CN202416966U - Anemoscope mounting device for power transmission tower - Google Patents

Anemoscope mounting device for power transmission tower Download PDF

Info

Publication number
CN202416966U
CN202416966U CN2012200172945U CN201220017294U CN202416966U CN 202416966 U CN202416966 U CN 202416966U CN 2012200172945 U CN2012200172945 U CN 2012200172945U CN 201220017294 U CN201220017294 U CN 201220017294U CN 202416966 U CN202416966 U CN 202416966U
Authority
CN
China
Prior art keywords
angle steel
power transmission
steel plate
transmission tower
anemoscope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200172945U
Other languages
Chinese (zh)
Inventor
张广成
张都清
李勃
菅明健
朱宁宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority to CN2012200172945U priority Critical patent/CN202416966U/en
Application granted granted Critical
Publication of CN202416966U publication Critical patent/CN202416966U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relates to an anemoscope mounting device for a power transmission tower, which comprises an internal angle steel plate and an external angle steel plate. Two ends of the internal angle steel plate are riveted with two ends of the external angel steel plate, a plate is welded at the upper edge of the external angel steel plate and used as a cross arm, and a bolt hole for fixing an anemoscope is arranged on an extending portion of the cross arm. When the anemoscope mounting device is specifically used, the two ends of the internal angle steel plate are riveted with the two ends of the external angle steel plate so that angle steel on the power transmission tower is fixedly sandwiched in the middle, and the anemoscope mounting device adapts to angle steel in various specifications by the aid of adjustment of a bolt. The plate is welded at the upper edge of the external angel steel plate to be used as the cross arm, and the extending portion of the cross arm is fixed with the anemoscope by means of bolted connection. Compared with the prior art, the anemoscope mounting device for the power transmission tower is convenient and fast in use, can be reused, and does not damage rods of the power transmission tower.

Description

A kind of anemobiagraph erecting device that is used for power transmission tower
Technical field
The utility model relates to a kind of anemobiagraph erecting device that is used for power transmission tower.
Background technology
Wind load is the important meteorologic parameter that influences transmission line of electricity safety, and wind load increases trolley line stress, and shaft tower produces additional bending moment, can cause the broken string accident of falling the bar.Gentle breeze can cause the vibration of trolley line, makes its fatigue failure broken string.Strong wind can cause the different swings of trolley line, can cause specific condition under that trolley line waves, and causes alternate flashover, even the generation whiplash.Strong wind still is that suspension insulator produces beat, can cause between live part and shaft tower member the electric equipment compartment distance to reduce and flashover takes place.Through anemobiagraph measuring wind value is the most directly measuring method to wind load, therefore for realizing the real-time monitoring of important transmission line of electricity, ensures the transmission line of electricity safe operation, and the installation of on power transmission tower, carrying out anemobiagraph is very necessary.
When power transmission tower was installed anemobiagraph, the construction of often need on the primary structure member of higher position, hole riveted joint or welding had caused high-altitude construction operation difficulty big; Difficult dismounting; Not reproducible use must be carried out the problems such as secondary spraying of anticorrosive paint, simultaneously because member is weakened; Certain influence certainly will be brought to the power transmission tower structural strength, even the safe operation of transmission line of electricity can be threatened.Therefore design a kind of convenient and swiftly, the anemobiagraph erecting device that the reusable while does not damage the power transmission tower rod member is very necessary.
Summary of the invention
The purpose of the utility model is for overcoming the deficiency of above-mentioned prior art, a kind of anemobiagraph erecting device that is used for power transmission tower is provided, and this device is convenient and swift, and the reusable while does not damage the power transmission tower rod member.
For realizing above-mentioned purpose, the utility model adopts following technical proposals:
A kind of anemobiagraph erecting device that is used for power transmission tower comprises the gusset that rivet at inside and outside two two ends, and plate of top edge welding of exterior angle steel plate is provided with the fixedly bolt hole of anemobiagraph as cross-arm on the cross-arm that extends out.
During concrete the application, the utility model adopts inside and outside two gusset two ends riveted way to realize the angle steel double team on the power transmission tower is fixed at mid way, and can adapt to the angle steel of all size through the adjusting of bolt.Plate of the top edge of gusset welding outside partly connects the fixing of realization and anemobiagraph through bolt as cross-arm at the cross-arm that extends out.
At first select the installation site, select the angle steel of the horizontal axis in an outside, confirm corresponding erecting device according to the angle steel placing direction.With inside and outside gusset the angle steel of selecting is clamped, bolton is adopted at two ends.Anemobiagraph base and the cross-arm that stretches to the outside are carried out bolt to be connected realizing and to fix.Compared with prior art, the utility model is convenient and swift, and the reusable while does not damage the power transmission tower rod member.
Description of drawings
Fig. 1 is the utility model embodiment 1 front view;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the utility model embodiment 2 front views;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is the utility model embodiment 3 front views;
Fig. 6 is the left view of Fig. 5;
Fig. 7 is the utility model embodiment 4 front views;
Fig. 8 is the left view of Fig. 7;
Fig. 9 is the angle steel sketch map on the power transmission tower among the embodiment 1;
Wherein gusset, 2. exterior angle steel plate, 3. angle steel, 4. cross-arm, 5. bolts hole in 1..
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Embodiment 1: like Fig. 1,2, shown in 9, the anemobiagraph erecting device of power transmission tower adopts the fixing of inside and outside two gussets, 1,2 two ends riveted way realizations and angle steel 3, and can adapt to the angle steel 3 of all size through the adjusting of bolt.Plate of the top edge of gusset 2 welding outside is as cross-arm 4, and the bolt hole 5 that on the cross-arm that extends out 4, passes on it through bolt connects the fixing of realization and anemobiagraph.
The concrete transformation process of present embodiment:
On the power transmission tower of a 500kVJT41 turriform, carry out the on-line monitoring system Unit Installation, need at the 30m place one anemobiagraph to be installed, this place axially is that the angle cross section disposing way of level is as shown in Figure 3, and specification is L125 * 10.
Installation process is following:
The first step: according to Fig. 1,2 and Fig. 9 select the corresponding structure form.
Second step: adopt the fixing of inside and outside two gussets, 1,2 two ends riveted way realizations and angle steel 3.
The 3rd step: connect the fixing of realization and anemobiagraph through bolt in the cross-arm that extends out 4 parts.
Embodiment 2: like Fig. 3, shown in 4, different with embodiment 1 is inside and outside gusset 1,2 and angle steel 3 towards with embodiment 1 in inside and outside gusset 1,2 and angle steel 3 towards being symmetrical set, other is identical, repeats no more at this.
Embodiment 3: like Fig. 5, shown in 6, different with embodiment 1 is inside and outside gusset 1,2 and angle steel 3 towards with embodiment 1 in being symmetrical set up and down of inside and outside gusset 1,2 and angle steel 3, other is identical, repeats no more at this.
Embodiment 4: like Fig. 7, shown in 8, different with embodiment 3 is inside and outside gusset 1,2 and angle steel 3 towards with embodiment 3 in being symmetrical set of inside and outside gusset 1,2 and angle steel 3, other is identical, repeats no more at this.

