation result, can increase and decrease non-essential technical characterictic according to actual needs, satisfies the demand of different situations.

Claims (5)

1. a drilling well pressure control device is characterized in that comprising well head rotating blowout preventer, drilling spool, borehole pump, circulating drilling flow container, controlled pressure drilling choke manifold, drilling team's choke manifold, liquid-gas separator, settling tank and backpressure pump; Well head rotating blowout preventer and drilling spool are fixedly installed togather; The import of borehole pump is fixedly connected with feed tube; Be fixedly connected with first pipeline between drilling well delivery side of pump and the well head rotating blowout preventer; Be fixedly connected with second pipeline between feed tube and the circulating drilling flow container; Be fixedly connected with the 3rd pipeline between first pipeline and the circulating drilling flow container, be fixedly connected with the 4th pipeline between the import of well head rotating blowout preventer and controlled pressure drilling choke manifold, be fixedly connected with the 5th pipeline between drilling spool and the drilling team's choke manifold; Be fixedly connected with the 6th pipeline between the outlet of drilling team's choke manifold and the liquid-gas separator; Be fixedly connected with the 7th pipeline between the liquid outlet of liquid-gas separator and the settling tank, be fixedly connected with the 8th pipeline between settling tank and the circulating drilling flow container, be fixedly connected with the 9th pipeline between the outlet of controlled pressure drilling choke manifold and the 7th pipeline; Backpressure pump is fixed together through the tenth pipeline and controlled pressure drilling choke manifold, on the 3rd pipeline of circulating drilling flow container, is installed with slide valve, ball-and-seat and choke valve from first pipeline successively.
2. drilling well pressure control device according to claim 1 is characterized in that settling tank is the taper settling tank.
3. drilling well pressure control device according to claim 1 and 2 is characterized in that first pipeline is a hard tube.
4. drilling well pressure control device according to claim 1 and 2 is characterized in that the 4th pipeline is a high-pressure hose.
5. drilling well pressure control device according to claim 3 is characterized in that the 4th pipeline is a high-pressure hose.
CN 201220136600 2012-04-01 2012-04-01 Drilling pressure control device Expired - Lifetime CN202493232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220136600 CN202493232U (en) 2012-04-01 2012-04-01 Drilling pressure control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220136600 CN202493232U (en) 2012-04-01 2012-04-01 Drilling pressure control device

Publications (1)

Publication Number Publication Date
CN202493232U true CN202493232U (en) 2012-10-17

Family

ID=46999466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220136600 Expired - Lifetime CN202493232U (en) 2012-04-01 2012-04-01 Drilling pressure control device

Country Status (1)

Country Link
CN (1) CN202493232U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847287A (en) * 2014-02-19 2015-08-19 中国石油化工集团公司 Balanced pressure drilling pressure control device and method
CN106545305A (en) * 2015-09-23 2017-03-29 中国石油化工股份有限公司 A kind of drilling-fluid circulation system and its control method
CN107201884A (en) * 2017-07-10 2017-09-26 中国石油集团西部钻探工程有限公司 Fine controlled pressure drilling standpipe flow shunt control device and its back pressure compensation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847287A (en) * 2014-02-19 2015-08-19 中国石油化工集团公司 Balanced pressure drilling pressure control device and method
CN106545305A (en) * 2015-09-23 2017-03-29 中国石油化工股份有限公司 A kind of drilling-fluid circulation system and its control method
CN106545305B (en) * 2015-09-23 2019-08-02 中国石油化工股份有限公司 A kind of drilling-fluid circulation system and its control method
CN107201884A (en) * 2017-07-10 2017-09-26 中国石油集团西部钻探工程有限公司 Fine controlled pressure drilling standpipe flow shunt control device and its back pressure compensation method

Similar Documents

Publication Publication Date Title
CN102606098A (en) Drilling pressure-control device and usage thereof
CN108166940B (en) A kind of by-pass valve of screwdrill and its application method with huge discharge shunting function
CN107387030B (en) Relay lifting oil production design method utilizing local well gas
CN202493232U (en) Drilling pressure control device
CN109723409A (en) A kind of underground gas-liquid separation lifting technology tubing string
CN104500463A (en) Submersible-pump hydraulic control system
CN203412535U (en) Drilling fluid shunt device for starting or stopping pump through multiple steps
CN201844198U (en) PCP (pump control pump) long-distance pipeline oil transfer high-efficiency energy-saving pressure stabilizing and flow adjusting system
CN202338255U (en) Multifunctional well killing manifold connecting device
CN203978413U (en) The meticulous pressure control device of plural parallel stage throttling
CN204003391U (en) Solid plunger sand-proof oil-well pump
CN206830145U (en) Well casing gas recovery device
CN202300260U (en) Automatic throttle manifold system
CN205975799U (en) Water supply pipe well with a plurality of suction pumps
CN105401925B (en) Gas storage bottom hole throttling device and throttling method
CN204627903U (en) Slurry pump flow continuous adjustment system
CN108560638A (en) Tap water peak period peak regulation system and its peak regulating method
CN203641610U (en) Sewage flow controller
CN202628638U (en) Supply return circuit
CN107103166B (en) The differential pressure air tank and design method of a kind of water hammer-resistant
CN202381396U (en) Deflation type adjustable nozzle for electrical submersible pump
CN203453161U (en) Speed adjusting device for slurry system of drilling machine
CN207421009U (en) A kind of horizontal directional drilling machine pull-back force transient rise control system
CN202348185U (en) Self-supporting local circulation system
CN206929146U (en) A kind of ropeway fluid power system using accumulator pressure regulation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201104

Address after: 100120 Beijing Xicheng District six laying Kang

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Xibu Drilling Engineering Co.,Ltd.

Address before: 834000 the Xinjiang Uygur Autonomous Region Karamay Hongyan Road No. 80 Western Drilling Engineering Technology Research Institute of science and technology management department

Patentee before: CNPC Xibu Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20121017

CX01 Expiry of patent term