CN202492793U - Large-diameter bonding-free prestress stressed unit - Google Patents

Large-diameter bonding-free prestress stressed unit Download PDF

Info

Publication number
CN202492793U
CN202492793U CN2012201387465U CN201220138746U CN202492793U CN 202492793 U CN202492793 U CN 202492793U CN 2012201387465 U CN2012201387465 U CN 2012201387465U CN 201220138746 U CN201220138746 U CN 201220138746U CN 202492793 U CN202492793 U CN 202492793U
Authority
CN
China
Prior art keywords
steel bar
prestress
prestressed steel
diameter
free
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201387465U
Other languages
Chinese (zh)
Inventor
李连友
李曼容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Road and Bridge Corp
Original Assignee
China Road and Bridge Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Road and Bridge Corp filed Critical China Road and Bridge Corp
Priority to CN2012201387465U priority Critical patent/CN202492793U/en
Application granted granted Critical
Publication of CN202492793U publication Critical patent/CN202492793U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

A large-diameter bonding-free prestress stressed unit comprises a prestress steel bar, matched anchor backing plates and anchoring nuts, wherein the prestress steel bar, the matched anchor backing plates and the anchoring nuts are assembled together in a combined mode. The diameter of the prestress steel bar is 10-25 millimeters, the surface of the prestress steel bar is coated with antiseptic lubricating grease and is covered with a protective jacket, and two ends of the prestress steel bar are provided with end threads with a thread pitch of 1.5 millimeters. The large-diameter bonding-free prestress stressed unit has the advantages of being simple in structure, the surface of the prestress steel bar is covered with the polyethylene resin protective jacket after being coated with the antiseptic lubricating grease, and the bonding-free structure of the steel bar and concrete is formed. Therefore, the surface of the steel bar is prevented from being corroded by air and water which are inside the concrete, shear resistant performance of the concrete structure is improved, the usage amount of steel products is lowered.

Description

A kind of major diameter prestressing without bondn stress unit
Technical field
The utility model relates to prestressing force stress unit technical field, especially relates to a kind of major diameter prestressing without bondn rod iron stress unit.
Background technology
Particularly a kind of high-speed railway bridge prestressed concrete continuous beam, isostructural stressed list of continuous rigid frame of being used for
At present, the vertical prestressing system of high-speed railway bridge raising middle flask web is main with finish rolling deformed bar, and the coarse and tensioning equipment of its screw thread does not match, and the effective prestress after the stretch-draw is difficult to accurate control, and the mud jacking after the stretch-draw also brings many inconvenience to construction; Simultaneously, the applied stress of reinforcing bar generally is controlled at about 750MPa, and the material aspect has caused waste.
Therefore, a kind of appearance that is used for the high-intensity major diameter prestressing without bondn of high-speed railway bridge rod iron stress unit is necessary.
The utility model content
The utility model is to provide a kind of high-intensity major diameter prestressing without bondn of high-speed railway bridge rod iron stress unit that is used for for solving the problems of the technologies described above.
The technical problem that the utility model solved adopts following technical scheme to realize:
A kind of major diameter prestressing without bondn stress unit; Comprise prestressed steel bar and supporting anchor plate, anchoring nut, said prestressed steel bar and said supporting anchor plate, said anchoring nut combinations are assembled together, wherein; The prestressed steel bar diameter is 10-25mm; Said prestressed steel bar surfaces coated is covered with cosmoline fat, and is coated with sheath, is provided with the end thread that pitch is 1.5mm at the prestressed steel bar two ends.
Preferably, said prestressed steel bar is a underrelaxation light round steel bar, and its diameter is 10-25mm, and intensity rank is 1420MPa or 1570MPa, and ductility is 35, and prestress system adopts the stretch-draw anchor mode.
Further, said sheath is the high-density polyethylene resin sheath.
The beneficial effect that the utlity model has is: simple in structure; Behind the anticorrosion grease of prestressed steel bar surface-coated; Coated by the polyvinyl resin sheath, form the structure that rod iron and concrete do not have bonding, avoided the rod iron surface by the corrosion of air in the concrete and moisture; Improve the shear behavior of concrete structure, reduced the steel use amount.
Description of drawings
Fig. 1 is the utility model: a kind of structural representation of major diameter prestressing without bondn stress unit;
Among the figure: 1-prestressed steel bar, 2-anchor plate, 3-anchoring nut, 4-high-density polyethylene resin sheath, 5-end thread.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with concrete diagram, further set forth the utility model.
With reference to shown in Figure 1, a kind of major diameter prestressing without bondn stress unit comprises prestressed steel bar 1 and supporting anchor plate 2, anchoring nut 3; Prestressed steel bar 1 and supporting anchor plate 2, anchoring nut 3 combine and assemble are together; Wherein, prestressed steel bar 1 diameter is 10-25mm, and prestressed steel bar 1 surfaces coated is covered with cosmoline fat; And be coated with high-density polyethylene resin sheath 4, be provided with the end thread 5 that pitch is 1.5mm at prestressed steel bar 1 two ends.
Prestressed steel bar 1 is underrelaxation light round steel bar, and its diameter is 10-25mm, and intensity rank is 1420MPa or 1570MPa, and ductility is 35, and prestress system adopts the stretch-draw anchor mode.
More than show and described basic principle of the utility model and the advantage of principal character and the utility model.The technician of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the manual that the utility model just is described; Under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, and these variations and improvement all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (3)

