CN202417620U - 一种大型火力发电厂的汽轮发电机组布置结构 - Google Patents

一种大型火力发电厂的汽轮发电机组布置结构 Download PDF

Info

Publication number
CN202417620U
CN202417620U CN2011205460944U CN201120546094U CN202417620U CN 202417620 U CN202417620 U CN 202417620U CN 2011205460944 U CN2011205460944 U CN 2011205460944U CN 201120546094 U CN201120546094 U CN 201120546094U CN 202417620 U CN202417620 U CN 202417620U
Authority
CN
China
Prior art keywords
steam turbine
turbine generator
generator units
generator
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205460944U
Other languages
English (en)
Inventor
卢婉珍
钱海平
徐红波
光旭
张卫灵
林俊光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd
Original Assignee
Zhejiang Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Design Institute filed Critical Zhejiang Electric Power Design Institute
Priority to CN2011205460944U priority Critical patent/CN202417620U/zh
Application granted granted Critical
Publication of CN202417620U publication Critical patent/CN202417620U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

一种大型火力发电厂的汽轮发电机组布置结构,该结构是:它将两台汽轮发电机组纵向布置,其布置的对称中心线与两台锅炉对称中心线对齐,汽机房内发电机之间设置两台机组共用的检修场地,取消发电机之间的电气配电间,将其改至汽机房外,缩短汽机房纵向长度及每台机组的机头与锅炉中心线的纵向距离;它具有降低投资,优化机组安装施工次序,提高施工进度,改善发电机的安装条件,缩短发电机从检修场地至运转层安装位置的纵向距离,减少汽机房厂房安装临时大荷载受力范围等特点。

Description

一种大型火力发电厂的汽轮发电机组布置结构
技术领域
本实用新型涉及的是一种大型火力发电厂的汽轮发电机组布置结构,尤其是一种300MW及以上的大型火力发电厂(包括超(超)临界参数)汽轮发电机组的优化布置设计,属于火力发电厂设计技术领域。
背景技术
发电厂汽轮发电机组的布置按单台机组看常规的有横向布置模式(机组轴线与工程扩建方向垂直)、纵向布置模式(机组轴线沿工程扩建方向)。核电厂机组多为横向布置,火电厂机组多为纵向布置。对汽轮发电机组,当本体油系统管道布置于机组右侧时(从机头往发电机看)简称为汽机右侧布置,当本体油系统管道布置于机组左侧时(从机头往发电机看)简称为左侧布置。汽机制造厂同时设计有左侧布置汽机和右侧布置汽机,以满足用户的不同需求。
通常一期工程同时建设两台或以上机组,目前国内外超(超)临界机组的布置方案是:两台机组顺列布置,即在同一工程中,汽轮发电机组只选择一种布置方式,左侧布置或右侧布置,两台机组对应部位的间距相同;在每台机组靠发电机端外专设一跨用于布置发电机的中压配电装置等;在两机之间设置一检修场地;在每台机组靠汽机端外设一~二跨用于布置汽机的主汽、冷段、热段管道及油系统设备。
汽机对主蒸汽及再热蒸汽两根支管的温度偏差有明确的限制要求(GB/T 5578-2007)。目前国内工程主汽、热段、冷段管道的常规布置是:
1、为减少锅炉两侧四大管道的温度及压降偏差,国内600MW等级超(超)临界机组的主汽、热段、冷段均采用2-1-2的布置方式(锅炉过热器、再热器为两侧接口时),且锅炉出来的两根支管在锅炉中心线附近汇合成总管,在汽机附近再分成两根支管,两根支管的布置尽可能以锅炉中心线、汽机中心线为对称轴对称布置。该布置方式使得四大管道总管因从汽机端至锅炉中心线附近的纵向长度较长而较长。
2、对百万机组,受无缝钢管最大直径的限制,主汽、热段采用的是2-2布置模式,在靠近主汽门、中联门附近分别设置有主汽、热段的压力平衡管。冷段采用焊接钢管,为减少支管间的温度偏差及压差,采用的是与600MW等级一致的2-1-2的布置方式(锅炉再热器为两侧进口时),在锅炉中心线附近由总管分为两根支管。
3、四大管道成本高,尤其是超(超)临界机组的主汽、热段,其采用的A335P92无缝钢管单价分别超过14万元/t、16万元/t,百万机组的主汽、热段半容量管每米重超过1吨。为缩短主汽、热段管道长度、减少四大管道初投资,许多百万千瓦超(超)临界机组的主汽、热段在锅炉侧不采取对称布置,这将导致机组运行时汽机主汽门、再热汽门两侧进汽温度偏差增大。
发明内容
本实用新型的目的在于克服现有技术存在的不足,而提供一种降低投资,优化机组安装施工次序,提高施工进度,改善发电机的安装条件,缩短发电机从检修场地至运转层安装位置的纵向距离,减少汽机房厂房安装临时大荷载受力范围的大型火力发电厂的汽轮发电机组布置结构。
本实用新型的目的是通过如下技术方案来完成的,它是将两台汽轮发电机组对称布置,即发电机对发电机,两台汽轮发电机组纵向布置,其布置的对称中心线与两台锅炉对称中心线对齐,汽机房内发电机之间设置两台机组共用的检修场地,取消发电机之间的电气配电间,将其改至汽机房外,缩短汽机房纵向长度及每台机组的机头与锅炉中心线的纵向距离。
本实用新型具有如下技术效果:
1、  减少火力发电厂超(超)临界机组工程建设的初投资。
(1)  通过缩短汽机房纵向长度,大幅度减少汽机房的容积,降低土建初投资;
(2)  在保证四大管道布置的对称性、减少温度偏差及压力偏差的前提下缩短四大管道的长度,降低四大管道初投资;
(3)  为减少发电机封闭母线及动力电缆的长度创造条件。
2、  优化机组安装施工次序,提高施工进度:每台机组均可先行安装汽机高、中、低压缸,最后安装发电机,使得每台机组均可在发电机就位前完成与汽机相连管道的水压试验、管道与汽缸的大量焊接工作等,有效提高电厂安装进度;
3、  改善发电机的安装条件,缩短发电机从检修场地至运转层安装位置的纵向距离,减少汽机房厂房安装临时大荷载的受力范围。
附图说明
图1是本实用新型用于660MW超超临界机组的运转层布置示意图。
具体实施方式
下面将结合附图对本实用新型做详细的介绍:图1所示,本实用新型是将两台汽轮发电机组1对称布置,即发电机对发电机,两台汽轮发电机组1纵向布置,其布置的对称中心线与两台锅炉2对称中心线对齐,汽机房内发电机之间设置两台机组共用的检修场地3,取消发电机之间的电气配电间,将其改至汽机房外,缩短汽机房纵向长度及每台机组的机头与锅炉中心线的纵向距离。