Claims (1)

1. an anemobiagraph erecting device that is used for power transmission tower is characterized in that, comprises the gusset of inside and outside two two ends riveted joint, and plate of top edge welding of exterior angle steel plate is provided with the fixedly bolt hole of anemobiagraph as cross-arm on the cross-arm that extends out.
CN2012200172945U 2012-01-13 2012-01-13 Anemoscope mounting device for power transmission tower Expired - Fee Related CN202416966U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200172945U CN202416966U (en) 2012-01-13 2012-01-13 Anemoscope mounting device for power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200172945U CN202416966U (en) 2012-01-13 2012-01-13 Anemoscope mounting device for power transmission tower

Publications (1)

Publication Number Publication Date
CN202416966U true CN202416966U (en) 2012-09-05

Family

ID=46741741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200172945U Expired - Fee Related CN202416966U (en) 2012-01-13 2012-01-13 Anemoscope mounting device for power transmission tower

Country Status (1)

Country Link
CN (1) CN202416966U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216718A (en) * 2013-03-26 2013-07-24 国家电网公司 Anemoscope
CN107587773A (en) * 2017-09-08 2018-01-16 南方电网科学研究院有限责任公司 A mounting bracket and transmission tower for monitoring facilities on transmission tower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216718A (en) * 2013-03-26 2013-07-24 国家电网公司 Anemoscope
CN103216718B (en) * 2013-03-26 2015-10-28 国家电网公司 A kind of anemoscope
CN107587773A (en) * 2017-09-08 2018-01-16 南方电网科学研究院有限责任公司 A mounting bracket and transmission tower for monitoring facilities on transmission tower

Similar Documents

Publication Publication Date Title
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
EP3134643B1 (en) Method and tool for assembling tower elements
CN202416966U (en) Anemoscope mounting device for power transmission tower
CN202260340U (en) Power distribution network overhead line insulation tower head hoisting tool
CN213980159U (en) Single tube communication tower reinforcing apparatus
CN103967318A (en) Universal package ball type node of lattice type steel tube concrete wind power tower
CN101670988A (en) Hoisting tool for electric distribution network overhead wire
CN202831765U (en) Hinged cross arm rush repair tower
CN203161459U (en) Fixing device used for fixing wind power generator tower barrel with platform
CN204609430U (en) Emergent repairing tower tractive hangs connection box
CN102629744B (en) Wire releasing and tightening operation platform of pole and tower
CN110637156B (en) Assembly system and method for assembling a wind turbine
CN202978191U (en) 10kV power distribution line tower lightning arrester
CN203366907U (en) Transformer heat radiator fixing device
CN203640371U (en) Online monitoring system installation device used for power transmission tower
CN201473241U (en) Hoisting tool for overhead lines of power distribution network
CN202737386U (en) Insulator string fixing traction tool
CN202946323U (en) Wind generating set tower cylinder platform connecting device
CN105201213A (en) Telescopic pump pipe for super high-rise concrete filled steel tube lifting
CN202744233U (en) Crawling ladder installing structure of tower-type crane
CN103231711B (en) Cantilever fixing device used for protective and sealed partition door in subway section
CN204992482U (en) Can set up ground wire link plate of angle wantonly
CN209993995U (en) Transmission line shaft tower operation horizontal ladder
CN204098599U (en) A kind of movable cross-arm anchor ear
CN202394995U (en) Solar panel mounting device for power transmission tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121112

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121112

Address after: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Patentee after: Shandong Research Inst. of Electric Power

Patentee after: State Grid Corporation of China

Address before: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Patentee before: Shandong Research Inst. of Electric Power

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20180113

CF01 Termination of patent right due to non-payment of annual fee