CN202405661U - Balance installer for mutual inductor - Google Patents

Balance installer for mutual inductor Download PDF

Info

Publication number
CN202405661U
CN202405661U CN2011205273740U CN201120527374U CN202405661U CN 202405661 U CN202405661 U CN 202405661U CN 2011205273740 U CN2011205273740 U CN 2011205273740U CN 201120527374 U CN201120527374 U CN 201120527374U CN 202405661 U CN202405661 U CN 202405661U
Authority
CN
China
Prior art keywords
balance
installer
erector
location
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205273740U
Other languages
Chinese (zh)
Inventor
刘有真
王继元
王丰
庞忠国
王雨凡
惠兆鹏
贾建华
徐晓杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian No1 Instrument Transformer Co Ltd
Original Assignee
Dalian No1 Instrument Transformer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian No1 Instrument Transformer Co Ltd filed Critical Dalian No1 Instrument Transformer Co Ltd
Priority to CN2011205273740U priority Critical patent/CN202405661U/en
Application granted granted Critical
Publication of CN202405661U publication Critical patent/CN202405661U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model relates to a balance installer for a mutual inductor. The balance installer is characterized in that installing holes are arranged at four corners of a positioning plate of the balance installer; a lead screw is arranged in a position of the positioning plate opposite to a primary wiring terminal; the lead screw is penetrated through a T-shaped nut on the positioning plate; and the two ends of the lead screw are respectively connected with a rotating driving mechanism and a thrust bearing box. The balance installer has the characteristics that the balance installer has simple structure and is convenient to operate and time-saving and labor-saving, the application of force is balanced and reliable, the labor intensity of assembly workers is reduced, and the damage of the primary wiring terminal due to the center-of-gravity shift of the mutual inductor in the installation process is avoided.

Description

A kind of instrument transformer balance erector
Technical field
The utility model relates to a kind of assembling instrument transformer and uses device, is particularly suitable for the eccentric instrument transformer balance erector of primary connection terminal of upside-down mounting assembling.
Background technology
At present, the eccentric voltage transformer of installation, particularly primary connection terminal of instrument transformer is installed very difficulty in the transformer substation switch cabinet (or claiming electrical control cubicles); Because instrument transformer Heavy Weight; The eccentric design of primary connection terminal causes assembling centre-of gravity shift, makes that instrument transformer installation gravitational moment is asymmetric, uneven, and the diameter of primary connection terminal insulated column is relatively thin in addition, mechanical strength is low; During installation; Be difficult to the primary connection terminal of inverted voltage transformer is properly inserted in the switch cubicle connection contact box, cause the bending of instrument transformer primary connection terminal insulated column to damage, promptly crackle or fracture laterally appear in primary connection terminal insulated column.Especially lean on a dead lift to install; Not only waste time and energy, also can install that gravitational moment is asymmetric, uneven, the insertion position is inaccurate, not in place, cause the damage of primary connection terminal more easily because of instrument transformer; The transversal crack even the fracture of terminal post appear, and the problem of electric loose contact.The back is whole all to be dropped in the connection contact box on the switch cubicle because the primary connection terminal is installed, and phenomenons such as its damage or loose contact are difficult for coming to light, therefore in equipment puts into operation; Serious electric discharge phenomena can take place in the voltage transformer that damages; Even directly produce sub-high pressure puncture short over the ground, cause that instrument transformer burns, and can cause other power equipment and break down; Great electric operational accident takes place, and directly influences the safe operation of electric power system.
Summary of the invention
The purpose of the utility model is to provide a kind of simple in structure, easy to operate, instrument transformer balance erector that the application of force is balanced.
The technical solution of the utility model is: a kind of instrument transformer balance erector; The four jiaos of places of location-plate that it is characterized in that the balance erector are provided with installing hole; On location-plate, be provided with leading screw with the relative position of instrument transformer primary connection terminal; Leading screw passes the T type nut on the location-plate, and its two ends are connected with the thrust bearing box with rotary drive mechanism respectively.
Described location-plate is a cored slab, the weight that the hollow-core construction of location-plate can lightened plate floor, thus alleviate the weight of balance erector.
Described rotary drive mechanism is the driving handwheel or the electric control mechanism of manually control.
These practical new characteristics are: simple in structure, easy to operate, time saving and energy saving; Alleviate assembler's labour intensity; The application of force is balanced reliable, can not cause the damage of primary connection terminal because of instrument transformer centre-of gravity shift in installation process, guarantees the instrument transformer safe and reliable operation.
Description of drawings
Fig. 1 is this practical new structural representation;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the structural representation of the utility model balance erector electric control mechanism.
Embodiment
Below in conjunction with accompanying drawing the utility model is described further:
As shown in Figure 1, balance erector location-plate 4 usefulness steel plates are processed hollow sheeting, and its four jiaos places are provided with installing hole 19; On location-plate, be provided with leading screw 2; Screw mandrel should be corresponding with the position of the eccentric primary connection terminal of voltage transformer in the position of location-plate, and promptly on the extended line of eccentric primary connection terminal center line, leading screw vertically passes location-plate T type nut 3; Its upper end is connected with rotation hand wheel 1, and the lower end is connected with thrust bearing box 18.The thrust bearing box is mainly to be made up of bearing pedestal 9, bearing 7, bearing cap 6, and leading screw and bearing link together through end ring 8, see Fig. 2.If rotary drive mechanism adopts electric control mechanism, the leading screw upper end then is connected with speed changer 21, motor 22, and motor drives leading screw through gearbox and rotates, and sees Fig. 3.
Utilize the balance erector to be: to close voltage transformer 10 installation sites of opening cashier's office in a shop and be provided with 4 leads 11 with the installation process that instrument transformer is installed in transformer substation switch cabinet 14; The inverted voltage transformer of slinging also moves down along the space that is limited lead; The eccentric primary connection terminal 12 that is provided with of voltage transformer is inserted in the connection contact box 13 on the switch cubicle, realizes being electrically connected with the conductor in the connection contact box.The installing hole 17 at 15 4 jiaos of places of voltage transformer base plate is relative with lead inner bolt hole 16 respectively simultaneously.The balance erector is arranged on the voltage transformer base plate; Thrust bearing box 18 on the balance erector should be relative with the primary connection terminal position of voltage transformer; Installing hole 19 on the location-plate 4 of balance erector is relative with the installing hole on the voltage transformer base plate; With stay bolt 5 pass the installing hole on the balance erector, the installing hole on the voltage transformer base plate is threaded with the lead inner bolt hole, with balance erector, voltage transformer location.Spin balancing erector handwheel 1, screw mandrel 2 drives the thrust bearing boxes and moves down, and to voltage transformer applied thrust equably, voltage transformer moves down, and the primary connection terminal is inserted in the switch cubicle connection contact fully, and formation closely cooperates, and electric contact is reliable.After this part is installed and is finished; Whenever get next stay bolt successively by the diagonal angle order; Change a lag bolt 20 simultaneously the voltage transformer base plate is fixedly connected with lead, unload the balance erector, voltage transformer is fixedly mounted in the space of switch cubicle lead qualification.Making instrument transformer and whole pass open cabinet becomes a firmly integral body, and the external force resistance ability to function is strong, guarantees the product safety reliability service.

