CN202438652U - Shaping mould for hot extrusion forming of through hole of forging work clamping sheet - Google Patents

Shaping mould for hot extrusion forming of through hole of forging work clamping sheet Download PDF

Info

Publication number
CN202438652U
CN202438652U CN2012200515038U CN201220051503U CN202438652U CN 202438652 U CN202438652 U CN 202438652U CN 2012200515038 U CN2012200515038 U CN 2012200515038U CN 201220051503 U CN201220051503 U CN 201220051503U CN 202438652 U CN202438652 U CN 202438652U
Authority
CN
China
Prior art keywords
die
punch
shaping mould
hole
hot extrusion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200515038U
Other languages
Chinese (zh)
Inventor
黄基平
冯克敏
王涛
张有朋
李世宽
廖茂
董兴明
王斌全
赵继
张宇树
张凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN XINZHU PRECISE BILLET FORGING CO Ltd
Original Assignee
SICHUAN XINZHU PRECISE BILLET FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN XINZHU PRECISE BILLET FORGING CO Ltd filed Critical SICHUAN XINZHU PRECISE BILLET FORGING CO Ltd
Priority to CN2012200515038U priority Critical patent/CN202438652U/en
Application granted granted Critical
Publication of CN202438652U publication Critical patent/CN202438652U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The utility model discloses a shaping mould for hot extrusion forming of a through hole of a forging work clamping sheet. The shaping mould comprises an upper template, a lower template and a pull plate, wherein the upper template is provided with a die shank; the die shank is provided with a male die; the lower template is provided with two unloading rods; an unloading plate is arranged on the unloading rods; springs in a compressed state are sleeved on the unloading rods between the unloading plate and the lower template; a male die sleeve is arranged on the unloading plate; and the lower template is also provided with a female die which is matched with the convex die. The male die and the male die sleeve are firstly matched and centered to enter the female die together to punch and shape, so that eccentricity of a product is prevented; the height can be fixed after adjustment; the shaped workpiece is guaranteed to reach the technological requirements; the male die ascends with the workpiece after shaping; the male die and the male die sleeve are separated to finish unloading after the workpiece reaches a set position; and compared with the conventional process, the using amount of the raw material is saved, the machining processes are reduced, and the aim of reducing the cost by about 20 percent is fulfilled.

