CN202466408U - Construction hanging basket for municipal engineering and house building - Google Patents
Construction hanging basket for municipal engineering and house building Download PDFInfo
- Publication number
- CN202466408U CN202466408U CN2012200034907U CN201220003490U CN202466408U CN 202466408 U CN202466408 U CN 202466408U CN 2012200034907 U CN2012200034907 U CN 2012200034907U CN 201220003490 U CN201220003490 U CN 201220003490U CN 202466408 U CN202466408 U CN 202466408U
- Authority
- CN
- China
- Prior art keywords
- load
- bearing
- hanging basket
- municipal engineering
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a construction hanging basket for municipal engineering and house building, aiming at complex structures of a mechanical hanging basket, time and labor wastes of the mobile installation and the limit to meet the demand of working aloft. The construction hanging basket for the municipal engineering and the house building comprises five parts of a load-bearing pothook, a load-bearing frame, a protective guard, a load-bearing bottom plate and a load-bearing support. The construction hanging basket is simple in structure and convenient and quick to operate.
Description
Technical field
The utility model relates to high-altitude, a kind of Bridge guardrail outside construction equipment, relates in particular to be used for the construction Hanging Basket that municipal engineering and room are built.
Background technology
Municipal engineering are meant the urban operating mechanism construction project.Urban operating mechanism is meant in metropolitan district, town (township) planning construction scope and is provided with, the various buildings, structure, equipment etc. of paid or free public product and service are provided for the resident based on government responsibility and obligation.Municipal engineering generally are the infrastructures that belongs to country, are meant that the infrastructure constructions such as various public transit facilities, feedwater, draining, combustion gas, urban flood defence, sanitation of environment and illumination in the urban construction are the requisite material bases of city survival and development.It is the primary condition of uplifting the people's living standard and opening to the outside world.Building construction is meant and comprises residential building, industrial premises, business premises, office premises and other single purpose buildings by buildings such as on the soil of accomplishing infrastructure construction, building the house.
Municipal engineering and building construction engineering construction scene exist a large amount of high-altitudes that upkeep operation is installed; In order to guarantee safety work, generally need to use mechanical hanging basket, because mechanical barrel structure is complicated; Mobile installation is wasted time and energy, and can't use because of the field condition restriction sometimes.
The utility model content
To the deficiency of prior art, the utility model provides a kind of construction Hanging Basket that municipal engineering and room are built that is used for, and the construction cradle structure of the utility model is simple, easy to operate, quick.The construction Hanging Basket that the utility model a kind of is used for municipal engineering and room building supports five parts by load-bearing hook, load-bearing frame, protective guard, bearing soleplate and load-bearing to be formed, and load-bearing hangs on the protective guard, the load-bearing frame with support base plate and directly ride on the protective guard.Said self-control cradle structure is simple, convenient to operation, and the safety and stablization that guarantee Hanging Basket are supported in load-bearing hook, load-bearing frame and load-bearing, be difficult for vibrating and rocking, and be a kind of safe and reliable operating platform.
Further preferably, described load-bearing hook, load-bearing frame, and load-bearing support and select 50mm * 50mm stainless steel square tube for use, protective guard and bearing soleplate are selected 40mm * 40mm stainless steel square tube for use.
In a word, the utility model a kind of is used for the construction Hanging Basket that municipal engineering and room are built, and operation saves time, province's expense and conveniently moving, and is safe in utilization, alleviated labor strength greatly, improves construction progress, lowered construction cost.
Description of drawings
To be that the utility model is a kind of be used for the construction Hanging Basket elevation that municipal engineering and room are built to Fig. 1.
To be that the utility model is a kind of be used for the construction Hanging Basket vertical view that municipal engineering and room are built to Fig. 2
Fig. 3 is Figure 1A-A sectional drawing
In Fig. 1,2,3,1. for load-bearing hook, 2. for the load-bearing frame, 3. be protective guard, 4. for bearing soleplate, 5. be the load-bearing support.
The specific embodiment
Below in conjunction with accompanying drawing, further describe the utility model through specific embodiment, but the utility model is not limited only to following examples.In the scope of the utility model or in the content that does not break away from the utility model, spirit and scope; To the described a kind of construction Hanging Basket that is used for municipal engineering and room building of the utility model be carried out to reduced scale or expansion, suitably improve, the structure of replacement building block and/or the annexation between the building block; Will become apparent to those skilled in the art that they all are regarded as is included within the utility model scope.
