CN202474239U - 接地线线夹 - Google Patents

接地线线夹 Download PDF

Info

Publication number
CN202474239U
CN202474239U CN2012200946255U CN201220094625U CN202474239U CN 202474239 U CN202474239 U CN 202474239U CN 2012200946255 U CN2012200946255 U CN 2012200946255U CN 201220094625 U CN201220094625 U CN 201220094625U CN 202474239 U CN202474239 U CN 202474239U
Authority
CN
China
Prior art keywords
screw
tension disc
following
last
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200946255U
Other languages
English (en)
Inventor
吕守旭
马莉
朱大勇
李强
程显泉
李正刚
江腾
梁波
郭光成
刘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN2012200946255U priority Critical patent/CN202474239U/zh
Application granted granted Critical
Publication of CN202474239U publication Critical patent/CN202474239U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

一种变电站内母排和线缆通用的压线牢靠,拆装快捷方便的接地线线夹,包括导轨,导轨的下端部开有接地线孔,导轨的下部的一侧设计有下压线板,下压线板上设计有开口向上的下压线槽,下压线板上还开有下螺孔,下压线板的上方设计有上压线板,上压线板上开有开口向下的上压线槽,上压线板上还开有上螺孔,上压线板的右端向右开有导向槽,导向槽与导轨相配合,上压线槽与下压线槽相对应,上螺孔与下螺孔相对应,上螺孔与下螺孔内螺纹连接有传动操作杆,传动操作杆的下端开有操作孔。

Description

接地线线夹
技术领域
本实用新型涉及一种线夹,尤其涉及一种接地线线夹。
背景技术
目前使用的接地线线夹,是根据高压母线的母排和线缆的不同,分别选择用平口接地线夹或者是线路接地线夹,在变电站内使用时,平口接地线夹和线路接地线夹在矩形导体和圆形导体上不能通用,线夹压接不牢固,并且在检修工作时接地线线夹易脱落。
发明内容
本实用新型的目的是提供一种变电站内母排和线缆通用的压线牢靠,拆装快捷方便的接地线线夹。
为实现上述目的,本实用新型采用的技术方案为:一种接地线线夹,包括导轨,导轨的下端部开有接地线孔,其特征在于:导轨的下部的一侧设计有下压线板,下压线板上设计有开口向上的下压线槽,下压线板上还开有下螺孔,下压线板的上方设计有上压线板,上压线板上开有开口向下的上压线槽,上压线板上还开有上螺孔,上压线板的右端向右开有导向槽,导向槽与导轨相配合,上压线槽与下压线槽相对应,上螺孔与下螺孔相对应,上螺孔与下螺孔内螺纹连接有传动操作杆,传动操作杆的下端开有操作孔。
此结构中,传动操作杆包括螺杆本体,螺杆本体的下部设计有右旋螺纹,螺杆本体的上部设计有左旋螺纹,右旋螺纹与下螺孔相配合,左旋螺纹与上螺孔相配合。
本实用新型的优点效果在于:由于本实用新型中采用了带左旋螺纹和右旋螺纹的螺杆,所以使用本实用新型时,上压线板和下压线板压紧,提高了工作效率,压接牢靠,接触可靠,不易脱落,使用效果好。
附图说明
图1为本实用新型的结构示意图。
附图中:1、上压线板;  2、上压线槽;  3、左旋螺纹;  4、上螺孔;  5、导向槽;  6、右旋螺纹;  7、导轨;  8、接地线孔;  9、传动操作杆;  10、操作孔;  11、下螺孔;  12、下压线槽;  13、下压线板。
具体实施方式
下面结合附图和具体实施例对本实用新型作进一步说明:
本实用新型如图1所示,一种接地线线夹,包括导轨7,导轨7的下端部开有接地线孔8,其特征在于:导轨7的下部的一侧设计有下压线板13,下压线板13上设计有开口向上的下压线槽12,下压线板13上还开有下螺孔11,下压线板13的上方设计有上压线板1,上压线板1上开有开口向下的上压线槽2,上压线板1上还开有上螺孔4,上压线板1的右端向右开有导向槽5,导向槽5与导轨7相配合,上压线槽2与下压线槽12相对应,上螺孔4与下螺孔11相对应,上螺孔4与下螺孔11内螺纹连接有传动操作杆9,传动操作杆9的下端开有操作孔10。
在本实施例中,传动操作杆9包括螺杆本体,螺杆本体的下部设计有右旋螺纹6,螺杆本体的上部设计有左旋螺纹3,右旋螺纹6与下螺孔11相配合,左旋螺纹3与上螺孔4相配合。
安装接地线操作时,用绝缘操作杆顺时针旋转接地线线夹的传动操作杆,上压线板向下运动,下压线板向上运动,这样上压线板和下压线板将母排或电缆夹紧;拆除接地线的操作时,逆时针旋转绝缘操作杆,松开上压线板和下压线板即可。

