CN202451055U - Drilling locating device for down-the-hole drill - Google Patents

Drilling locating device for down-the-hole drill Download PDF

Info

Publication number
CN202451055U
CN202451055U CN2012200117280U CN201220011728U CN202451055U CN 202451055 U CN202451055 U CN 202451055U CN 2012200117280 U CN2012200117280 U CN 2012200117280U CN 201220011728 U CN201220011728 U CN 201220011728U CN 202451055 U CN202451055 U CN 202451055U
Authority
CN
China
Prior art keywords
locating
unit
positioning unit
drill
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012200117280U
Other languages
Chinese (zh)
Inventor
范锡生
范湘生
汪鹏程
阎立民
胡智君
卓义
贺龙明
徐尚斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Tongguan Machinery Co Ltd
Original Assignee
Anhui Tongguan Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Tongguan Machinery Co Ltd filed Critical Anhui Tongguan Machinery Co Ltd
Priority to CN2012200117280U priority Critical patent/CN202451055U/en
Application granted granted Critical
Publication of CN202451055U publication Critical patent/CN202451055U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Abstract

The utility model belongs to the field of geotechnical engineering machinery for underground mines, tunnels, water conservation and the like, and in particular relates to a drilling locating device for a down-the-hole drill. The device comprises a locating unit and a guide unit which is arranged on a drill body and used for guiding the acting direction of the locating unit; wherein the locating unit has stretching and shrinking position states, and a locating portion of the locating unit is arranged parallelly or in a coinciding mode with a locating central line of a drill boom of the drill in a vertical state when the locating unit stretches out of the drill body. After adoption of the structure, a centering requirement for the drilling locating central line of the drill with a drilling position marked on the ground in the position state can be satisfied directly through the accurate locating of the locating portion of the locating unit, an operator only needs to operate walking of the whole machine separately and note the actual position of the locating portion which serves as a reference, repeated lifting of the drill boom for repeated locating verification is not needed, the whole process is fast and convenient, and the locating and producing efficiencies are extremely high.

