CN202492792U - Concrete wind shield structure of steel truss cable-stayed bridge for railway - Google Patents

Concrete wind shield structure of steel truss cable-stayed bridge for railway Download PDF

Info

Publication number
CN202492792U
CN202492792U CN2012201230416U CN201220123041U CN202492792U CN 202492792 U CN202492792 U CN 202492792U CN 2012201230416 U CN2012201230416 U CN 2012201230416U CN 201220123041 U CN201220123041 U CN 201220123041U CN 202492792 U CN202492792 U CN 202492792U
Authority
CN
China
Prior art keywords
concrete
verge board
steel truss
stayed bridge
wind shielding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201230416U
Other languages
Chinese (zh)
Inventor
陈列
余浪
陈建峰
许智焰
郭建勋
杨国静
袁明
杨平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South Canton Railway LLC
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN2012201230416U priority Critical patent/CN202492792U/en
Application granted granted Critical
Publication of CN202492792U publication Critical patent/CN202492792U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a concrete wind shield structure of a steel truss cable-stayed bridge for a railway and is aimed at effectively solving the problem of providing a wind screen on the steel truss cable-stayed bridge. A wind screen member is fixedly arranged between the upper outer side of an orthometric sketch plate (23) on a bridge floor and a saddle weight (20); the wind screen member is arranged on a vertical wall (21) of a sidewalk and the inner side of a web member (22); the wind screen member is composed of support members arranged at intervals and concrete wind screens (10) fixed on the support members, and the lower end of each support member is fixedly connected with the vertical wall (21) of the sidewalk.

