CN202416297U - Post-tensioned prestressing construction device for filling pile - Google Patents

Post-tensioned prestressing construction device for filling pile Download PDF

Info

Publication number
CN202416297U
CN202416297U CN2012200021339U CN201220002133U CN202416297U CN 202416297 U CN202416297 U CN 202416297U CN 2012200021339 U CN2012200021339 U CN 2012200021339U CN 201220002133 U CN201220002133 U CN 201220002133U CN 202416297 U CN202416297 U CN 202416297U
Authority
CN
China
Prior art keywords
bearing plate
construction device
post
steel strand
steel stranded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200021339U
Other languages
Chinese (zh)
Inventor
胡长友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Central South Exploration & Foundation Engineering Co Ltd
Original Assignee
Hubei Central South Exploration & Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Central South Exploration & Foundation Engineering Co Ltd filed Critical Hubei Central South Exploration & Foundation Engineering Co Ltd
Priority to CN2012200021339U priority Critical patent/CN202416297U/en
Application granted granted Critical
Publication of CN202416297U publication Critical patent/CN202416297U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a post-tensioned prestressing construction device for a filling pile. The post-tensioned prestressing construction device is characterized by comprising a bearing plate arranged in a pile hole at the bottom of a steel reinforcement cage, wherein a plurality of steel stranded wires extending towards the ground are vertically connected onto the bearing plate; the bottom ends of the steel stranded wires are fixedly connected with the bearing plate through a pier nose; the top ends of the steel stranded wires extend out of the ground; the height of each steel stranded wire is greater than the height of an actual concrete filling surface of the filling pile; a steel stranded wire casing pipe is sleeved at the part between two ends of each steel stranded wire; and the bottom end of the steel stranded wire casing pipe is welded with the bearing plate. According to the post-tensioned prestressing construction device disclosed by the utility model, the bending resistance of the filling pile is improved by using prestress, the reinforcement ratio of the filling pile is reduced and steel reinforcing bars are saved.

Description

Castinplace pile Post-tension Prestress Construction device
Technical field
The utility model relates to a kind of castinplace pile Post-tension Prestress Construction device.
Background technology
In the stake supporting (comprising stake support, piled anchor) that building foundation pit supporting adopted, the moment of flexure that soldier pile bore has directly determined the reinforcement ratio of soldier pile.Because soldier pile is big than the moment of flexure that castinplace pile bore that building foundation adopts; For practicing thrift reinforcing bar; Existing technical scheme is: take segmentation arrangement of reinforcement or inhomogeneous arrangement of reinforcement; But because factors such as stratum, surrounding enviroment, underground water, there is certain uncertainty in the moment of flexure that soldier pile bore, so just causes certain risk.
Summary of the invention
The purpose of the utility model is to overcome the shortcoming of prior art, and a kind of castinplace pile Post-tension Prestress Construction device is provided, and utilizes prestressing force to improve the bending resistance of castinplace pile, and the reinforcement ratio of minimizing castinplace pile is practiced thrift reinforcing bar.
For solving above technical problem; The technical scheme of the utility model is: castinplace pile Post-tension Prestress Construction device; Its difference is: it comprises the bearing plate that is used for being arranged on the reinforcing cage bottom that hole for grout pile installs; Vertically be connected with the many steel strand that extend earthward on the bearing plate, the steel strand bottom is fixedly connected with bearing plate through pier nose, and elevate above the soil in the steel strand top and it is highly greater than the height of the actual concrete spouting face of castinplace pile; Position between the steel strand two ends is with the steel strand sleeve pipe, the bottom of steel strand sleeve pipe and bearing plate welding.
By above scheme, said bearing plate is annular, and its diameter is identical with the reinforcing cage diameter.
The contrast prior art, the beneficial features of the utility model is following:
1), this castinplace pile Post-tension Prestress Construction device, utilize prestressing force to improve the bending resistance of castinplace pile;
2), this castinplace pile Post-tension Prestress Construction device, can reduce the reinforcement ratio of castinplace pile, practice thrift reinforcing bar.
Description of drawings
Fig. 1 is the utility model embodiment overall structure sketch map;
Fig. 2 is the utility model embodiment polycrystalline substance sketch map;
Fig. 3 is the structural representation under the utility model embodiment user mode;
Wherein: 1-bearing plate, 2-steel strand, 3-steel strand sleeve pipe, 4-pier nose, 5-reinforcing cage.
The specific embodiment
Combine accompanying drawing that the utility model is done further explain through the specific embodiment below.
Please refer to Fig. 1, Fig. 2 and Fig. 3; The utility model castinplace pile Post-tension Prestress Construction device; It comprises the bearing plate 1 that is used for being arranged on reinforcing cage 5 bottoms that hole for grout pile installs; Vertically be connected with the many steel strand 2 that extend earthward on the bearing plate 1, steel strand 2 bottoms are fixedly connected with bearing plate 1 through pier nose 4, and elevate above the soil in steel strand 2 tops and it is highly greater than the height of the actual concrete spouting face of castinplace pile; Position between steel strand 2 two ends is with steel strand sleeve pipe 3, the bottom of steel strand sleeve pipe 3 and bearing plate 1 welding.
Preferably, bearing plate 1 is annular, and its diameter is identical with reinforcing cage 5 diameters.
Concrete, 3 colligations of steel strand sleeve pipe are fixed on the reinforcing cage.
A kind of job practices of the utility model embodiment castinplace pile Post-tension Prestress Construction device is: before the castinplace pile perfusion; When reinforcing cage 5 is installed, this castinplace pile Post-tension Prestress Construction device is put into a hole; Steel strand sleeve pipe 3 is welded on the bearing plate and exceeds the actual concrete spouting face of castinplace pile 50cm, enters into steel strand sleeve pipe 3 to prevent concrete.After cast-in-place pile concrete reaches 70% intensity, on Guan Liang, use prestressed anchor that pre-buried steel strand 2 are carried out stretch-draw, castinplace pile is applied prestressing force, thereby improve the castinplace pile bending resistance.
Above content is the further explain that combines concrete embodiment that the utility model is done, and can not assert that the practical implementation of the utility model is confined to these explanations.For the those of ordinary skill of technical field under the utility model, under the prerequisite that does not break away from the utility model design, can also make some simple deduction or replace, all should be regarded as belonging to the protection domain of the utility model.