1. major diameter prestressing without bondn stress unit; Comprise prestressed steel bar and supporting anchor plate, anchoring nut, said prestressed steel bar and said supporting anchor plate, said anchoring nut combinations are assembled together, wherein; The prestressed steel bar diameter is 10-25mm; Said prestressed steel bar surfaces coated is covered with cosmoline fat, and is coated with sheath, is provided with the end thread that pitch is 1.5mm at the prestressed steel bar two ends.
2. a kind of major diameter prestressing without bondn stress unit according to claim 1; It is characterized in that said prestressed steel bar is a underrelaxation light round steel bar, its diameter is 10-25mm, and intensity rank is 1420MPa or 1570MPa; Ductility is 35, and prestress system adopts the stretch-draw anchor mode.
3. a kind of major diameter prestressing without bondn stress unit according to claim 1 is characterized in that said sheath is the high-density polyethylene resin sheath.
CN2012201387465U 2012-04-05 2012-04-05 Large-diameter bonding-free prestress stressed unit Expired - Lifetime CN202492793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201387465U CN202492793U (en) 2012-04-05 2012-04-05 Large-diameter bonding-free prestress stressed unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201387465U CN202492793U (en) 2012-04-05 2012-04-05 Large-diameter bonding-free prestress stressed unit

Publications (1)

Publication Number Publication Date
CN202492793U true CN202492793U (en) 2012-10-17

Family

ID=46999028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201387465U Expired - Lifetime CN202492793U (en) 2012-04-05 2012-04-05 Large-diameter bonding-free prestress stressed unit

Country Status (1)

Country Link
CN (1) CN202492793U (en)

Similar Documents

Publication Publication Date Title
CN204152236U (en) A kind of external prestressing strengthening device
CN104533018A (en) Prestressed FRP rib tensioning and anchoring device
CN105735153B (en) A kind of box-girder bridge girder web plate diagonal crack ruggedized construction and its construction method
CN103161318A (en) Screw thread twist-stretch transverse stretch-draw prestress exerting system of adjustable and controllable bamboo and wooden beam
CN202787668U (en) Rear bolt anchoring system for cantilever steel I-beam
CN202047353U (en) Concrete bridge body of expressway or railway and prestressed concrete continuous box girder
AT8142U2 (en) ALPINE ANCHOR
CN202492793U (en) Large-diameter bonding-free prestress stressed unit
CN202731398U (en) Base for fixedly mounting light pole, telegraph pole and high-tension wire tower
CN204357005U (en) Prestressed FRP rib tensioning and anchoring device
CN205501848U (en) Box -girder bridge girder web oblique segmentation seam reinforced structure
CN102071648B (en) Method and device for correcting box steel girder in construction
CN201722592U (en) Larger-diameter unbonded prestressed stress unit for high-speed railway bridges
CN202073897U (en) Steel structure bolt for megawatt unit boiler
CN203924656U (en) A kind of high-altitude overlength cable-stayed type shaped steel job platform structure
CN206721650U (en) The spliced sidewalk pedestrian andante bracket of railroad bridge
CN109112977B (en) Rapid prestress reinforced bridge body structure and method
CN203174889U (en) Extrusion screw anchorage device
CN211596786U (en) Environmental protection side slope support device
CN222314393U (en) A slow-bonding prestressed steel rod
CN207582319U (en) A kind of pre-stressed bridge deflection adjusting device based on municipal bridge field
CN201474172U (en) Epoxy steel bar with ribs on three surfaces
CN206071088U (en) The system of prestress rope integrative consolidation board wall
CN202882217U (en) Unbonded prestressed steel reinforced concrete (SRC) beam
CN204139208U (en) FRP regeneration concrete cover

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121017