Description

Railway Steel Truss cable stayed bridge concrete wind shielding structure
Technical field
The utility model relates to the Railway Steel Truss cable stayed bridge, particularly a kind of Railway Steel Truss cable stayed bridge concrete verge board structure.
Background technology
High speed development along with the railway cause; It is more and more that bridge is crossed over high wind districts such as valley or river; The wind speed conference exerts an influence to train operation; Train can slow down even out of service when serious, and weaken wind one of effective way of the influence of train operation is provided with verge board at the bridge windward side exactly.
At present, bridge verge board structure mainly contains following three kinds of forms.
Form one, and put formula bridge-type wind shielding structure.This wind shielding structure adopts wind shielding structure and the parallel setting of railroad bridge.Structure stress is simple, separately definite functions.Superstructure is by steel purlin formula spandrel girder and the steel plate be combined into that keeps out the wind with holes, and the side is anchored in ground with windproof cable and strengthens.
Pattern two: the paling form bridge wind shielding structure that is connected with the beam body.This wind shielding structure is located at the bridge cantilever end, is positioned at lateral rail place outside the sidewalk.Wind shielding structure is made up of the rolling fan-shaped verge board that forms of a plurality of identical steel sheets; Fan-shaped verge board road along the line direction is stood, is equidistantly arranged by root; Direction has vertical linkage on road along the line, fan-shaped verge board top, to increase the globality of wind shielding structure cooperative bearing.
Pattern three: the board-like bridge wind shielding structure that is connected with the beam body.This wind shielding structure is located at the bridge cantilever end, is positioned at the pedestrian guard rail place.Verge board is connected with column through bolt, and column is connected with beam retaining Zha Qiang.Bridge is established a side of wind shielding structure and is no longer established pedestrian guard rail, and the side walk slab places on the wind shielding structure column horizontal segment, and the side walk slab adopts the clad steel flase floor.
More than various bridge verge board structures all be used for concrete box girder, material is that the steel member constitutes, the later stage needs periodic maintenance, cost is higher.Place, Railway Steel Truss Stayed Cable Bridge dough figurine trade need be provided with saddle weight sometimes; Steel truss girder web member rod member has also occupied space, groups of people trade; The arrangement space of wind shielding structure on steel truss girder cable-stayed bridge is limited, and needs to be interrupted layout according to actual conditions, also need avoid the web member rod member.Above-mentioned verge board structure needs certain arrangement space, and for drawing logical the layout, all can't directly be used for steel purlin cable stayed bridge.
The utility model content
The utility model technical problem to be solved provides a kind of Railway Steel Truss cable stayed bridge concrete wind shielding structure, has solved the be provided with problem of verge board on the cable stayed bridge of steel purlin effectively.
It is following that the utility model solves the technical scheme that its technical problem adopted:
The Railway Steel Truss cable stayed bridge concrete wind shielding structure of the utility model; It is characterized in that: fixedly installing the verge board member between the outside, the saddle weight on the bridge floor quadrature sketch plate; The verge board member and be positioned at straight wall place, sidewalk and web member inboard; The verge board member is made up of supporting member that is provided with at interval and fixing concrete verge board on it, and each supporting member lower end is fixedly connected with the sidewalk straight wall.
The beneficial effect of the utility model is that concrete verge board and supporting member form overall structure, and are positioned on the straight wall of bridge floor sidewalk, have solved the be provided with problem of verge board on the cable stayed bridge of steel purlin effectively; Verge board adopts concrete plate, and cost is lower, helps practicing thrift construction investment.
Description of drawings
This manual comprises following four width of cloth accompanying drawings:
Fig. 1 is vertical arrangement diagram of the utility model Railway Steel Truss cable stayed bridge concrete wind shielding structure;
Fig. 2 is the layout plan of the utility model Railway Steel Truss cable stayed bridge concrete wind shielding structure;
Fig. 3 is the cross section arrangement diagram of the utility model Railway Steel Truss cable stayed bridge concrete wind shielding structure;
Fig. 4 is the vertical view of the utility model Railway Steel Truss cable stayed bridge concrete wind shielding structure;
Member shown in the figure, toponym and pairing mark: steel concrete verge board 10, column 11, buckle 12, rivet 13, bolt 14, pre-embedded bolt 15, bed plate 16, saddle weight 20, sidewalk straight wall 21, web member 22, quadrature sketch plate 23, chord member scab 24.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
See figures.1.and.2; The Railway Steel Truss cable stayed bridge concrete wind shielding structure of the utility model; Be to fixedly install the verge board member between the outside, the saddle weight 20 on the bridge floor quadrature sketch plate 23; Verge board member and be positioned at sidewalk straight wall 21 places and web member 22 inboards, the verge board member is made up of supporting member that is provided with at interval and fixing concrete verge board 10 on it, and each supporting member lower end is fixedly connected with sidewalk straight wall 21.Concrete verge board and supporting member form overall structure, and are positioned on the straight wall of bridge floor sidewalk, have solved the be provided with problem of verge board on the cable stayed bridge of steel purlin effectively; Verge board adopts concrete plate, and cost is lower, helps practicing thrift construction investment.
With reference to Fig. 1 and Fig. 3, said concrete verge board 10 and saddle weight 20 level, concrete verge board 10 is staggeredly located with chord member scab 24.In order to keep integral bridge attractive in appearance, the color of verge board member is consistent with saddle weight 20.The top of concrete verge board 10 is provided with buckle 12, and buckle 12 is fixedly connected through rivet 13 with column 11.With reference to Fig. 3, said supporting member is made up of column 11 and bed plate 16, the lower end of column 11 and bed plate 16 welding, and bed plate 16 is connected with sidewalk straight wall 21 with pre-embedded bolt 15, and column 11 forms through bolt 14 with concrete verge board 10 and removably connects.
Some principles of the above the utility model Railway Steel Truss cable stayed bridge concrete wind shielding structure that just explains through diagrams; Be not be to the utility model be confined to shown in described concrete structure and the scope of application in; So every the modify and equivalent that might be utilized all belongs to the claim that the utility model is applied for.

Claims (5)