Description

A kind of down-the-hole drill boring positioner
Technical field
The utility model belongs to underground mine and tunnel, water conservancy isolith geotechnique journey mechanical field, is specifically related to a kind of down-the-hole drill boring positioner that applies on the down-the-hole drill.
Background technology
Down-the-hole drill is a kind of mining machinery of formation downhole boring, and it mainly carries out vertical rock drilling boring, passes through other equipment again to loading explosive in the hole with the bursting work of final realization to the rock stratum.In order to reach demolition effect preferably, generally need be every at a distance from certain distance (about 2~3 meters usually) boring in the rock layer surface of being dug, form hole by rows.In the actual job, its perforate spacing has higher relative positional accuracy requirement according to the stope situation, if the perforate distance is excessive, can influence demolition effect, if the perforate spacing is little, then can improve its cost of production.
Traditional down-the-hole drill boring location situation, shown in Fig. 1-2: rig is under walking states, and drill boom a and frame b press from both sides an acute angle each other; Operating personnel operate walking reversal valve c at the back at rig; Change the rig forward-reverse, when estimating rig near bore position, operating personnel operate drill boom again and face upward the control valve d that bows in the rig middle part; Face upward the oil cylinder e that bows; Promote drill boom a, make drill boom keep plumbness (being the positioning states of punchinging of Fig. 1), could final inspection go out the bore position whether centre of location line of holing on the rig aims at land mark this moment.If it exists than mistake moderate, then need the drill boom of plumbness be returned to original state again, just can operate walking reversal valve c, to readjust the complete machine bore position; If the drill boom a of plumbness does not set back, direct control changes the rig walking, then very easily causes potential safety hazards such as rig rollover.In order to guarantee that drill boom drill center line and land mark overlap, need the staff to switch repeatedly to face upward bow control valve d and complete machine walking reversal valve c, and locate repeatedly and check, whole process very complicated, waste time and energy, while production efficiency is extremely low.
Summary of the invention
The purpose of the utility model provides a kind of down-the-hole drill simple in structure and easy to use boring positioner, and production efficiency is high.
For realizing above-mentioned purpose; The utility model has adopted following technical scheme: a kind of down-the-hole drill boring positioner; Comprise positioning unit and be arranged at the pilot unit that is used for guide-localization unit direction of action on the rig body; Said positioning unit has and stretches out and shrink two kinds of location statuss, when positioning unit stretches out the rig body, the location division of positioning unit during with plumbness rig drill boom centre of location line parallel or overlap setting.
The major advantage of the utility model is: adopt after the said mechanism; Directly pass through the accurate location of positioning unit location division; Meet its centering requirement between the rig boring centre of location line that can guarantee this location status and the bore position of land mark, the staff only needs operation car load separately to walk and the true bearing be careful as the location division of object of reference gets final product, and need not staff's lifting drill boom and locate repeatedly and check repeatedly; Whole process is efficient and convenient, and location and production efficiency are high.
Description of drawings
Fig. 1, Fig. 2 are traditional down-the-hole drill boring positioning states figure;
Positioning states figure when Fig. 3 is installed on the down-the-hole drill for the utility model;
Fig. 4 is the structural representation of the utility model.
The specific embodiment
A kind of down-the-hole drill boring positioner; Comprise positioning unit 10 and be arranged at the pilot unit 20 that is used for guide-localization unit 10 direction of action on the rig body; Said positioning unit 10 has and stretches out and shrink two kinds of location statuss; When positioning unit 10 stretches out the rig body, the location division of positioning unit 10 during with plumbness rig drill boom centre of location line parallel or overlap setting, shown in Fig. 3-4.
Further preferred version as the utility model: shown in Fig. 3-4; Said positioning unit 10 is a pull bar; The rectangular bending of said positioning unit 10 profiles; 20 formation slide rails of one of which end and pilot unit cooperate, the drill boom centre of location line parallel when its other end constitutes location division and its axis with plumbness or overlap setting.Drill boom centre of location line parallel when why selecting the location division axis or overlap setting with plumbness; This is because no doubt both deads in line are prioritization schemes the most; Yet, between the drill boom centre of location line in the time of also can realizing location division and plumbness through its known deviation of artificial setting with reference to centering; Because an end of positioning unit 10 has constituted its location division naturally; During practical operation; Rig drill boom centre of location line when only needing to guarantee this end axis with plumbness coincide or gets final product along a certain known quantity of its specific direction deviation, need not staff's lifting drill boom and locate repeatedly and check repeatedly, thus the complicated problem of also having brought of formality with regard to having avoided the pitching of repetitive operation drill boom to locate; Integrated operation is easy, and is simple and practical.
Further; Said pilot unit 20 is a guide pipe; Said pilot unit 20 levels are fixed in borer frame bottom place, and said positioning unit 10 profiles are " L " shape, and the socket of formation sleeve type cooperates between said positioning unit 10 long end outer walls and pilot unit 20 inner tubal walls.The actual installation structure can be with reference to shown in Figure 4; Because its frame bottom is all for being horizontally disposed with usually; Here as the matrix of fixed guide unit 20; Because constituting socket, 20 of positioning unit 10 and pilot units cooperate, positioning unit 10 small ends nature directed towards ground place, and it points to, and the position is bottomside mark and drill boom drill center line needs aligned position; Also can be further key be set at its pilot unit 20 set inside keyways and corresponding cooperation place with it at positioning unit 10, thus the small end of guaranteeing positioning unit 10 when guaranteeing its guiding action directed towards ground place all the time; Simultaneously; It is on the one hand for guaranteeing the action message of 20 of positioning unit 10 and pilot units; Therefore with on the positioning unit 10 with pilot unit 20 abutting end proper extensions, guarantee the accuracy of the direction of action of positioning unit 10 through the matching relationship of long distance, certainly; Also can use like the track cooperation during actual the employing etc., as long as realize the stable accurately guiding of its direction of action; On the other hand, the location division end on the positioning unit 10 is suitably shortened, thereby guaranteeing to produce interference between location division length that it is can be because of it not long when realizing locating effect yet and rig miscellaneous part, thereby make it be easier to practical operation.
Further, for the extension elongation that guarantees positioning unit 10 meets the requirements, also be provided with the limiting section 30 that is used for gear and limits the positioning unit outreach on the said positioning unit 10.That is to say, when the staff operates car load walking back and reorientates new boring, only need directly pull out pull bar and get final product, thereby simplify its operation to stretching out the summit; During practical application, maybe can adopt as in advance artificially spacingly, maybe can adopt electrical equipment such as travel switch spacing, all can realize its limit effect at pull bar high scale etc.
Further; For in the limit function of realizing limiting section 30, guaranteeing that its structure is more simple; As shown in Figure 4; Said limiting section 30 is cottor pin, and said positioning unit 10 offers spacing hole at the other end place of its relative positioning portion, constitutes between cottor pin and spacing hole that latch cooperates and cooperates with pilot unit 20 1 ends formation gear.During practical operation, also can adopt and weld block etc. again after socket is installed, just give unnecessary details no longer one by one here.
Because positioning unit 10 be not in contraction state under the user mode; For preventing that its stressed skidding off when rig is walked from influencing real work; Said boring positioner comprises also and is used for being provided with the hook portion 40 that its location division connects and fixes when positioning unit 10 shrinks that said hook portion 40 is arranged at borer frame tail end place; Reality can be as shown in Figure 4; Welding has the limited block of groove at borer frame tail end place; Its limited block is positioned at the side of positioning unit 10 path of motion, when positioning unit 10 does not use, make its withdrawal and turn an angle after with the direct clamping of its small end or take and put on borer frame and realize fixing; Not only make things convenient for it in complex environments such as underground mine and tunnel, water conservancy, to carry out rock drilling boring location; Simultaneously because therefore borer frame mutually noninterfere between inevitable and drill boom operating path when making has just guaranteed that also the positioning unit 10 of the utility model is in home, the assurance that finally provides for the reliable and stable work of its complete machine after contraction.
Below in conjunction with Fig. 3-4, the workflow through the utility model is to further describe the utility model:
(1), when the predetermined mark in ground is holed, pull out positioning unit 10 earlier, positioning unit 10 outermost small end axis indication positions are the position of drill boom drill center line; At this moment, operation rig walking reversal valve c drives the complete machine walking to adjust its position; Simultaneously, whether the small end of observing positioning unit 10 points to the mark that need hole with ground and overlaps.
(2), after the small end of positioning unit 10 points to and need hole in ground mark overlaps, shrink positioning unit 10, simultaneously with the small end rotation of positioning unit 10 and be connected on the hook portion 40;
(3), the operation drill boom is faced upward the control valve d that bows; Driving is faced upward the oil cylinder e that bows to promote and to keep drill boom a to be in plumbness; Because the boring point of the previous being checked good bottom surface of positioning unit 10; At this moment, drill boom centre of location line also is and land mark overlaps, final accurate location and the bore operation that needs the explosion petrosal foramen of accomplishing.
During the actual use of the utility model, also can be applicable to needs can realize its quick locating effect equally in the pinpoint equipment like impactor, drill bit etc., all can use according to actual conditions.

