CN202466912U - Assembly box - Google Patents

Assembly box Download PDF

Info

Publication number
CN202466912U
CN202466912U CN2012200521607U CN201220052160U CN202466912U CN 202466912 U CN202466912 U CN 202466912U CN 2012200521607 U CN2012200521607 U CN 2012200521607U CN 201220052160 U CN201220052160 U CN 201220052160U CN 202466912 U CN202466912 U CN 202466912U
Authority
CN
China
Prior art keywords
box
top box
end box
assembling case
spigot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200521607U
Other languages
Chinese (zh)
Inventor
魏永峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012200521607U priority Critical patent/CN202466912U/en
Application granted granted Critical
Publication of CN202466912U publication Critical patent/CN202466912U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to an assembly box, which comprises a top box and a bottom box, wherein a side frame plate is arranged between the top box and the bottom box, a plurality of stress bars are respectively arranged on the top box and the bottom box, embedding and fixing teeth are arranged on the outer side walls of the top box and the bottom box, and the inner walls of the embedding and fixing teeth are in an circular arc shape. The circular arc-shaped embedding and fixing teeth can be completely anastomotic with bar beams, the contact area is increased, the assembly box can be stably arranged among steel bars, and the stability of the assembly box is improved; and a top box handle groove and a bottom box handle groove can be conveniently and mechanically hoisted, the installing speed is accelerated, and the construction efficiency is improved.

Description

The assembling case
Technical field
The utility model relates to a kind of building construction material, definite a kind of assembling case of saying so.
Background technology
The assembling case is a kind of hollow building cover commonly used in the construction work.Advantages such as rely on saving material, alleviate stair weight, good warmth retention effect, soundproof effect are good is extensively applied in the buildings such as office building, garage, overpass bridge.At present, more reliable for the girt strip connection that makes each assembling case in work progress, often on assembling case lateral wall, many prismatics build-in tooth is set.But contact area is limited between many prismatics build-in tooth and the girt strip, causes assembling the case less stable.In addition, assembling case profile is comparatively smooth, is not easy to lifting machine during installation, adopts a dead lift more, and installation process is slow, and efficient is low excessively.
The utility model content
The purpose of the utility model provides a kind of assembling case, can be stably fixed between the girt strip, and can realize the lifting installation.
The utility model is realized through following technical scheme for realizing above-mentioned purpose: the assembling case comprises top box and end box; Between top box and the end box side frame plate is set; On top box and the end box several principal rods are set all, on top box and the end box lateral wall build-in tooth are set, described build-in tooth inwall is a circular arc.
In order further to realize the purpose of the utility model, can also adopt following technical scheme: the top of described top box is dug and is established several top box handle slots, forms the top box handle on the top box; The top of box of the described end is dug and is established several end box handle slots, forms end box handle on the end box.The end face of described top box digs establishes several staggered top box muscle grooves; The bottom surface of box of the described end is dug and is established several staggered end box muscle grooves.On the shown top box lower frame top box bell and spigot is set, end box bell and spigot is set on the end box upper ledge, on the upper and lower frame of side frame plate groove is set, top box bell and spigot and end box bell and spigot respectively with the upper and lower frame of side frame plate on groove match.The slab-thickness of described top box is 4~8cm, and the slab-thickness of end box is 4~16cm.
The advantage of the utility model is: circular arc build-in tooth can fit like a glove with girt strip, increases contact area, and the assembling case can be stablized and is installed between the reinforcing bar, improves the stability of assembling case; Top box handle slot and end box handle slot can make things convenient for mechanical hoisting, accelerate installation rate, improve efficiency of construction.The utility model also has compactness simple for structure, advantage cheap for manufacturing cost and easy to use.
Description of drawings
Fig. 1 is the utility model structural representation; Fig. 2 is the left view of Fig. 1.
Reference numeral: 1 top box, 2 end box, 3 side frame plates, 4 build-in teeth, 5 principal rods, 6 top box muscle grooves, 7 top box handles, 8 end box handle, 9 grooves, 10 top box bell and spigots, 11 end box bell and spigot, 12 top box handle slots, 13 end box handle slot, 14 end box muscle groove.
The specific embodiment
The assembling case, as shown in Figure 1, comprise top box 1 and end box 2, between top box 1 and the end box 2 side frame plate 3 is set, on top box 1 and the end box 2 several principal rods 5 are set all, on top box 1 and end box 2 lateral walls build-in tooth 4 is set, described build-in tooth 4 inwalls are circular arc.Circular arc build-in tooth 4 fits like a glove with the profile of girt strip, and is maximum with the girt strip contact area, can guarantee to assemble firm being installed on the girt strip of case, improves the stability of assembling case.In order further to reinforce the assembling case after installing, as depicted in figs. 1 and 2, the end face of described top box 1 digs establishes several staggered top box muscle grooves 6; The bottom surface of box of the described end 2 is dug and is established several staggered end box muscle grooves 14.Connect with row or with passing through reinforcing bar between the assembling case that lists, reinforcing bar is placed on top box muscle groove 6 or end box muscle groove 14.Through the later stage placing of concrete, reinforcing bar and assembling case are consisted of one.
For the ease of mechanical hoisting, as depicted in figs. 1 and 2, the top of described top box 1 is dug and is established several top box handle slots 12, forms top box handle 7 on the top box 1; The top of box of the described end 2 is dug and is established several end box handle slots 13, forms end box handle 8 on the end box 2.Top box handle 7 preferred amounts are 4, arrange according to rectangular array; The quantity of end box handle 8 and top box handle 7 with arrange identical.Hook insertion top box handle slot 12 through lifting machine can be sling top box 1, manual work is installed become mechanization, saves manpower, accelerates installation rate, increases work efficiency.Box 2 installation processes in the end are identical with top box 1.
For the ease of the installation between top box 1, side frame plate 3 and the end box 2; As shown in Figure 2; On shown top box 1 lower frame top box bell and spigot 10 is set; End box bell and spigot 11 is set on end box 2 upper ledges, on the side frame plate 3 upper and lower frames groove 9 is set, top box bell and spigot 10 and end box bell and spigot 11 respectively with side frame plate 3 upper and lower frames on groove 9 match.Connect more firmly between top box 1, side frame plate 3 and the end box 2, stability is higher.
The slab-thickness of described top box 1 is d, and the slab-thickness of end box 2 is D.Require differently according to superstructure, can select the assembling case of different slab-thicknesses with the position.For example, when the assembling case was installed around the dark beam that intermediolateral column is arranged, because the pressure that receives of end box 2 is bigger, end box 2 adopted thick base plate, the assembling case of optional d=4cm, D=8cm; When some assemble casees more greatly to volume, can also select the assembling case of d=6cm, D=12cm or d=8cm, D=16cm.The pulling force that box 2 receives at the bottom of the assembling case of middle part is bigger, and end box 2 adopts thin base plate, the assembling case of optional d=4cm, D=8cm; When some assemble casees more greatly to volume, can also select the assembling case of d=6cm, D=6cm or d=8cm, D=8cm.
The technical scheme of the utility model is not restricted in the scope of the described embodiment of the utility model.The utility model not technology contents of detailed description is known technology.