1. Railway Steel Truss cable stayed bridge concrete wind shielding structure; It is characterized in that: upward the outside, saddle weight fixedly install the verge board member between (20) at bridge floor quadrature sketch plate (23); Verge board member and be positioned at that sidewalk straight wall (21) is located and web member (22) inboard; The verge board member is made up of supporting member that is provided with at interval and fixing concrete verge board (10) on it, and each supporting member lower end is fixedly connected with sidewalk straight wall (21).
2. Railway Steel Truss cable stayed bridge concrete wind shielding structure as claimed in claim 1 is characterized in that: said concrete verge board (10) and saddle weight (20) level, concrete verge board (10) is staggeredly located with chord member scab (24).
3. Railway Steel Truss cable stayed bridge concrete wind shielding structure as claimed in claim 2 is characterized in that: said supporting member is made up of column (11) and bed plate (16), the lower end of column (11) and bed plate (16) welding.
4. Railway Steel Truss cable stayed bridge concrete wind shielding structure as claimed in claim 3; It is characterized in that: said bed plate (16) is connected with sidewalk straight wall (21) with pre-embedded bolt (15), and column (11) forms through bolt (14) with concrete verge board (10) and removably connects.
5. like claim 3 or 4 described Railway Steel Truss cable stayed bridge concrete wind shielding structures, it is characterized in that: the top of said concrete verge board (10) is provided with buckle (12), and buckle (12) is fixedly connected through rivet (13) with column (11).
CN2012201230416U 2012-03-28 2012-03-28 Concrete wind shield structure of steel truss cable-stayed bridge for railway Expired - Lifetime CN202492792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201230416U CN202492792U (en) 2012-03-28 2012-03-28 Concrete wind shield structure of steel truss cable-stayed bridge for railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201230416U CN202492792U (en) 2012-03-28 2012-03-28 Concrete wind shield structure of steel truss cable-stayed bridge for railway

Publications (1)

Publication Number Publication Date
CN202492792U true CN202492792U (en) 2012-10-17

Family

ID=46999027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201230416U Expired - Lifetime CN202492792U (en) 2012-03-28 2012-03-28 Concrete wind shield structure of steel truss cable-stayed bridge for railway

Country Status (1)

Country Link
CN (1) CN202492792U (en)

Similar Documents

Publication Publication Date Title
CN201581344U (en) Double track railway steel truss cable-stayed bridge
CN201406629Y (en) Railway bridge windscreen
CN201411627Y (en) Steel-concrete composite tower-beam consolidation kilometer grade multi-span suspension bridge
CN103410082A (en) Double-layer bridge floor cable-stayed bridge
CN202925472U (en) Fixed truss lift for continuous steel beam assembling and pushing
CN201835220U (en) City viaduct structure
CN201722594U (en) Extradosed railway cable-stayed bridge
CN203383133U (en) Simply supported U-shaped girder for noise reduction of high-speed rail
CN206157557U (en) Hollow gate -type mound of railway bearing formula large -span prestressed concrete
CN201686943U (en) Double-layer flexible shed tunnel
CN202913336U (en) Large cantilever wide-wing box girder bridge
CN209555753U (en) The anti-fall beam construction of pier monoblock type on a kind of arch
CN202492792U (en) Concrete wind shield structure of steel truss cable-stayed bridge for railway
CN201390928Y (en) Support rail continuous beam in double track railway
CN110983945A (en) Invisible supporting structure of main beam cable-stayed bridge with double branch boxes penetrating through bridge tower
CN202181504U (en) Box girder
CN102587271A (en) Concrete wind shield structure of railway steel-trussed cable-stayed bridge
CN105256725A (en) Wide catwalk for erection of double main cables
CN211113119U (en) Temporary bridge device
CN203782547U (en) Reinforced concrete variable cross-section rectangular hollow large-frame pier
CN202451164U (en) Tunnel with opening open cut tunnel structure
CN205100083U (en) Bridge is indulged to asymmetric space cable face suspension bridge to single span
CN205557290U (en) Monolithic purlin formula annular passenger footbridge
CN217266879U (en) Gate-type pier viaduct
CN206157500U (en) Bridging apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Lie

Inventor after: Yang Guojing

Inventor after: Yuan Ming

Inventor after: Yang Ping

Inventor after: Yu Lang

Inventor after: Di Jianping

Inventor after: Chen Jianfeng

Inventor after: Xu Zhiyan

Inventor after: Guo Jianxun

Inventor after: Cao Ziyin

Inventor after: Jiang Dengwei

Inventor after: Yuan Liping

Inventor before: Chen Lie

Inventor before: Yu Lang

Inventor before: Chen Jianfeng

Inventor before: Xu Zhiyan

Inventor before: Guo Jianxun

Inventor before: Yang Guojing

Inventor before: Yuan Ming

Inventor before: Yang Ping

COR Change of bibliographic data
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160614

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 3

Patentee after: China Railway Eryuan Engineering Group Co., Ltd.

Patentee after: South Canton Railway limited liability company

Address before: 610031 Sichuan Province, Chengdu City Kam Tong Road No. 3

Patentee before: China Railway Eryuan Engineering Group Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121017