CN202404779U - Ship power station practical training and estimating device - Google Patents

Ship power station practical training and estimating device Download PDF

Info

Publication number
CN202404779U
CN202404779U CN2011204732477U CN201120473247U CN202404779U CN 202404779 U CN202404779 U CN 202404779U CN 2011204732477 U CN2011204732477 U CN 2011204732477U CN 201120473247 U CN201120473247 U CN 201120473247U CN 202404779 U CN202404779 U CN 202404779U
Authority
CN
China
Prior art keywords
ship
screen
controller
power station
operation screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204732477U
Other languages
Chinese (zh)
Inventor
陈丽黄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang university automation technology research institute
Original Assignee
陈丽黄
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈丽黄 filed Critical 陈丽黄
Priority to CN2011204732477U priority Critical patent/CN202404779U/en
Application granted granted Critical
Publication of CN202404779U publication Critical patent/CN202404779U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a ship power station practical training and estimating device, mainly consisting of a generator operating screen, a load screen, a shore power operating screen, and a ship electric power system emulation computer; wherein the generator operating screen, the load screen, the shore power operating screen, and the ship electric power system simulation computer are connected through a communication network. The ship power station practical training and estimating device of the utility model acts as a semi-physical simulation device, and simulates operations of a ship power station under normal circumstances and under common fault states through physical equipments and a computer simulation technology, so that students can strengthen understanding for the ship power station and automation equipment thereof and can perform post examinations through trainings such as actual operations, trouble shooting, and so on, therefore, practical training and estimation become more convenient.

