CN202431282U - Tunnel protection device for thin coal seam mining - Google Patents

Tunnel protection device for thin coal seam mining Download PDF

Info

Publication number
CN202431282U
CN202431282U CN2011205129044U CN201120512904U CN202431282U CN 202431282 U CN202431282 U CN 202431282U CN 2011205129044 U CN2011205129044 U CN 2011205129044U CN 201120512904 U CN201120512904 U CN 201120512904U CN 202431282 U CN202431282 U CN 202431282U
Authority
CN
China
Prior art keywords
tunnel
pillar
seam mining
coal seam
protector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205129044U
Other languages
Chinese (zh)
Inventor
李树宏
白元付
李巨海
公成东
陈庆申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG MINGXING MINING GROUP CO Ltd
Original Assignee
SHANDONG MINGXING MINING GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG MINGXING MINING GROUP CO Ltd filed Critical SHANDONG MINGXING MINING GROUP CO Ltd
Priority to CN2011205129044U priority Critical patent/CN202431282U/en
Application granted granted Critical
Publication of CN202431282U publication Critical patent/CN202431282U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A tunnel protection device for thin coal seam mining comprises supporting columns (2) disposed in a tunnel. The top end of each column is in contact connection with the top of the tunnel and the bottom end of each column is in contact connection with the bottom of the tunnel. When height d1 of the tunnel is 1.4-1.6m, the columns are distributed in horizontal rows and in longitudinal rows. Distance d2 between each two adjacent column on a cross section of the tunnel is 0.9-1m. Distance d3 between each two adjacent column on a longitudinal section of the tunnel is 0.6-0.8m. Accordingly, protection requirement of the tunnel of the thin coal seam is met.

Description

The tunnel protector that is used for thin seam mining
One, technical field
The utility model relates to a kind of tunnel protector that is used for thin seam mining, and especially a kind of head-room that is applicable to is the protector of 1.2-1.5 rice.
Two, background technology
In order to keep the safety of mine, need protect mine, the tunnel protector that therefore is used for thin seam mining is an important mines device; In existing coal mining, with the exhaustion of person's mineral resources, the condition of the coal resource of available exploitation also more and more is restricted; Have particularly and exploited the drive that finishes, the next coal seam height is that 1.5 meters girdle can supply exploitation, exploits the tunnel in this coal seam; When protecting, roof pressure is big and base plate is soft, occurs the phenomenon at the bottom of roof cracking and the column drill easily; Make protection safety property not high, also do not have a kind of tunnel protector that is used for thin seam mining at present.
Three, summary of the invention
In order to overcome above-mentioned technical disadvantages, the purpose of the utility model provides a kind of tunnel protector that is used for thin seam mining, has therefore guaranteed the requirement of shelter in the tunnel of girdle.
For achieving the above object; The technical scheme that the utility model is taked is: include pillar, pillar is arranged in the tunnel, and the top of pillar is set to connect with the top layer contact in tunnel, the bottom is set to connects with the bottom contact in tunnel; When height of tunnel d1 is set to 1.4-1.6 rice; The arrangement mode that pillar is set to embark on journey into row distributes, and on the cross section in tunnel, is set to 0.9-1.1 rice apart from d2 between the two adjacent rows; On the longitudinal section in tunnel, be set to 0.6-0.8 rice apart from d3 between adjacent two row.
In the present technique scheme, girdle is meant that height of tunnel d1 is a 1.4-1.6 rice, and promptly the height in coal seam is a 1.4-1.6 rice.
Owing to designed pillar, make the tunnel obtain security protection, working space has appearred again, be more suitable for the exploitation in coal seam, therefore guaranteed the requirement of shelter in the tunnel of girdle.
The utility model has designed, and pillar is set to hydraulic prop.
The utility model has designed, and also includes protective screening, and protective screening is arranged on the top layer in tunnel.
The utility model has designed, and protective screening is set to mould netting.
Four, description of drawings
Fig. 1 is the sketch map of the utility model:
Fig. 2 is the A-A sectional drawing of Fig. 1.
Five, the specific embodiment
Accompanying drawing is first embodiment of the utility model, specifies present embodiment in conjunction with accompanying drawing, includes protective screening 1 and pillar 2; Protective screening 1 is arranged on the top layer in tunnel, and pillar 2 is arranged in the tunnel, and the top of pillar 2 is set to connect with the top layer contact in tunnel, the bottom is set to connects with the bottom contact in tunnel; When height of tunnel d1 is set to 1.4 meters; The arrangement mode that pillar 2 is set to embark on journey into row distributes, and on the cross section in tunnel, is set to 1.1 meters apart from d2 between the two adjacent rows; On the longitudinal section in tunnel, be set to 0.8 meter apart from d3 between adjacent two row.
In the present embodiment, pillar 2 is set to hydraulic prop.
In the present embodiment, protective screening 1 is set to mould netting.
In the tunnel, support pillar 2, make the tunnel obtain security protection, working space has appearred again, be more suitable for the exploitation in coal seam.
Among second embodiment of the utility model, when height of tunnel d1 is set to 1.6 meters, be set to 0.9 meter apart from d2 between adjacent two rows, be set to 0.6 meter apart from d3 between the two adjacent row.
Among the 3rd embodiment of the utility model, when height of tunnel d1 is set to 1.5 meters, be set to 1.0 meters apart from d2 between adjacent two rows, be set to 0.7 meter apart from d3 between the two adjacent row.
At height of tunnel d1 is in the 1.4-1.6 rice, and the scope of operation of exploitation is provided with the board-like coal-winning machine of shoveling coal, and in the tunnel, is provided with high-power 40T scraper-trough conveyer transporter.
The characteristics of the utlity model has down:
1, owing to designed pillar 2, make the tunnel obtain security protection, working space has appearred again, be more suitable for the exploitation in coal seam, therefore guaranteed the requirement of shelter in the tunnel of girdle.
2, owing to designed protective screening 1, improved barrier propterty.
In being used for the tunnel protector technical field of thin seam mining; Every pillar 2 that includes is arranged in the tunnel; The top of pillar 2 is set to connect with the top layer contact in tunnel, the bottom is set to connects with the bottom contact in tunnel; When height of tunnel d1 is set to 1.4-1.6 rice; The arrangement mode that pillar 2 is set to embark on journey into row distributes, and on the cross section in tunnel, is set to 0.9-1.1 rice apart from d2 between the two adjacent rows; On the longitudinal section in tunnel, the technology contents that is set to 0.6-0.8 rice apart from d3 between adjacent two row is all in the protection domain of the utility model.

