CN203782547U - Reinforced concrete variable cross-section rectangular hollow large-frame pier - Google Patents

Reinforced concrete variable cross-section rectangular hollow large-frame pier Download PDF

Info

Publication number
CN203782547U
CN203782547U CN201420159791.8U CN201420159791U CN203782547U CN 203782547 U CN203782547 U CN 203782547U CN 201420159791 U CN201420159791 U CN 201420159791U CN 203782547 U CN203782547 U CN 203782547U
Authority
CN
China
Prior art keywords
pier
pier stud
variable cross
pier column
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420159791.8U
Other languages
Chinese (zh)
Inventor
宋随弟
廖成强
陈克坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201420159791.8U priority Critical patent/CN203782547U/en
Application granted granted Critical
Publication of CN203782547U publication Critical patent/CN203782547U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a reinforced concrete variable cross-section rectangular hollow large-frame pier which helps to greatly improve overall stability and anti-seismic property of a bridge on the premise that the requirement for normal using functions is satisfied. The reinforced concrete variable cross-section rectangular hollow large-frame pier comprises a left side pier column (11a) and a right side pier column (11b) of reinforced concrete variable cross-section rectangular hollow structures. The left side pier column and the right side pier column are arranged at intervals in the transverse direction of the bridge. Lower ends of the left side pier column (11a) and the right side pier column (11b) are respectively and fixedly connected with a left side bearing platform (21a) and a right side bearing platform (21b). Energy-consuming tie beams (13) between the pier columns are arranged between upper portions of the left side pier column (11a) and the right side pier column (11b). Diaphragm plate structures (12) which are in integral structures with the energy-consuming tie beams (13) between the pier columns are correspondingly arranged in inner cavities of the left side pier column (11a) and the right side pier column (11b). An energy-consuming tie beam between the bearing platforms is arranged between the left side bearing platform (21a) and the right side bearing platform (21b) and includes two ends integrally and fixedly connected with the left side bearing platform and the right side bearing platform.