Description

Ship Power Station real standard apparatus for evaluating
Technical field
The utility model relates to a kind of crewman's of being used for training, examines and is used for the real standard of Ship Power Station technical ability of specialties such as electrical engineering and robotization Marine Engine Engineering, the device of the real standard of course, especially a kind of Ship Power Station real standard apparatus for evaluating.
Background technology
The Ship Power Station is the visual plant of boats and ships; Up to the present the domestic device that does not still have real standard assessment examination aspect, Ship Power Station, crewman, captain must and examine qualifiedly through real standard operation training, and certificate qualifies; Promptly obtaining job qualification certificate can be on duty; Past crewman captain must obtain the certificate of competency through training, examination and can continue on dutyly in the prescribed timelimit, training, examination need by real boats and ships, and training, examination process are complicated.
Therefore, a kind of Ship Power Station real standard apparatus for evaluating that can realize real standard and assessment that need not to go on board is the equipment that domestic this field is badly in need of.
Summary of the invention
The purpose of the utility model is a kind of Ship Power Station real standard apparatus for evaluating that designs for the deficiency that solves above-mentioned technology, as a kind of hardware system of simulating Ship Power Station work, thereby under the situation that need not to go on board, can carry out reality standard and assessment to the student.
The Ship Power Station that the utility model designed real instruction apparatus for evaluating; It mainly is made up of generator operation screen, load screen, bank electricity operation screen and Ship Electrical Power System simulation computer, and said generator operation screen, load screen, bank electricity operation screen link to each other by communication network with the Ship Electrical Power System simulation computer.
As preferably, described generator operation screen mainly is made up of the experiment electrical equipment, touch-screen and the controller A that are positioned on its panel, tests electrical equipment and is electrically connected with controller A, and communication is connected touch-screen with controller A; Controller A links to each other through communication network with the Ship Electrical Power System simulation computer.As preferably, described experiment electrical equipment comprises display gauge head, stop botton, start button, opening button, switch knob, decompression coil, overcurrent coil, potential coil and closing coil.
As preferably, said load screen is provided with ground gas lamp, line insulation table, load main distribution air switch, secondary switchboard and three grades of branch electronic boxs; Wherein, make access resistance include the analog ligand electric switch of all-in resistance in after described secondary switchboard and three grades of branch electronic boxs are respectively established 8 access resistance and 8 closures.
As preferably, described bank electricity operation screen is made up of main switch control flow, shore connection box and bank electric control panel box; On the main switch control flow, be provided with main opening button and main switch knob; Said shore connection box is provided with display gauge head and phase sequence pilot lamp, and said bank electric control panel box is provided with time opening button, inferior switch knob, harbour power supply contactor, bank electricity main switch contactor and controller B; The signal of described main opening button, main switch knob, inferior opening button and inferior switch knob inputs to controller B; Said phase sequence pilot lamp, harbour power supply contactor and the work of bank electricity main switch contactor are controlled in the output of this controller B, and this controller B is connected with the communication of Ship Electrical Power System simulation computer.
The Ship Power Station of the utility model gained real standard apparatus for evaluating; This device is as hardware-in-the-loop simulation device; Through equipment in kind and computer simulation technique, the simulation operation of Ship Power Station under normal condition and most common failure state makes the student can be through the training of aspects such as practical operation, fault eliminating; Reinforcement is to the understanding of Ship Power Station and automation equipment thereof and carry out examination on duty, instructs and assess more convenient in fact.
Description of drawings
Fig. 1 is embodiment 1 structural representation;
Fig. 2 is the synoptic diagram of embodiment 1 generator operation screen;
Fig. 3 is the synoptic diagram of embodiment 1 load screen;
Fig. 4 is the synoptic diagram of embodiment 1 bank electricity operation screen;
Among the figure: generator operation screen 1; Load screen 2; Bank electricity operation screen 3; Ship Electrical Power System simulation computer 4; Communication network 5; Display gauge head 6; Stop botton 7; Start button 8; Opening button 9; Switch knob 10; Decompression coil 11; Overcurrent coil 12; Potential coil 13; Closing coil 14; Ground gas lamp 15; Line insulation table 16; Load main distribution air switch 17; Secondary switchboard 18; Three grades of branch electronic boxs 19; Main switch control flow 20; Shore connection box 21; Bank electric control panel box 22; Phase sequence pilot lamp 23; Inferior opening button 24; Inferior switch knob 25; Main opening button 26; Main switch knob 27; Main switch 28; Touch-screen 29; Analog ligand electric switch 30.
Embodiment
Combine accompanying drawing that the utility model is done further to describe through embodiment below.
Embodiment 1:
As shown in Figure 1; The described Ship Power Station of present embodiment real standard apparatus for evaluating; It mainly is made up of generator operation screen 1, load screen 2, bank electricity operation screen 3 and Ship Electrical Power System simulation computer 4, and said generator operation screen 1, load screen 2, the operation of bank electricity are shielded 3 and linked to each other through communication network 5 with Ship Electrical Power System simulation computer 4;
As shown in Figure 2, described generator operation screen 1 mainly is made up of the experiment electrical equipment, touch-screen and the controller A that are positioned on its panel, and the experiment electrical equipment is electrically connected with controller A, and communication is connected touch-screen 29 with controller A; Controller A links to each other through communication network 5 with Ship Electrical Power System simulation computer 4.Wherein, described experiment electrical equipment comprises display gauge head 6, stop botton 7, start button 8, opening button 9, switch knob 10, decompression coil 11, overcurrent coil 12, potential coil 13 and closing coil 14; Generator operation screen 1 comprises that also isolating switch, isolating transformer, generator build crimping tentaculum KM1 and main switch; Said display gauge head, touch-screen, stop botton, start button, opening button, switch knob, decompression coil, overcurrent coil, potential coil, closing coil are arranged on the panel; The signal of stop botton, start button, opening button, switch knob, isolating switch inputs to said controller A, the break-make of the said decompression coil of controller A output control, overcurrent coil, potential coil, closing coil; Also 4 communications are connected said controller A with the Ship Electrical Power System simulation computer with touch-screen; The three-phase mains is built crimping tentaculum KM1 through said isolating transformer and generator and is connected with main switch 28, and controller A output control generator is built crimping tentaculum KM1 action;
As shown in Figure 3, said load screen 2 is provided with ground gas lamp 15, line insulation table 16, load main distribution air switch 17, secondary switchboard 18 and three grades of branch electronic boxs 19; Wherein, make access resistance include the analog ligand electric switch 30 of all-in resistance in after described secondary switchboard and three grades of branch electronic boxs are respectively established 8 access resistance and 8 closures;
As shown in Figure 4, described bank electricity operation screen 3 is made up of main switch control flow 20, shore connection box 21 and bank electric control panel box 22; On the main switch control flow, be provided with main opening button and main switch knob; Said shore connection box is provided with display gauge head and phase sequence pilot lamp, and said bank electric control panel box is provided with time opening button, inferior switch knob, harbour power supply contactor, bank electricity main switch contactor and controller B; The signal of described main opening button 26, main switch knob 27, inferior opening button 24 and inferior switch knob 25 inputs to controller B; Said phase sequence pilot lamp 23, harbour power supply contactor and the work of bank electricity main switch contactor are controlled in the output of this controller B, and this controller B is connected with 4 communications of Ship Electrical Power System simulation computer.
The characteristics of the described Ship Power Station of present embodiment real standard apparatus for evaluating:
1, the generator of its research and development operation screen 1; Be used to simulate the data and the state demonstration of generator operation; Generator operation control and fault setting; The isolating switch related peripheral circuit of research and development can be simulated the operation of three phase generator output voltage and generator under-voltage, and the nonshared control unit A of the generator operation screen 1 of research and development can be used as the IO interface of simulation computer;
2, it utilizes the special-purpose fault simulation system of code switch exploitation, but the one-level switchboard switch of the tree-like connection of 2 cascaded is shielded in the load of analog development, a plurality of trouble spots of analog insulation, ground connection of secondary switchboard switch, three grades of branch electronic box switches;
3, the nonshared control unit B of the bank of its research and development electricity operation screen 3 links to each other with Ship Electrical Power System simulation computer 4 through communication network 5, as IO interface;
4, Ship Electrical Power System simulation computer 4 is realized the Computer Simulation of Ship Electrical Power System, comprises generator unit, power network, load, generates state, the supplemental characteristic of Ship Electrical Power System operation; Carry out exchanges data through network and generator operation screen 1, load screen 2, bank electricity operation screen 3; Generator operation screen 1, load screen 2, bank electricity operation screen 3 can be set to independent operating mode or on-line execute mode; Ship Electrical Power System simulation computer 4 can be used for system operational parameters setting, fault setting, assessment setting; Make Ship Electrical Power System run on preset failure operation state through fault setting and assessment setting.
Specific embodiment described herein only is that the design to the utility model illustrates.The utility model person of ordinary skill in the field can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, but can't depart from the spirit of the utility model or surmount the defined scope of appended claims.

