CN202484978U - Energy-saving boiler with full combustion - Google Patents

Energy-saving boiler with full combustion Download PDF

Info

Publication number
CN202484978U
CN202484978U CN2012200894636U CN201220089463U CN202484978U CN 202484978 U CN202484978 U CN 202484978U CN 2012200894636 U CN2012200894636 U CN 2012200894636U CN 201220089463 U CN201220089463 U CN 201220089463U CN 202484978 U CN202484978 U CN 202484978U
Authority
CN
China
Prior art keywords
combustion chamber
coal
energy
heater
combustion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200894636U
Other languages
Chinese (zh)
Inventor
张建勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WEIFANG CHUANGGAO INFORMATION TECHNOLOGY CO LTD
Original Assignee
WEIFANG CHUANGGAO INFORMATION TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIFANG CHUANGGAO INFORMATION TECHNOLOGY CO LTD filed Critical WEIFANG CHUANGGAO INFORMATION TECHNOLOGY CO LTD
Priority to CN2012200894636U priority Critical patent/CN202484978U/en
Application granted granted Critical
Publication of CN202484978U publication Critical patent/CN202484978U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model discloses an energy-saving boiler with full combustion. The energy-saving boiler comprises a furnace body, wherein a combustion chamber is arranged in the furnace body, a coal adding port connected with the combustion chamber is arranged on the furnace body, a cinder box is arranged below the combustion chamber in the furnace body, the cinder box is provided with a deashing port of the cinder box, which extends out of the furnace body, the furnace body is provided with a smoke and fire channel connected with the upper part of the combustion chamber, and a plurality of layers of grates are arranged below the coal adding port in the combustion chamber. The plurality of the layers of the grates are arranged at the bottom of the combustion chamber, coal is divided into a plurality of layers through the plurality of the layers of the grates, the coal can be prevented from being accumulated too thickly in the combustion chamber, the air circulation in the combustion chamber is also ensured, and the full combustion of the coal in each layer is promoted; and the energy-saving boiler disclosed by the utility model can prevent the coal from being accumulated too thickly, promote the full combustion of the coal, produce more heat, simultaneously avoid the waste of energy and save the energy.