Claims (3)

1. instrument transformer balance erector; The four jiaos of places of location-plate that it is characterized in that the balance erector are provided with installing hole; On location-plate, be provided with leading screw with the relative position of instrument transformer primary connection terminal; Leading screw passes the T type nut on the location-plate, and its two ends are connected with the thrust bearing box with rotary drive mechanism respectively.
2. a kind of instrument transformer balance erector according to claim 1 is characterized in that location-plate is a cored slab.
3. a kind of instrument transformer balance erector according to claim 1 is characterized in that rotary drive mechanism is the driving handwheel or the electric control mechanism of manually control.
CN2011205273740U 2011-12-14 2011-12-14 Balance installer for mutual inductor Expired - Fee Related CN202405661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205273740U CN202405661U (en) 2011-12-14 2011-12-14 Balance installer for mutual inductor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205273740U CN202405661U (en) 2011-12-14 2011-12-14 Balance installer for mutual inductor

Publications (1)

Publication Number Publication Date
CN202405661U true CN202405661U (en) 2012-08-29

Family

ID=46703278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205273740U Expired - Fee Related CN202405661U (en) 2011-12-14 2011-12-14 Balance installer for mutual inductor

Country Status (1)

Country Link
CN (1) CN202405661U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103166136A (en) * 2011-12-14 2013-06-19 大连第一互感器有限责任公司 Mutual inductor installation method and equipment
CN103591243A (en) * 2013-12-02 2014-02-19 赵子健 Rotary device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103166136A (en) * 2011-12-14 2013-06-19 大连第一互感器有限责任公司 Mutual inductor installation method and equipment
CN103166136B (en) * 2011-12-14 2016-01-20 大连第一互感器有限责任公司 Mutual inductor installation method and equipment
CN103591243A (en) * 2013-12-02 2014-02-19 赵子健 Rotary device

Similar Documents

Publication Publication Date Title
CN204497630U (en) A kind of highly compatible for circuit breaker and porcelain vase overturns car
CN211201299U (en) Circular rotatory elevating platform of stage
CN103219190B (en) +/-1100kV high-voltage direct current disconnecting switch
CN202405661U (en) Balance installer for mutual inductor
CN102674162A (en) Special lifting device for pneumatic mechanism of circuit breaker
CN105439052A (en) Aerial work platform
CN202848917U (en) Explosion-proof fixed column type slewing crane for low-temperature environment
CN212559306U (en) Novel lifting platform
CN204992958U (en) Large -scale permanent -magnet machine decides, rotor attaches together device
CN202363778U (en) Transformer on-load tap-changer lifting core tool
CN201656340U (en) Tool for replacing supporting insulator of high-voltage tube bus
CN201937192U (en) Power disconnector operating mechanism mounting tool
CN107658785A (en) The pillar insulator quick replacement device of leading screw driving
CN105162045A (en) Trolley special for assembly and disassembly of high-position grounding wire
CN103166136B (en) Mutual inductor installation method and equipment
CN102623155A (en) Integrated plug-pull combined type vacuum on-load tap changer
CN102832074B (en) Earthing switch for direct current valve hall
CN201931453U (en) Maintenance overturn table for high-voltage current transformers
CN211428643U (en) Low-voltage switchgear convenient to dismouting
CN210710389U (en) Built-in manual rail clamping device and rail provided with same
CN201670677U (en) Lifting device for high-altitude maintenance material
CN209804527U (en) GIS keeps apart compound earthing switch convenient to equipment
CN102231483A (en) Hydraulic maintenance tool car
CN202333524U (en) Hoisting support for overhaul of isolating switch
CN205335717U (en) Isolator base dismounting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20181214

CF01 Termination of patent right due to non-payment of annual fee