Description

Steel concrete variable cross-section rectangle hollow big frame pier
Technical field
The utility model relates to bridge, particularly a kind of steel concrete variable cross-section rectangle hollow big frame pier that is applied to the inhomogeneous Gao Dun in high intensity Zone, large span continuous rigid structure.
Background technology
In the time that earthquake occurs, as bridge construction generation heavy damage, leading to the highway in disaster area cannot resume traffic, and will bring great difficulty to the timely rescue in disaster area, therefore, and very important of the overall anti-seismic performance that improves bridge construction.
At present, the large span continuous rigid structure bridge in high intensity Zone is carried out to anti-seismic performance analysis, can be controlled preferably by viscous damper and speed lock to displacement and internal force along bridge, there is no direct effective method for the displacement of direction across bridge and the control of internal force.Adopt traditional horizontal cantilever pier, in the time that pier height is higher, at the bottom of pier, Earthquake Internal Force can be very large, causes the pier basal cross section can be very large, and bridge pier can be very dangerous and very uneconomical; Meanwhile, pier top lateral displacement can be very large, even can cause the lateral impact of left and right width bridge, and bridge security is caused to very large impact.
Therefore, provide a kind of new structure to have extremely important meaning to improving high intensity Zone continuous rigid frame bridge anti-seismic performance.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of steel concrete variable cross-section rectangle hollow big frame pier, with meeting under the prerequisite of normal usage function requirement, greatly improves integral bridge stability and anti-seismic performance.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
Steel concrete variable cross-section rectangle hollow big frame pier of the present utility model, comprise that direction across bridge interval arranges the left side pier stud, the right side pier stud that adopt steel concrete variable cross-section rectangle hollow structure, left side pier stud, pier stud lower end, right side respectively with left side cushion cap, right side cushion cap is fixed is integrated, it is characterized in that: between the top of described left side pier stud, right side pier stud, be provided with the binder that consumes energy between pier stud, in left side pier stud, right side pier stud inner chamber corresponding arrange and pier stud between the binder that consumes energy form the diaphragm structure of Construction integration; Its two ends binder that consumes energy between the fixed cushion cap being integrated is with it set between described left side cushion cap, right side cushion cap.
The beneficial effects of the utility model are, structure innovation, and reasonable stress, power transmission is clear and definite, and anti-seismic performance is good, and whole structural stability is good, and rigidity is distributed and is adapted to pier High variation to pier stiffness requirement.And can by power consumption binder adjusting improve greatly bridge Earthquake Internal Force distribute; By with known without the comparative analysis of power consumption binder bridge construction, at the bottom of the displacement of pier top and pier stressed improvement very obvious, easy construction, economical rationality, improves integral bridge stability and anti-seismic performance greatly.
Brief description of the drawings
This manual comprises following 5 width accompanying drawings:
Fig. 1 is the utility model steel concrete variable cross-section rectangle hollow big frame pier cross-sectional configuration schematic diagram;
Fig. 2 is the utility model steel concrete variable cross-section rectangle hollow big frame pier cross-sectional configuration schematic diagram;
Fig. 3 is A-A cross-sectional configuration schematic diagram in Fig. 1
Fig. 4 is B-B cross-sectional configuration schematic diagram in Fig. 1
Fig. 5 be steel concrete variable cross-section rectangle hollow big frame pier of the present invention one example along bridge to facade organigram;
Member shown in figure, toponym and corresponding mark: binder 13 consumes energy between left side pier stud 11a, right side pier stud 11b, diaphragm structure 12, pier stud; Binder 22 consumes energy between left side cushion cap 21a, right side cushion cap 21b, cushion cap; Main pier #2, main pier #3, main pier #4, main pier #5.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
With reference to Fig. 1 and Fig. 3, Fig. 4, steel concrete variable cross-section rectangle hollow big frame pier of the present utility model, comprise that direction across bridge interval arranges the left side pier stud 11a, the right side pier stud 11b that adopt steel concrete variable cross-section rectangle hollow structure, left side pier stud 11a, pier stud 11b lower end, right side respectively with left side cushion cap 21a, fixed being integrated of right side cushion cap 21b.Between the top of described left side pier stud 11a, right side pier stud 11b, be provided with the binder 13 that consumes energy between pier stud, in left side pier stud 11a, right side pier stud 11b inner chamber corresponding arrange and pier stud between the binder 13 that consumes energy form the diaphragm structure 12 of Construction integration.Its two ends binder 22 that consumes energy between the fixed cushion cap being integrated is with it set between described left side pier stud 11a, right side pier stud 11b.Left and right width bridge totally two variable cross-section rectangular hollow (left side pier stud 11a, right side pier stud 11b) by and pier stud top between the fixed formation transverse frame of binder 22 structure that consumes energy between the cushion cap that consumes energy between binder 13 and two cushion caps (left side cushion cap 21a, right side cushion cap 21b) between pier stud.Under geological process, between pier stud, consume energy and consume energy binder 22 as ductility dissipative member participation geological process between binder 13 and cushion cap.Under service load and " little shake " effect, the each position of full-bridge, in elastic stage, is not damaged.Under " shake greatly " effect, between pier stud, consume energy and consume energy binder 22 meetings prior to yield of pier formation plastic hinge between binder 13 and cushion cap, absorb seismic energy, thereby reduce the Earthquake Internal Force that bridge pier bears, ensure the safety of the main force structure of bridge pier.The power consumption binder reparation that plastic strain occurs is simple, after earthquake, can recover it by easy repair process and use function.
With reference to Fig. 2, the binder 13 that consumes energy between described pier stud, diaphragm structure 12 longitudinally arrange at interval on the top of left side pier stud 11a, right side pier stud 11b.For adaptation to the ground changes more complicated mountain area, can suitably regulate quantity, size and the spacing of between pier stud, consume energy binder 13, diaphragm structure 12, to change the lateral stiffness of steel concrete variable cross-section rectangle hollow big frame pier, thereby improve the anti-seismic performance of bridge construction entirety.
Steel concrete variable cross-section rectangle hollow big frame pier of the present invention has that anti-seismic performance is good, structure innovation, reasonable stress, power transmission is clear and definite, structural entity is stablized, the feature of easy construction.The little sand furrow bridge that it is successfully applied to Beihuan road, newly-built Lanzhou (two rings) eastern section engineering by applicant designs.With reference to Fig. 5, little sand furrow Bridge superstructure adopts (57+2 × 100+57) m Wavelike steel webplate continuous rigid frame, and this bridge basic earthquake intensity is 8 degree, and fortification against earthquakes grade is 9 degree.This bridge location is in the larger Liang Mao Gullied, loess plateau of hypsography, the high nearly 90m of main pier #4 pier, approximately 35 meters of main pier 4# and main pier #5 pier High Defferentials, genus high-intensity earthquake mountain area Long-span rigid frame bridge.Adopt tradition without the comparison of the hollow cantilever pier of power consumption binder steel concrete variable cross-section with main pier #2, main pier #3, main pier #4, main pier #5, adopting the steel concrete variable cross-section rectangle hollow main pier of big frame pier of the present invention top displacement maximum to reduce moment of flexure maximum more than 40%, at the bottom of pier reduces more than 20%, girder internal force is maximum to be reduced more than 20%, the anti-seismic performance of bridge is greatly improved, and the resistance to overturning of bridge has also obtained great increase simultaneously.
Some principles of the above the utility model steel concrete variable cross-section rectangle hollow big frame pier that just explains through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore the corresponding modify being likely utilized every and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (2)