Description

The shaping mould of hammered work intermediate plate hot extrusion through hole
Technical field
The utility model relates to the mould that a kind of Forging Technology is used, and specifically is meant the shaping mould of hammered work intermediate plate hot extrusion through hole.
Background technology
Along with the development of prestressing technique, intermediate plate anchor proportion in prestress engineering is increasing, and consumption sharply increases, and the time anchor clipper most important in the intermediate plate anchor, that consumption is maximum.Anchor clipper is used for clamping presstressed reinforcing steel when the deformed bar of anchor prestressed concrete member, and he is widely used in the construction such as different types of rridges road skyscraper.At present each prestressing force manufacturer to produce the traditional handicraft of anchor clipper be to adopt round bar, split end face, turning hole, boring, finish turning endoporus then, process hole taper, attack internal thread, the car external taper, dissect, operations such as heat treatment and sandblast.Blasting treatment process after the heat treatment is little to the impact and the shear action power of surface of the work, causes inefficiency, and the workpiece surface quality after the processing is relatively poor.
The utility model content
The purpose of the utility model is to provide the shaping mould of hammered work intermediate plate hot extrusion through hole, cooperates processing technology, substitutes the method that the ground tackle work clip sheet is made in machined, reaches to reduce raw-material consumption, reduces machining processes, the purpose that reduces cost.
The purpose of the utility model realizes through following technical proposals:
The shaping mould of hammered work intermediate plate hot extrusion through hole; Comprise and be connected the cope match-plate pattern on the punch press and be positioned at the lower bolster under the cope match-plate pattern; On described cope match-plate pattern, die shank is installed, punch is installed on die shank, two discharge arms are installed on lower bolster; Stripper is installed on discharge arm; On the discharge arm between stripper and the lower bolster, be set with the spring that is in compressive state, punch case is installed on stripper, the die that is complementary with punch also is installed on lower bolster.During use, the workpiece of mould forging is put into die, punch press drives cope match-plate pattern, and cope match-plate pattern drives punch and moves downward; Punch passes the through hole of punch case earlier, could continue then to move downward, and workpiece is forged extruding; After accomplishing extruding, the spring that is in compressive state drives stripper and moves upward, when reaching the extreme higher position; Punch continues to move upward, and workpiece is the disengaging punch under the effect of stripper, after workpiece is ejected; Can take out workpiece, new workpiece is installed, process next time.With respect to present technology, the mode that adopts mould to forge is processed into the through hole of ground tackle work clip sheet, has replaced present bore process; Practiced thrift raw-material use amount; Relation according to the cumulative volume of the volume of work clip sheet through hole and work clip sheet can be learnt, compares present technology, the consumption that can save material; Reduce machining processes, reach about 20% the purpose of reducing cost.
On described lower bolster, die holder is installed; In die holder, be set with the die circle stress; In the die circle stress, be set with die, die is connected through taper fit with the die circle stress, and the die circle stress is fixedly connected on the die holder through the die locking nut; The inner upper surface of die holder is recessed to form annular groove downwards, in groove, is placed with the perforation pad.Saying that further die belongs to running stores, is the independent original paper that can change; Die is connected with the die circle stress through taper fit, and the die circle stress is that die provides anti-impact force, and the die circle stress is fixedly connected on the die holder through the die locking nut; So, not only die can be when die damages, changed, and the model of processing work can be enlarged; The die holder of die bottom is provided with groove, and inside grooves is placed with a perforation pad, and its effect is that punch can stamp out through hole fully; Reduce the impact of punch press simultaneously, guarantee that the punching press of through hole is accomplished die holder.
Be provided with the through hole that is positioned under the punch on said base plate, die holder and the perforation pad.
Said punch is fixedly connected on the die shank through the punch locking nut, and said punch locking nut is provided with water pipe head.Say that further because the in running order time of punch is longer, its heat that receives is bigger; In order to lower the temperature to punch, the punch locking nut is provided with water pipe head, and water pipe head connects cooling fluid; The normal working temperature that can keep punch is avoided the too high problem of bringing of temperature.
The utility model compared with prior art has following advantage and beneficial effect:
The shaping mould of 1 the utility model hammered work intermediate plate hot extrusion through hole, with respect to present technology, the mode that adopts mould to forge is processed into the through hole of ground tackle work clip sheet; Replaced present bore process, practiced thrift raw-material use amount, can learn according to the relation of the cumulative volume of the volume of work clip sheet through hole and work clip sheet; Compare present technology; The consumption that can save material reduces machining processes, reaches about 20% the purpose of reducing cost;
The shaping mould of 2 the utility model hammered work intermediate plate hot extrusion through holes, maximum characteristics are after punch case cooperates earlier centering, to get into the die shaping again of boring a hole earlier through punch, prevent that product is eccentric; Height can fix after adjustment, and workpiece reaches technological requirement after the assurance shaping, and the punch band the workpiece rising after the shaping; Punch separates discharging and accomplishes with punch case behind the desired location; Take out workpiece, through automatic cooling system mould is cooled off simultaneously, mould parts is realized changing fast;
The shaping mould of 3 the utility model hammered work intermediate plate hot extrusion through holes, is made simple, cooling automatically, lubricated, discharging, die change time≤10min at novel structure, reaches 10000/ the service life of punch.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is through the utility model processed workpiece structural representation.
Mark and corresponding parts title in the accompanying drawing:
The 301-die shank, 303-water pipe head, 305-punch, 306-die, 307-die circle stress; 308-die locking nut, 309-die holder, 313-cope match-plate pattern, 314-punch locking nut, 315-punch case; The 317-pad of boring a hole, 321-lower bolster, 323-discharge arm, 324-spring, 325-stripper.
The specific embodiment
Below in conjunction with embodiment the utility model is done further to specify, but the embodiment of the utility model is not limited thereto.
Embodiment
As shown in Figure 1; The shaping mould of the utility model hammered work intermediate plate hot extrusion through hole; Comprise the cope match-plate pattern 313 that is connected on the punch press and be positioned at the lower bolster 321 under the cope match-plate pattern 313, die shank 301 is installed on cope match-plate pattern 313, punch 305 is installed on die shank 301; Punch 305 is fixedly connected on the die shank 301 through punch locking nut 315, and punch locking nut 315 is provided with water pipe head 303; Two discharge arms 323 are installed on lower bolster 321, stripper 325 is installed on discharge arm 323, on the discharge arm 323 between stripper 325 and the lower bolster 321, be set with the spring 324 that is in compressive state, punch case 315 is installed on stripper 325; Die holder 309 is installed on lower bolster 321; Die holder 309 is positioned under the punch 305; In die holder 309, be set with die circle stress 307, in die circle stress 307, be set with die 306, die 306 and die circle stress 307 are connected through taper fit; Die circle stress 307 is fixedly connected on the die holder 309 through die locking nut 308; The inner upper surfaces of die holder 309 are recessed to form annular groove downwards, in groove, being placed with perforation pad 317, are being provided with the through hole that is positioned under the punch 305 on base plate 321, die holder 309 and the perforation pad 317.
The use technology of the shaping mould of hammered work intermediate plate hot extrusion through hole may further comprise the steps:
(A) blanking: utilize the sawing machine blanking, blank is of a size of φ 25 * 33.5;
(B) deburring: utilize the blank deburring of grinder, burr, greasy dirt, rust staining and dirt on the blank are removed, after the blank clean, according to different heat (batch) numbers separately with blank to step (A);
(C) heating: the clean blank of step (B) is placed the heating of heating in medium frequency stove, and heating-up temperature is 1100 ± 20 ℃;
(D) blocking: use 100 tons of punch presses, in 5S, accomplish following steps:
(D1) mould is correctly installed, whether inspection punch, die align, whether shut height is correct, and punch case is finely tuned according to product height after getting into die 20mm;
(D2) open recirculated cooling water, cooling water can be got in the die for the flow according to mold temperature adjusting die recirculated cooling water, and the flow that cooling water gets into die is 1~5ml/s;
(D3) start, first dry running twice, whether the inspection punch press is normal;
(D4) blank after will heating is correctly put into die with clamp, forges, and when slide block is got back to after top dead center, takes out forging, is transferred to shaping dies;
(E) be shaped: use 100 tons of punch presses, in 5S, accomplish the forging that step (D4) is obtained and carry out following steps:
(E1) mould is correctly installed, whether inspection punch, die align, whether shut height is correct, and punch case is finely tuned according to product height after getting into die 14.5mm;
(E2) open recirculated cooling water, regulate the die circulating cooling water flow according to mold temperature, cooling water can be got in the die, the flow that cooling water gets into die is 1~5ml/s;
(E3) start, first dry running twice, whether the inspection punch press is normal;
(E4) blocking is good workpiece is correctly put into die with clamp, forges, and when slide block is got back to after top dead center, takes out forging, is transferred to shaping mould;
(F) shaping: use 100 tons of punch presses, the forging that step (E) is obtained carries out the forward extrusion closed-die forging; Said step (F) need be accomplished in 5S, specifically may further comprise the steps:
(F1) mould is correctly installed, whether inspection punch, die align, whether shut height is correct, and punch case is finely tuned according to product height after getting into die 16.5mm;
(F2) open recirculated cooling water, cooling water can be got in the die for the flow according to mold temperature adjusting die recirculated cooling water, and the flow that cooling water gets into die is 1~5ml/s;
(F3) start, first dry running twice, whether the inspection punch press is normal;
The workpiece that (F4) will be shaped is correctly put into die with clamp, forges, and when slide block is got back to after top dead center, takes out forging;
(G) cooling: the forging that step (F4) is obtained hooks cooling in heap in the hopper with forging after being positioned over and being cooled to 600 ℃ in the lubricating substance groove;
(H) ball blast: the workpiece oxide skin that step (G) obtains is removed fully with shot-blasting machine.
Check according to blank drawing that at last through statistics, this technology reaches more than 98% in the product percent of pass of experimental stage, is higher than the qualification rate of present machinofacture far away.
The above; It only is the preferred embodiment of the utility model; Be not that the utility model is done any pro forma restriction, every according on the technical spirit of the utility model to any simple modification, equivalent variations that above embodiment did, all fall within the protection domain of the utility model.