Claims (1)

1.一种大型火力发电厂的汽轮发电机组布置结构,其特征在于该结构是:它将两台汽轮发电机组纵向布置,其布置的对称中心线与两台锅炉对称中心线对齐,汽机房内发电机之间设置两台机组共用的检修场地,并在汽机房外配制有电气配电间。
CN2011205460944U 2011-12-23 2011-12-23 一种大型火力发电厂的汽轮发电机组布置结构 Expired - Lifetime CN202417620U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205460944U CN202417620U (zh) 2011-12-23 2011-12-23 一种大型火力发电厂的汽轮发电机组布置结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205460944U CN202417620U (zh) 2011-12-23 2011-12-23 一种大型火力发电厂的汽轮发电机组布置结构

Publications (1)

Publication Number Publication Date
CN202417620U true CN202417620U (zh) 2012-09-05

Family

ID=46742393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205460944U Expired - Lifetime CN202417620U (zh) 2011-12-23 2011-12-23 一种大型火力发电厂的汽轮发电机组布置结构

Country Status (1)

Country Link
CN (1) CN202417620U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106051460A (zh) * 2016-07-22 2016-10-26 中国能源建设集团广东省电力设计研究院有限公司 一种火电机组高温再热蒸汽管道的优化布置结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106051460A (zh) * 2016-07-22 2016-10-26 中国能源建设集团广东省电力设计研究院有限公司 一种火电机组高温再热蒸汽管道的优化布置结构
CN106051460B (zh) * 2016-07-22 2019-07-19 中国能源建设集团广东省电力设计研究院有限公司 一种火电机组高温再热蒸汽管道的优化布置结构

Similar Documents

Publication Publication Date Title
JP6556807B2 (ja) 新型のタービン発電機ユニット
US20130239909A1 (en) Arrangement structure suitable for inverted pulverized coal boiler with ultra-high steam temperature steam parameters
US11002155B2 (en) Pipeline connection system for steam turbine and boiler combination
US20200131925A1 (en) Turbogenerator set
CN203394115U (zh) 基于侧煤仓方案的火力发电厂主厂房布置形式
CN102352696A (zh) 火力发电厂1000mw级机组汽轮发电机组横向结构及布置方法
CN202417620U (zh) 一种大型火力发电厂的汽轮发电机组布置结构
CN202183578U (zh) 一种用于gis母线压力平衡的伸缩节
CN105508234A (zh) 一种核电主泵试验装置
CN205172657U (zh) 由亚临界燃煤发电机组改造的二次再热超超临界机组
CN105155880A (zh) 一种一拖一多轴联合循环火力发电机组的联合厂房低位布置结构
CN201037429Y (zh) 一种新型汽轮发电机组
CN105421831A (zh) 基于联合侧煤仓方案的火力发电厂主厂房布置形式
CN202139876U (zh) 火力发电厂1000mw 级机组汽轮发电机组横向结构
CN104252884A (zh) 核电站一回路主管道安装方法
CN207145025U (zh) 一种机炉紧凑布置的管道连接系统
CN102359398B (zh) 悬吊式高位汽轮发电机平台系统及汽轮发电结构系统
CN202247941U (zh) 汽轮发电机的基础
CN102383869B (zh) 新型汽轮发电机组结构系统
CN211647500U (zh) 一种660mw燃煤发电机组紧凑三列式汽机房的结构
CN205979723U (zh) 一种跨机组回热系统
CN102587699B (zh) 主厂房与锅炉炉架的一体化系统
CN105888745B (zh) 一种汽轮机浮动式阀门支架结构
CN110630056A (zh) 一种660mw燃煤发电机组紧凑三列式汽机房的结构
CN205102103U (zh) 应用于锅炉的过热器

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP ZHEJIANG ELECTRIC P

Free format text: FORMER NAME: ZHEJIANG PROV. ELECTRIC POWER DESIGN INST.

CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee after: Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd

Address before: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee before: Zhejiang Electric Power Design Institute

CX01 Expiry of patent term

Granted publication date: 20120905

CX01 Expiry of patent term