Description

The power economized boiler of sufficient combustion
Technical field
The utility model relates to a kind of heating equipment, relates in particular to a kind of power economized boiler.
Background technology
Heat energy or other heat energy that boiler utilizes fuel combustion to discharge add hot water or other working medium, are widely used in people's the life, commercial production, plant generator, aquaculture, and it heats up slow and is easy to keep temperature.But its fuel combustion is not thorough, wastes energy, and has improved production cost, how to reduce cost, and improves fuel economy and becomes people's urgent problem.
The utility model content
The utility model technical problem to be solved provides a kind of coal that prevents and piles up blocked uply, promotes that coal fully burns the power economized boiler of the sufficient combustion of energy savings.
For solving the problems of the technologies described above, the technical scheme of the utility model is: the power economized boiler of sufficient combustion comprises body of heater; Be provided with the combustion chamber in the said body of heater; Said body of heater is provided with the coal filling hole that connects said combustion chamber, is positioned at below, said combustion chamber in the said body of heater and is provided with ash bin, and said ash bin is provided with and stretches out the outside ash bin cleaning door of said body of heater; Said body of heater is provided with the fireworks channel that connects top, said combustion chamber, is positioned at said coal filling hole below in the said combustion chamber and is provided with the several layers fire bars.
As optimized technical scheme, the layer of each layer fire bars between from top to bottom is apart from dwindling gradually.
As optimized technical scheme, the spacing between the fire bars of each layer fire bars is dwindled gradually from top to bottom.
Owing to adopted technique scheme, the power economized boiler of sufficient combustion comprises body of heater; Be provided with the combustion chamber in the said body of heater; Said body of heater is provided with the coal filling hole that connects said combustion chamber, is positioned at below, said combustion chamber in the said body of heater and is provided with ash bin, and said ash bin is provided with and stretches out the outside ash bin cleaning door of said body of heater; Said body of heater is provided with the fireworks channel that connects top, said combustion chamber, is positioned at said coal filling hole below in the said combustion chamber and is provided with the several layers fire bars; Coal is internal combustion in said combustion chamber, and the pyrotechnics that produces high temperature is up along said fireworks channel, in subsequent process, carries out heat exchange; Bottom, said combustion chamber is provided with the several layers fire bars, and said several layers fire bars is divided into several layers with coal, prevents that coal from piling up blocked up in said combustion chamber; Air gets into from bottom, said combustion chamber and flows from the bottom to top, after said several layers fire bars is divided into several layers with coal, also guarantees said combustion chamber inner air flow; Promote each layer coal fully to burn; Produce more heat, avoid the waste of the energy, practiced thrift the energy; The utility model prevents that the coal accumulation is blocked up, promotes that coal fully burns, and avoids the waste of the energy when producing more heat, has practiced thrift the energy.
Description of drawings
Accompanying drawing is the structural representation of the utility model embodiment.
Among the figure: the 1-body of heater; The 2-combustion chamber; The 3-coal filling hole; The 4-ash bin; 5-ash bin cleaning door; The 6-fireworks channel; The 7-fire bars; 8-coal.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment, further set forth the utility model.In the detailed description below, some example embodiment of the utility model has only been described through the mode of explanation.Undoubtedly, those of ordinary skill in the art can recognize, under the situation of spirit that does not depart from the utility model and scope, can revise described embodiment with various mode.Therefore, accompanying drawing is illustrative with being described in essence, rather than is used to limit the protection domain of claim.
Shown in accompanying drawing, the power economized boiler of sufficient combustion comprises body of heater 1; Be provided with combustion chamber 2 in the said body of heater 1; Said body of heater 1 is provided with the coal filling hole 3 that connects said combustion chamber 2, is positioned at 2 belows, said combustion chamber in the said body of heater 1 and is provided with ash bin 4, and said ash bin 4 is provided with the ash bin cleaning door 5 that stretches out said body of heater 1 outside; Said body of heater 1 is provided with the fireworks channel 6 that connects 2 tops, said combustion chamber, is positioned at said coal filling hole 3 belows in the said combustion chamber 2 and is provided with several layers fire bars 7.Coal 8 is 2 internal combustion in said combustion chamber, and the pyrotechnics that produces high temperature is up along said fireworks channel 6, in subsequent process, carries out heat exchange; 2 bottoms, said combustion chamber are provided with fire bars 7, and said fire bars 7 is divided into several layers with coal, prevent that coal 8 from piling up blocked up in said combustion chamber 2; Air gets into from 2 bottoms, said combustion chamber and flows from bottom to top, after said fire bars 7 is divided into several layers with coal 8, also guarantees said combustion chamber 2 inner air flows; Promote each layer coal 8 fully to burn; Produce more heat, avoid the waste of the energy, practiced thrift the energy.
The layer of each layer fire bars 7 between from top to bottom is apart from dwindling gradually; This helps coal and the abundant catalytic combustion of air, and for the coal on top provides the heat of burning, and top 7 layers of distance of said fire bars are bigger; Guarantee circulation of air, guarantee that said combustion chamber 2 internal upper part coals 8 burn.And the spacing between the fire bars 7 in each layer fire bars is dwindled gradually from top to bottom, is convenient to collect the coal fuel that the upper strata unburned is abundant and volume diminishes and continues further burning after burning.
More than show and described the advantage of basic principle, principal character and the utility model of the utility model.The technical staff of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the specification that the utility model just is described; Under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, and these variations and improvement all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (3)