Claims (5)

1. assembling case; Comprise top box (1) and end box (2); Between top box (1) and the end box (2) side frame plate (3) is set; On top box (1) and the end box (2) several principal rods (5) are set all, on top box (1) and end box (2) lateral wall build-in tooth (4) are set, it is characterized in that: described build-in tooth (4) inwall is a circular arc.
2. assembling case according to claim 1 is characterized in that: the top of described top box (1) is dug and is established several top box handle slots (12), and top box (1) is gone up and formed top box handle (7); The top of box of the described end (2) is dug and is established several end box handle slots (13), and end box (forms end box handle (8) on 2.
3. assembling case according to claim 1 is characterized in that: the end face of described top box (1) digs establishes several staggered top box muscle grooves (6); The bottom surface of box of the described end (2) is dug and is established several staggered end box muscle grooves (14).
4. assembling case according to claim 1; It is characterized in that: shown in top box (1) lower frame on top box bell and spigot (10) is set; On end box (2) upper ledge end box bell and spigot (11) is set; On the upper and lower frame of side frame plate (3) groove (9) is set, top box bell and spigot (10) and end box bell and spigot (11) respectively with the upper and lower frame of side frame plate (3) on groove (9) match.
5. assembling case according to claim 1 is characterized in that: the slab-thickness of described top box (1) is 4~8cm, and the slab-thickness of end box (2) is 4~16cm.
CN2012200521607U 2012-02-17 2012-02-17 Assembly box Expired - Fee Related CN202466912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200521607U CN202466912U (en) 2012-02-17 2012-02-17 Assembly box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200521607U CN202466912U (en) 2012-02-17 2012-02-17 Assembly box

Publications (1)

Publication Number Publication Date
CN202466912U true CN202466912U (en) 2012-10-03

Family

ID=46915079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200521607U Expired - Fee Related CN202466912U (en) 2012-02-17 2012-02-17 Assembly box

Country Status (1)

Country Link
CN (1) CN202466912U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074295A (en) * 2013-03-27 2014-10-01 杨玉杰 Reinforced concrete assembling box and manufacturing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074295A (en) * 2013-03-27 2014-10-01 杨玉杰 Reinforced concrete assembling box and manufacturing method

Similar Documents

Publication Publication Date Title
CN104631706A (en) Form-removal-free concrete column and constructing method thereof
CN201738443U (en) Prefabricated concrete double-overlapping beam
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN101906875A (en) Hollow slab template for buildings
CN202466912U (en) Assembly box
CN103397721A (en) Steel plate prefabricated concrete double-plate shear wall
CN109779290A (en) A kind of dismounting brick masonry wall piece prestressed anchor clamping method
CN108374507A (en) Assembled straight section vertically splices frivolous template
CN201771112U (en) Multipurpose reinforcement mat frame
CN211524012U (en) Cantilever scaffold support beam prefabricated mounting member
CN201850763U (en) Hollow floor slab template for construction
CN102251673B (en) Construction method for reinforced concrete hollow floor
CN210316560U (en) Guide wall template supporting structure convenient to build
CN101864819A (en) Reinforced concrete hollow floor slab and construction method
CN203320922U (en) Supporting device for forming of elevator shaft template
CN202767328U (en) Honeycomb core box
CN101871240A (en) Reinforced concrete hollow floorslab and construction method
CN206769153U (en) Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure
CN110980549A (en) Tower crane inner climbing machine and mounting method thereof
CN218493284U (en) Assembled precast concrete enclosure
CN218879150U (en) Steel reinforcement cage hoist of handling case roof beam
CN102635181A (en) Prefabricated ribbed bottom plate superposed wall
CN211871228U (en) Tower crane inner climbing machine
CN212104633U (en) Concrete prefabricated part for building convenient to dismouting
CN201865338U (en) Cement casting template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20150217

EXPY Termination of patent right or utility model