Present embodiment provides a kind of construction Hanging Basket that is used for municipal engineering and room building (See Figure 1: elevation, Fig. 2: vertical view and Fig. 3: the A-A sectional drawing) by the load-bearing hook 1., the load-bearing frame 2., protective guard 3., 4. bearing soleplate reach load-bearing and support 5. five parts and form.1. the load-bearing hook hangs over protective guard and 3. goes up, and 4. 2. the load-bearing frame directly ride in protective guard with the support base plate and 3. go up.This cradle structure is simple, and the operator stands in the interior easy construction of Hanging Basket and can move, and two people can accomplish.
In the present embodiment, load-bearing hook 1., the load-bearing frame 2., and load-bearing support and 5. adopt 50 * 50 stainless steel square tubes, 3. protective guard reaches bearing soleplate and 4. adopts 40 * 40 stainless steel square tubes.
That uses present embodiment a kind ofly is used for the construction Hanging Basket that municipal engineering and room are built, and operation saves time, province's expense and conveniently moving, and is safe in utilization, need not machinery and marches into the arena, and alleviated labor strength greatly, and the raising construction progress has lowered construction cost.
Claims (2)
1. one kind is used for the construction Hanging Basket that municipal engineering and room are built; It is characterized in that; It supports five parts by load-bearing hook, load-bearing frame, protective guard, bearing soleplate and load-bearing and forms, and load-bearing hangs on the protective guard, the load-bearing frame with support base plate and directly ride on the protective guard.
2. a kind of construction Hanging Basket that municipal engineering and room are built that is used for as claimed in claim 1; It is characterized in that; Described load-bearing hook, load-bearing frame, and load-bearing support and select 50mm * 50mm stainless steel square tube for use, protective guard and bearing soleplate are selected 40mm * 40mm stainless steel square tube for use.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200034907U CN202466408U (en) | 2012-01-04 | 2012-01-04 | Construction hanging basket for municipal engineering and house building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200034907U CN202466408U (en) | 2012-01-04 | 2012-01-04 | Construction hanging basket for municipal engineering and house building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202466408U true CN202466408U (en) | 2012-10-03 |
Family
ID=46914576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200034907U Expired - Fee Related CN202466408U (en) | 2012-01-04 | 2012-01-04 | Construction hanging basket for municipal engineering and house building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202466408U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464355A (en) * | 2015-12-23 | 2016-04-06 | 中国建筑第六工程局有限公司 | Operating platform used for installation of curved building external window |
-
2012
- 2012-01-04 CN CN2012200034907U patent/CN202466408U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464355A (en) * | 2015-12-23 | 2016-04-06 | 中国建筑第六工程局有限公司 | Operating platform used for installation of curved building external window |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201050198Y (en) | Structure for integral transformation for old industrial factory building | |
CN107883427A (en) | A kind of novel high-efficiency and energy-saving heating system equipment | |
CN202466408U (en) | Construction hanging basket for municipal engineering and house building | |
CN206233688U (en) | A kind of urban construction guardrail | |
CN202416322U (en) | Device for removing mud peel outside punching pile | |
CN102392488A (en) | Vertical reticulated shell steel-concrete combined structure | |
CN205131584U (en) | Marine monitoring platform | |
CN202416892U (en) | Moveable fence at edges and openings | |
CN208687105U (en) | A kind of water supply pipe mounting rack with detection function | |
CN202416125U (en) | Elevation controller | |
CN201746847U (en) | Combined multifunctional base of tower crane | |
CN203452359U (en) | Construction hanging basket | |
CN201241501Y (en) | City aerial garden | |
JP2006226278A (en) | Power generation operation device of generator | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
WO2013032415A1 (en) | Wind energy tower | |
CN208294047U (en) | A kind of construction hanging basket built for municipal works and room | |
CN202467326U (en) | Novel polyvinyl chloride (PVC) fence | |
CN204947057U (en) | A kind of annular beautifies tower | |
CN200961298Y (en) | Fiber reinforced gypsum big board bearing architecture system | |
CN101634192B (en) | Monolithic building | |
CN202575754U (en) | Space pipe truss structure secondary truss high altitude lifting moving hanging rack | |
CN202416364U (en) | Overall well for municipal engineering | |
CN206521936U (en) | It is a kind of to be used for the construction hanging basket of municipal works and house construction engineering | |
CN206189471U (en) | Municipal works are with theftproof well lid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121003 Termination date: 20170104 |