Claims (4)

1. the shaping mould of hammered work intermediate plate hot extrusion through hole; Comprise the cope match-plate pattern (313) that is connected on the punch press and be positioned at the lower bolster (321) under the cope match-plate pattern (313); It is characterized in that: die shank (301) is installed on described cope match-plate pattern (313); Punch (305) is installed on die shank (301); Two discharge arms (323) are installed on lower bolster (321), stripper (325) is installed on discharge arm (323), on the discharge arm (323) between stripper (325) and the lower bolster (321), be set with the spring (324) that is in compressive state; Punch case (315) is installed on stripper (325), the die (306) that is complementary with punch (305) also is installed on lower bolster (321).
2. the shaping mould of hammered work intermediate plate hot extrusion through hole according to claim 1; It is characterized in that: die holder (309) is installed on described lower bolster (321); In die holder (309), be set with die circle stress (307); In die circle stress (307), be set with die (306), die (306) is connected through taper fit with die circle stress (307), and die circle stress (307) is fixedly connected on the die holder (309) through die locking nut (308); The inner upper surface of die holder (309) is recessed to form annular groove downwards, in groove, is placed with perforation pad (317).
3. the shaping mould of hammered work intermediate plate hot extrusion through hole according to claim 2 is characterized in that: be provided with the through hole that is positioned under the punch (305) on said base plate (321), die holder (309) and the perforation pad (317).
4. the shaping mould of hammered work intermediate plate hot extrusion through hole according to claim 1; It is characterized in that: said punch (305) is fixedly connected on the die shank (301) through punch locking nut (315), and said punch locking nut (315) is provided with water pipe head (303).
CN2012200515038U 2012-02-17 2012-02-17 Shaping mould for hot extrusion forming of through hole of forging work clamping sheet Expired - Fee Related CN202438652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200515038U CN202438652U (en) 2012-02-17 2012-02-17 Shaping mould for hot extrusion forming of through hole of forging work clamping sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200515038U CN202438652U (en) 2012-02-17 2012-02-17 Shaping mould for hot extrusion forming of through hole of forging work clamping sheet