Claims (6)

1. down-the-hole drill boring positioner; It is characterized in that: comprise positioning unit (10) and be arranged at the pilot unit (20) that is used for guide-localization unit (10) direction of action on the rig body; Said positioning unit (10) has and stretches out and shrink two kinds of location statuss; When positioning unit (10) stretches out the rig body, the location division of positioning unit (10) during with plumbness rig drill boom centre of location line parallel or overlap setting.
2. boring positioner according to claim 1; It is characterized in that: said positioning unit (10) is a pull bar; The rectangular bending of said positioning unit (10) profile; Constitute slide rail between one of which end and pilot unit (20) and cooperate, its other end formation location division and its axis during with plumbness drill boom centre of location line parallel or overlap setting.
3. boring positioner according to claim 2; It is characterized in that: said pilot unit (20) is a guide pipe; Said pilot unit (20) level is fixed in place, borer frame bottom; Said positioning unit (10) profile is " L " shape, and the socket of formation sleeve type cooperates between the long end of said positioning unit (10) outer wall and pilot unit (20) inner tubal wall.
4. according to claim 2 or 3 described boring positioners, it is characterized in that: also be provided with the limiting section (30) that is used for gear and limits the positioning unit outreach on the said positioning unit (10).
5. boring positioner according to claim 4; It is characterized in that: said limiting section (30) is cottor pin; Said positioning unit (10) offers spacing hole at the other end place of its relative positioning portion, constitutes between cottor pin and spacing hole that latch cooperates and cooperates with pilot unit (20) one ends formation gear.
6. according to claim 2 or 3 described boring positioners; It is characterized in that: said boring positioner comprises also and is used for being provided with the hook portion (40) that its location division connects and fixes when positioning unit (10) shrinks that said hook portion (40) is arranged at borer frame tail end place.
CN2012200117280U 2012-01-12 2012-01-12 Drilling locating device for down-the-hole drill Withdrawn - After Issue CN202451055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200117280U CN202451055U (en) 2012-01-12 2012-01-12 Drilling locating device for down-the-hole drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200117280U CN202451055U (en) 2012-01-12 2012-01-12 Drilling locating device for down-the-hole drill