Claims (2)

1.一种接地线线夹,包括导轨(7),导轨(7)的下端部开有接地线孔(8),其特征在于:导轨(7)的下部的一侧设计有下压线板(13),下压线板(13)上设计有开口向上的下压线槽(12),下压线板(13)上还开有下螺孔(11),下压线板(13)的上方设计有上压线板(1),上压线板(1)上开有开口向下的上压线槽(2),上压线板(1)上还开有上螺孔(4),上压线板(1)的右端向右开有导向槽(5),导向槽(5)与导轨(7)相配合,上压线槽(2)与下压线槽(12)相对应,上螺孔(4)与下螺孔(11)相对应,上螺孔(4)与下螺孔(11)内螺纹连接有传动操作杆(9),传动操作杆(9)的下端开有操作孔(10)。
2.根据权利要求1所述的接地线线夹,其特征在于:所述传动操作杆(9)包括螺杆本体,螺杆本体的下部设计有右旋螺纹(6),螺杆本体的上部设计有左旋螺纹(3),右旋螺纹(6)与下螺孔(11)相配合,左旋螺纹(3)与上螺孔(4)相配合。
CN2012200946255U 2012-03-14 2012-03-14 接地线线夹 Expired - Fee Related CN202474239U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200946255U CN202474239U (zh) 2012-03-14 2012-03-14 接地线线夹

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200946255U CN202474239U (zh) 2012-03-14 2012-03-14 接地线线夹

Publications (1)

Publication Number Publication Date
CN202474239U true CN202474239U (zh) 2012-10-03

Family

ID=46922372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200946255U Expired - Fee Related CN202474239U (zh) 2012-03-14 2012-03-14 接地线线夹

Country Status (1)

Country Link
CN (1) CN202474239U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593614A (zh) * 2012-03-14 2012-07-18 山东电力集团公司枣庄供电公司 接地线线夹
CN103066526A (zh) * 2012-12-07 2013-04-24 河南省电力公司洛阳供电公司 一种用于高压输电线路的接地线方法及隔离式接地工具
CN108923138A (zh) * 2018-06-29 2018-11-30 郑成翔 一种建筑机械临时用电接地装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593614A (zh) * 2012-03-14 2012-07-18 山东电力集团公司枣庄供电公司 接地线线夹
CN103066526A (zh) * 2012-12-07 2013-04-24 河南省电力公司洛阳供电公司 一种用于高压输电线路的接地线方法及隔离式接地工具
CN103066526B (zh) * 2012-12-07 2017-11-14 河南省电力公司洛阳供电公司 一种用于高压输电线路的接地线方法及隔离式接地工具
CN108923138A (zh) * 2018-06-29 2018-11-30 郑成翔 一种建筑机械临时用电接地装置

Similar Documents

Publication Publication Date Title
CN102593614A (zh) 接地线线夹
CN203326127U (zh) 一种间距可调的接地线线夹
CN204030029U (zh) 变压器接地保护装置
CN203774485U (zh) 一种防脱型接地线夹
CN202474239U (zh) 接地线线夹
CN203535077U (zh) 断路器端子线夹
CN206098763U (zh) 便携式快装短路接地线组
CN102610937A (zh) 可调式接地线线夹
CN203480956U (zh) 防雷支柱绝缘子
CN209016298U (zh) 弹拉式接地线挂接头
CN203367502U (zh) 电线接地装置
CN205178024U (zh) 一种导线快速连接器
CN203607727U (zh) 变电站接地装置
CN201853817U (zh) 配电设备线夹
CN201126862Y (zh) 新型自紧式接线端子
CN202651398U (zh) 主变压器出线母排专用接地线
CN202474240U (zh) 设备线夹
CN203232974U (zh) 一种低压接地线的接地体互换装置
CN102593617B (zh) 设备线夹
CN202217556U (zh) 针式绝缘子
CN206947228U (zh) 一种高压开关柜接地刀闸组合操作杆
CN104659695A (zh) 变电站接地装置
CN203192612U (zh) 防爆开关接线柱
CN203660091U (zh) 一种架空输电线路在停电时维修用接地线装置
CN204012364U (zh) 多功能带电防腐注射器

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130802

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 277100 ZAOZHUANG, SHANDONG PROVINCE TO: 277000 ZAOZHUANG, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130802

Address after: 277000 the Yellow River Road, Xuecheng District, Shandong, No. 999, No.

Patentee after: Tai'an Power Supply Co., Ltd. of Shandong Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 277100 Zaozhuang power supply company, No. 60 Guangming Middle Road, Shizhong District, Zaozhuang, Shandong

Patentee before: Tai'an Power Supply Co., Ltd. of Shandong Electric Power Corporation

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20160314

CF01 Termination of patent right due to non-payment of annual fee