Publications (1)

Publication Number Publication Date
CN202438652U true CN202438652U (en) 2012-09-19

Family

ID=46820107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200515038U Expired - Fee Related CN202438652U (en) 2012-02-17 2012-02-17 Shaping mould for hot extrusion forming of through hole of forging work clamping sheet

Country Status (1)

Country Link
CN (1) CN202438652U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104014656A (en) * 2014-06-05 2014-09-03 昆山电子羽电业制品有限公司 Stamping and shaping die for case side plate
CN107303589A (en) * 2016-04-18 2017-10-31 河北工业大学 A kind of method and mould for producing lead joint terminal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104014656A (en) * 2014-06-05 2014-09-03 昆山电子羽电业制品有限公司 Stamping and shaping die for case side plate
CN107303589A (en) * 2016-04-18 2017-10-31 河北工业大学 A kind of method and mould for producing lead joint terminal

Similar Documents

Publication Publication Date Title
CN102554090A (en) Forging method for forming through holes of working clamping plates by hot extrusion
CN102319808B (en) Hot stamping mould for nut
CN102672096A (en) Precision die forging and shaping technical method for automobile steering knuckle rough type parts
CN108188316A (en) The equipment systems and production technology of a kind of forged steel ball
CN101486060B (en) Thermoforming and hole-punching integrated technique and mold of high-duty steel part
CN105945519A (en) Cold forging forming technology of hollow pipe output shaft
CN105689619A (en) Forming method for forging hot-extrusion through hole in working clip
CN203887061U (en) Universal necking-down and flaring continuous die
CN105689614A (en) Production technique for clamping piece
CN202438652U (en) Shaping mould for hot extrusion forming of through hole of forging work clamping sheet
CN204974783U (en) Wheel nut multistation extrusion die
CN202411318U (en) Forming die for forging hot extrusion through hole of working clip
CN106513550A (en) Pre-forging process for forging hot extrusion through hole of working-clip
CN103240359A (en) Near-net forming method of high-strength internal hexagon bored bolt
CN202411317U (en) Pre-forging mold for forging hot extrusion through hole of working clip
CN112756538A (en) Near-net forming die and method for forging hinge beam of refined steel stone pressure equipment
CN112338114A (en) Forming process of inner hole inclined ring piece
CN210387405U (en) Tool die for hot forging and cold forging composite distribution plastic forming
CN201353616Y (en) Thermoforming, punching and trimming integrated die of high-strength steel elements
CN203281790U (en) Gear insert die
CN103252409A (en) Near-net forming die for high-strength internal hexagonal through-hole bolt
CN203955839U (en) Hot forming workpiece separation diel
CN203578514U (en) Cone workpiece blanking die
CN106513549A (en) Forming method for hot-extrusion through holes of working clip in forging mode
CN105127679B (en) A kind of processing technology of valve body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Jiping

Inventor after: Zhang Yushu

Inventor after: Zhang Kai

Inventor after: Feng Kemin

Inventor after: Wang Tao

Inventor after: Zhang Youming

Inventor after: Li Shikuan

Inventor after: Liao Mao

Inventor after: Dong Xingming

Inventor after: Wang Binquan

Inventor after: Zhao Ji

Inventor before: Huang Jiping

Inventor before: Zhang Yushu

Inventor before: Zhang Kai

Inventor before: Feng Kemin

Inventor before: Wang Tao

Inventor before: Zhang Youpeng

Inventor before: Li Shikuan

Inventor before: Liao Mao

Inventor before: Dong Xingming

Inventor before: Wang Binquan

Inventor before: Zhao Ji

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG JIPING FENG KEMIN WANG TAO ZHANG YOUPENG LI SHIKUAN LIAO MAO DONG XINGMING WANG BINQUAN ZHAO JI ZHANG YUSHU ZHANG KAI TO: HUANG JIPING FENG KEMIN WANG TAO ZHANG YOUMING LI SHIKUAN LIAO MAO DONG XINGMING WANG BINQUAN ZHAO JI ZHANG YUSHU ZHANG KAI

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20140217