1. steel concrete variable cross-section rectangle hollow big frame pier, comprise that direction across bridge interval arranges the left side pier stud (11a) that adopts steel concrete variable cross-section rectangle hollow structure, right side pier stud (11b), left side pier stud (11a), right side pier stud (11b) lower end respectively with left side cushion cap (21a), fixed being integrated of right side cushion cap (21b), it is characterized in that: described left side pier stud (11a), between the top of right side pier stud (11b), be provided with the binder (13) that consumes energy between pier stud, left side pier stud (11a), the binder (13) that consumes energy between corresponding setting and pier stud in right side pier stud (11b) inner chamber forms the diaphragm structure (12) of Construction integration, its two ends binder (22) that consumes energy between the fixed cushion cap being integrated is with it set between described left side cushion cap (21a), right side cushion cap (21b).
2. steel concrete variable cross-section rectangle hollow big frame pier as claimed in claim 1, is characterized in that: the binder (13) that consumes energy between described pier stud, diaphragm structure (12) longitudinally arrange at interval on the top of left side pier stud (11a), right side pier stud (11b).
CN201420159791.8U 2014-04-02 2014-04-02 Reinforced concrete variable cross-section rectangular hollow large-frame pier Expired - Fee Related CN203782547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420159791.8U CN203782547U (en) 2014-04-02 2014-04-02 Reinforced concrete variable cross-section rectangular hollow large-frame pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420159791.8U CN203782547U (en) 2014-04-02 2014-04-02 Reinforced concrete variable cross-section rectangular hollow large-frame pier

Publications (1)

Publication Number Publication Date
CN203782547U true CN203782547U (en) 2014-08-20

Family

ID=51318750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420159791.8U Expired - Fee Related CN203782547U (en) 2014-04-02 2014-04-02 Reinforced concrete variable cross-section rectangular hollow large-frame pier

Country Status (1)

Country Link
CN (1) CN203782547U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866688A (en) * 2014-04-02 2014-06-18 中铁二院工程集团有限责任公司 Reinforced concrete variable cross-section rectangular hollow large frame pier
CN106049259A (en) * 2016-06-16 2016-10-26 安徽省交通规划设计研究总院股份有限公司 Bridge integrally-assembled pier and construction method
CN113699877A (en) * 2021-10-09 2021-11-26 四川省交通勘察设计研究院有限公司 Steel-concrete composite structure pier suitable for high-intensity area and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866688A (en) * 2014-04-02 2014-06-18 中铁二院工程集团有限责任公司 Reinforced concrete variable cross-section rectangular hollow large frame pier
CN106049259A (en) * 2016-06-16 2016-10-26 安徽省交通规划设计研究总院股份有限公司 Bridge integrally-assembled pier and construction method
CN113699877A (en) * 2021-10-09 2021-11-26 四川省交通勘察设计研究院有限公司 Steel-concrete composite structure pier suitable for high-intensity area and construction method thereof

Similar Documents

Publication Publication Date Title
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN103938546B (en) Simply supported non-uniform construction method
CN204282187U (en) A kind of novel Butterfly Arch Bridge
CN203782547U (en) Reinforced concrete variable cross-section rectangular hollow large-frame pier
CN202450427U (en) Variable box variable cross-section continuous rigid frame aqueduct structure
CN107841934A (en) Spread the wings and encircle cable-stayed bridge
CN202107988U (en) Large-span prestressed concrete oblique continuous beam
CN203768785U (en) Corrugated steel web combined bridge allowing passing through on double layers
CN201835220U (en) City viaduct structure
CN103866688A (en) Reinforced concrete variable cross-section rectangular hollow large frame pier
CN103074846B (en) A kind of lateral bearing system beam bridge
CN202830954U (en) Karst area light frame roadbed pile plate structure construction
CN203625777U (en) Adjustable wheeltrack type beam transporting vehicle on beams
CN203755127U (en) Pre-stress high-performance concrete continuous box girder bridge
CN202989755U (en) Integral-casting and fabricated prestressing force bridge structure
CN205223837U (en) Y shape pier of belted steel pull rod
CN203923881U (en) The auxiliary cable stayed bridge of a kind of double tower three rope face combined cable
CN203546584U (en) Pier foundation seismic isolation structure
CN204475179U (en) Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support
CN203096591U (en) Transverse bearing system beam bridge
CN201762650U (en) Arch bridge with bridge floor having prefabricated, longitudinally-installed and blocked dual suspension cantilever beam
CN101570956B (en) Two-lane beam-bridge end reinforcement concrete frame pier in side walk
CN202482766U (en) Support structure for large span continuous beam constructions
CN205100083U (en) Bridge is indulged to asymmetric space cable face suspension bridge to single span
CN205775850U (en) A kind of for double limb over-height pier rigid frame bridge bracket back-pressure structures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Song Suidi

Inventor after: Yang Lihua

Inventor after: Deng Zhiwei

Inventor after: Feng Zhenxing

Inventor after: Zhou Xiaofu

Inventor after: Yan Wenzhong

Inventor after: Liao Chengqiang

Inventor after: Chen Kejian

Inventor after: Xu Jie

Inventor after: Xu Bin

Inventor after: Guo Lunbo

Inventor after: You Yunchuan

Inventor after: Yuan Ming

Inventor after: Wu Chunlei

Inventor before: Song Suidi

Inventor before: Liao Chengqiang

Inventor before: Chen Kejian

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM:

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820