1. the power economized boiler of sufficient combustion; Comprise body of heater, be provided with the combustion chamber in the said body of heater, said body of heater is provided with the coal filling hole that connects said combustion chamber; Be positioned at below, said combustion chamber in the said body of heater and be provided with ash bin; Said ash bin is provided with and stretches out the outer ash bin cleaning door of said body of heater, and said body of heater is provided with the fireworks channel that connects top, said combustion chamber, it is characterized in that: be positioned at said coal filling hole below in the said combustion chamber and be provided with the several layers fire bars.
2. the power economized boiler of sufficient combustion as claimed in claim 1 is characterized in that: the layer of each layer fire bars between from top to bottom is apart from dwindling gradually.
3. the power economized boiler of sufficient combustion as claimed in claim 1 is characterized in that: the spacing between the fire bars in each layer fire bars is dwindled gradually from top to bottom.
CN2012200894636U 2012-03-03 2012-03-03 Energy-saving boiler with full combustion Expired - Fee Related CN202484978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200894636U CN202484978U (en) 2012-03-03 2012-03-03 Energy-saving boiler with full combustion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200894636U CN202484978U (en) 2012-03-03 2012-03-03 Energy-saving boiler with full combustion

Publications (1)

Publication Number Publication Date
CN202484978U true CN202484978U (en) 2012-10-10

Family

ID=46959397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200894636U Expired - Fee Related CN202484978U (en) 2012-03-03 2012-03-03 Energy-saving boiler with full combustion

Country Status (1)

Country Link
CN (1) CN202484978U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110319579A (en) * 2019-07-06 2019-10-11 张辰星 A kind of Industrial Boiler

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110319579A (en) * 2019-07-06 2019-10-11 张辰星 A kind of Industrial Boiler
CN110319579B (en) * 2019-07-06 2021-07-30 嘉兴祥盛汽车配件制造有限公司 Industrial boiler

Similar Documents

Publication Publication Date Title
CN104344412B (en) Cinder breaking device for biomass boiler
CN203489470U (en) Novel energy-saving and environment-friendly biomass boiler
CN104654285A (en) Biomass combustion boiler
CN204345720U (en) A kind of biomass cooking heating stove
CN102620274A (en) Horizontal oil-fired and gas-fired efficient energy-saving boiler
CN103471103A (en) Furnace for combined combustion of methane of garbage leachate and garbage
CN203082943U (en) Fuel-efficient stove
CN202484978U (en) Energy-saving boiler with full combustion
CN201401807Y (en) Special furnace arch for biomass combustion
CN204100300U (en) Energy-saving and efficient return air furnace
CN203240619U (en) Novel multi-purpose coal and firewood heating furnace
CN203549917U (en) Secondary-combustion efficient energy-saving environment-friendly coal-fired furnace
CN104848262A (en) Return air furnace capable of recycling waste heat
CN204757012U (en) Waste heat recovery's return air stove can carry out
CN205316334U (en) Waste gasification heat accumulation burner
CN201072231Y (en) Boiler especially for biomass fuel
CN203928381U (en) A kind of water heater
CN204342744U (en) Biomass gasifying furnace
CN202229394U (en) Energy-saving emission-reducing fire tube boiler with stock bin
CN206787041U (en) A kind of coal-fired coal-gasified hot-water boiler
CN101539304B (en) Biomass combustion special furnace
CN110319458A (en) A kind of two-stage type biomass furnace
CN201096402Y (en) Entirety reverse burning energy-saving environment-friendly boiler with water pipe
CN204285473U (en) A kind of refuse burner
CN203478257U (en) Garbage leachate methane and garbage blend combustion boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Weifang Zhongxu Polymer Material Co.,Ltd.

Assignor: Weifang Chuanggao Information Technology Co.,Ltd.

Contract record no.: 2013370000107

Denomination of utility model: Energy-saving boiler with full combustion

Granted publication date: 20121010

License type: Exclusive License

Record date: 20130507

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
DD01 Delivery of document by public notice

Addressee: Weifang Chuanggao Information Technology Co.,Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Weifang Chuanggao Information Technology Co.,Ltd.

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121010

Termination date: 20140303

EXPY Termination of patent right or utility model