Publications (1)

Publication Number Publication Date
CN202451055U true CN202451055U (en) 2012-09-26

Family

ID=46866925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200117280U Withdrawn - After Issue CN202451055U (en) 2012-01-12 2012-01-12 Drilling locating device for down-the-hole drill

Country Status (1)

Country Link
CN (1) CN202451055U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536120A (en) * 2012-01-12 2012-07-04 安徽铜冠机械股份有限公司 Drilling and positioning device for down-the-hole drill
CN104481563A (en) * 2014-12-01 2015-04-01 中煤第五建设有限公司 Simple locating die and method for bracket bolting hole of well device
CN109339706A (en) * 2018-12-13 2019-02-15 长江三峡勘测研究院有限公司(武汉) It is quickly laid flat row drilling equipment and its drilling and positioning method surely

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536120A (en) * 2012-01-12 2012-07-04 安徽铜冠机械股份有限公司 Drilling and positioning device for down-the-hole drill
CN102536120B (en) * 2012-01-12 2014-02-26 安徽铜冠机械股份有限公司 Drilling and positioning device for down-the-hole drill
CN104481563A (en) * 2014-12-01 2015-04-01 中煤第五建设有限公司 Simple locating die and method for bracket bolting hole of well device
CN109339706A (en) * 2018-12-13 2019-02-15 长江三峡勘测研究院有限公司(武汉) It is quickly laid flat row drilling equipment and its drilling and positioning method surely

Similar Documents

Publication Publication Date Title
CN101435312B (en) Multifunctional hammer drill
CN205422678U (en) Dig rig drilling rod monitor control device soon
CN105604589B (en) A kind of minor diameter complete-section tunnel boring machine jumbolter system
CN104712339A (en) Annular pipe jacking machine
CN103758453A (en) Intelligent micro drilling machine
CN102434154A (en) Development machine-mounted anchor rod drilling rig
CN201915824U (en) Truck-mounted rotary drilling rig with construction function of diaphragm wall
CN202451055U (en) Drilling locating device for down-the-hole drill
CN105971611A (en) Roadbed settlement control method for subway tunnel passing under existing trunk railway closely
CN203050503U (en) Super-deep-hole double-tube directional drilling machine
CN104929517A (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
CN103670421A (en) Central inclined hole method parallel tunnel excavation method
CN207177932U (en) A kind of single arch is without post greatly across the advanced support structure of Station
CN110067509B (en) Reverse well drilling machine capable of drilling directional pilot hole and construction process of directional pilot hole
CN102536120B (en) Drilling and positioning device for down-the-hole drill
CN104453705A (en) Secondary forming method for large-hole-diameter cast-in-place pile rotary drilling rig
CN103061675A (en) Super-deep hole double-tube drilling directional drilling rig
CN203008778U (en) Crawler-type full hydraulic underground drill rig
CN104141455A (en) Drilling machine device and drilling method of drilling machine
CN201560769U (en) Improved three-arm drilling jumbo
CN202431184U (en) Split self-propelled coal mine tunnel drill rig
CN107327305A (en) A kind of pipe curtain construction multiaxis unit head and pipe row's jacking tube curtain machine with the unit head
CN105003215A (en) Coiled tubing unit
CN203891877U (en) Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine
CN105569662B (en) Can intermittently be stretched the mole retreated

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120926

Effective date of abandoning: 20140226

RGAV Abandon patent right to avoid regrant