Claims (4)

1. tunnel protector that is used for thin seam mining; It is characterized in that: include pillar (2), pillar (2) is arranged in the tunnel, and the top of pillar (2) is set to connect with the top layer contact in tunnel, the bottom is set to connects with the bottom contact in tunnel; When height of tunnel d1 is set to 1.4-1.6 rice; The arrangement mode that pillar (2) is set to embark on journey into row distributes, and on the cross section in tunnel, is set to 0.9-1.1 rice apart from d2 between the two adjacent rows; On the longitudinal section in tunnel, be set to 0.6-0.8 rice apart from d3 between adjacent two row.
2. the tunnel protector that is used for thin seam mining according to claim 1 is characterized in that: pillar (2) is set to hydraulic prop.
3. the tunnel protector that is used for thin seam mining according to claim 1 and 2 is characterized in that: also include protective screening (1), protective screening (1) is arranged on the top layer in tunnel.
4. the tunnel protector that is used for thin seam mining according to claim 3 is characterized in that: protective screening (1) is set to mould netting.
CN2011205129044U 2011-12-12 2011-12-12 Tunnel protection device for thin coal seam mining Expired - Fee Related CN202431282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205129044U CN202431282U (en) 2011-12-12 2011-12-12 Tunnel protection device for thin coal seam mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205129044U CN202431282U (en) 2011-12-12 2011-12-12 Tunnel protection device for thin coal seam mining

Publications (1)

Publication Number Publication Date
CN202431282U true CN202431282U (en) 2012-09-12

Family

ID=46780741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205129044U Expired - Fee Related CN202431282U (en) 2011-12-12 2011-12-12 Tunnel protection device for thin coal seam mining

Country Status (1)

Country Link
CN (1) CN202431282U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111365045A (en) * 2020-03-30 2020-07-03 中铁隧道集团二处有限公司 Rapid safety protection device after tunnel excavation and construction and protection method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111365045A (en) * 2020-03-30 2020-07-03 中铁隧道集团二处有限公司 Rapid safety protection device after tunnel excavation and construction and protection method thereof

Similar Documents

Publication Publication Date Title
CN109763822B (en) Large-dip-angle thick coal seam multi-section coal pillar-free staggered layer roadway protection and inter-section coal pillar-free filling method
CN110284916B (en) Scour protection tunnel hydraulic support unit and hydraulic support
CN103758560B (en) A kind of multiple topping packet zone mash gas harnessing method that goes forward one by one
CN101824985B (en) Non-coal pillar mining method of protective coal pillars in coal mine
Tu et al. Present situation of fully mechanized mining technology for steeply inclined coal seams in China
CN101922292B (en) Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
Yan et al. An innovative approach for gateroad layout in highly gassy longwall top coal caving
CN102720498B (en) Gob-side entry retaining mining process for coal face
CN104481543B (en) Stage shrink caved stopes
CN103696771A (en) Skip-mining type wangeviry stope branch roadway filling and coal mining method
ZA200506698B (en) Fully mechanized mining technique of longwall mining method
CN110397448B (en) Fully mechanized mining face through-roadway pumping support parameter optimization and crossheading coal pillar recovery method
CN104847406A (en) Method for fracturing retained filled wall of adjacent coal face
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN104675397B (en) Fully-mechanized sublevel caving face section-free coal pillar mining method for thick coal layer
CN204532363U (en) The built-up arch suspension device in tunnel
CN202431282U (en) Tunnel protection device for thin coal seam mining
CN106761753B (en) A kind of thick seam slicing system lower leaf face layout of actual mining roadway method
CN205743941U (en) A kind of colliery tunnel support plate
CN103603682B (en) A kind of top plate supporting method being applicable to slice drift cemented filling mining
CN109915144B (en) Large-dip-angle branched coal seam fully-mechanized caving-to-fully-mechanized mining continuous propelling mining method
CN107448223A (en) Underground coal mine rectangular shaped roadways branch protecting assembly
CN203394552U (en) Roadway support protecting net and support system
CN108060921B (en) Thick coal seam gob-side roadway bottom coal recovery method based on narrow coal pillar heave effect

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120912

Termination date: 20131212