Claims (2)

1. castinplace pile Post-tension Prestress Construction device; It is characterized in that: it comprises the bearing plate that is used for being arranged on the reinforcing cage bottom that hole for grout pile installs; Vertically be connected with the many steel strand that extend earthward on the bearing plate, the steel strand bottom is fixedly connected with bearing plate through pier nose, and elevate above the soil in the steel strand top and it is highly greater than the height of the actual concrete spouting face of castinplace pile; Position between the steel strand two ends is with the steel strand sleeve pipe, the bottom of steel strand sleeve pipe and bearing plate welding.
2. castinplace pile Post-tension Prestress Construction device as claimed in claim 1, it is characterized in that: said bearing plate is annular, and its diameter is identical with the reinforcing cage diameter.
CN2012200021339U 2012-01-05 2012-01-05 Post-tensioned prestressing construction device for filling pile Expired - Fee Related CN202416297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200021339U CN202416297U (en) 2012-01-05 2012-01-05 Post-tensioned prestressing construction device for filling pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200021339U CN202416297U (en) 2012-01-05 2012-01-05 Post-tensioned prestressing construction device for filling pile

Publications (1)

Publication Number Publication Date
CN202416297U true CN202416297U (en) 2012-09-05

Family

ID=46741076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200021339U Expired - Fee Related CN202416297U (en) 2012-01-05 2012-01-05 Post-tensioned prestressing construction device for filling pile

Country Status (1)

Country Link
CN (1) CN202416297U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410144A (en) * 2013-08-20 2013-11-27 中交二航局第三工程有限公司 Prestressed reinforcement rock-socketed cast-in-place pile and construction method thereof
CN104480947A (en) * 2014-11-24 2015-04-01 江西中恒岩土工程技术有限公司 Construction method of prestress cast-in-place pile and soil cement pile engagement support
CN107012880A (en) * 2017-02-24 2017-08-04 中铁二十五局集团第五工程有限公司 A kind of pile pier structure of the empty rail of suspension type
CN112962590A (en) * 2021-01-28 2021-06-15 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410144A (en) * 2013-08-20 2013-11-27 中交二航局第三工程有限公司 Prestressed reinforcement rock-socketed cast-in-place pile and construction method thereof
CN103410144B (en) * 2013-08-20 2016-02-03 中交二航局第三工程有限公司 Prestressed reinforcement piles set into rock and construction method
CN104480947A (en) * 2014-11-24 2015-04-01 江西中恒岩土工程技术有限公司 Construction method of prestress cast-in-place pile and soil cement pile engagement support
CN107012880A (en) * 2017-02-24 2017-08-04 中铁二十五局集团第五工程有限公司 A kind of pile pier structure of the empty rail of suspension type
CN112962590A (en) * 2021-01-28 2021-06-15 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof
CN112962590B (en) * 2021-01-28 2023-05-23 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN202559345U (en) Bottom-expanded pre-stress anti-floating anchor rod
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN202073114U (en) Splice joint type post-tensioned prestressed foundation structure
CN102330432A (en) Panel-type framework prestressed anchor rod flexible support structure and construction method thereof
CN202416297U (en) Post-tensioned prestressing construction device for filling pile
CN103806462A (en) Power transmission line soil layer steel strand pre-stress expanded-bottom anchor rod foundation
CN103343532B (en) Pre-stressed anchor cable pile-slab wall
CN104832200A (en) Self-adaptive feet-lock bolt integrated device and application method thereof
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN102561212A (en) Method for strengthening vertical crack of single-pillar concrete pier
CN102363957A (en) Post-tensioned pre-stressed compound uplift pile
CN205224025U (en) Prestressing force anti -floating pile
CN202416260U (en) Transverse prestressed reinforced structure of concrete aqueduct
CN103806451A (en) Anchorage-type foundation pit reinforcing structure and construction method thereof
CN202416307U (en) Cast-in-place pile post-tensioning prestressed construction device
CN202194130U (en) Compound pre-stressed anti-pulling pile with enlarged head
CN203034478U (en) Anchor rod/ cable cantilever type retaining wall
CN202936804U (en) Prestressed pile based on post-tensioning method
CN202194131U (en) Partially prestressed cantilever soldier pile
CN204385941U (en) Prestressing force buckling restrained brace
CN102155013A (en) Pre-tensioning prestressed concrete dynamic load pile
CN102409672A (en) Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile
CN202745459U (en) C80 high-intensity concrete large-top-diameter partially prestressed electric pole
CN202194144U (en) Ground pit inclined tension pile
CN201284461Y (en) Apparatus with convenient pre-stress anchor cable anchorage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20180105

CF01 Termination of patent right due to non-payment of annual fee