Claims (5)

1. a Ship Power Station is instructed apparatus for evaluating in fact; It is characterized in that it mainly is made up of generator operation screen, load screen, bank electricity operation screen and Ship Electrical Power System simulation computer, said generator operation screen, load screen, bank be electric to be operated to shield and links to each other through communication network with the Ship Electrical Power System simulation computer.
2. based on the described Ship Power Station of claim 1 real standard apparatus for evaluating; It is characterized in that described generator operation screen mainly is made up of the experiment electrical equipment, touch-screen and the controller A that are positioned on its panel; The experiment electrical equipment is electrically connected with controller A, and communication is connected touch-screen with controller A; Controller A links to each other through communication network with the Ship Electrical Power System simulation computer.
3. Ship Power Station according to claim 2 real standard apparatus for evaluating is characterized in that described experiment electrical equipment comprises display gauge head, stop botton, start button, opening button, switch knob, decompression coil, overcurrent coil, potential coil and closing coil.
4. according to claim 1 or 2 or 3 described Ship Power Stations real standard apparatus for evaluating, it is characterized in that said load screen is provided with ground gas lamp, line insulation table, load main distribution air switch, secondary switchboard and three grades of branch electronic boxs; Wherein, make access resistance include the analog ligand electric switch of all-in resistance in after described secondary switchboard and three grades of branch electronic boxs are respectively established 8 access resistance and 8 closures.
5. according to the real standard of claim 1 or 2 or 3 described Ship Power Stations apparatus for evaluating, it is characterized in that described bank electricity operation screen is made up of main switch control flow, shore connection box and bank electric control panel box; On the main switch control flow, be provided with main opening button and main switch knob; Said shore connection box is provided with display gauge head and phase sequence pilot lamp, and said bank electric control panel box is provided with time opening button, inferior switch knob, harbour power supply contactor, bank electricity main switch contactor and controller B; The signal of described main opening button, main switch knob, inferior opening button and inferior switch knob inputs to controller B; Said phase sequence pilot lamp, harbour power supply contactor and the work of bank electricity main switch contactor are controlled in the output of this controller B, and this controller B is connected with the communication of Ship Electrical Power System simulation computer.
CN2011204732477U 2011-11-24 2011-11-24 Ship power station practical training and estimating device Expired - Fee Related CN202404779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204732477U CN202404779U (en) 2011-11-24 2011-11-24 Ship power station practical training and estimating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204732477U CN202404779U (en) 2011-11-24 2011-11-24 Ship power station practical training and estimating device

Publications (1)

Publication Number Publication Date
CN202404779U true CN202404779U (en) 2012-08-29

Family

ID=46702414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204732477U Expired - Fee Related CN202404779U (en) 2011-11-24 2011-11-24 Ship power station practical training and estimating device

Country Status (1)

Country Link
CN (1) CN202404779U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499752A (en) * 2013-09-13 2014-01-08 镇江科创电气工程有限公司 Portable simulated generator panel
CN105489081A (en) * 2016-01-26 2016-04-13 江苏海事职业技术学院 Practical training system for maintenance of ship power station
CN108663949A (en) * 2018-05-31 2018-10-16 江苏科技大学 A kind of ship shore electric integration semi-physical emulation platform based on dspace

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499752A (en) * 2013-09-13 2014-01-08 镇江科创电气工程有限公司 Portable simulated generator panel
CN103499752B (en) * 2013-09-13 2016-08-03 镇江科创电气工程有限公司 Portable simulation generator panel
CN105489081A (en) * 2016-01-26 2016-04-13 江苏海事职业技术学院 Practical training system for maintenance of ship power station
CN108663949A (en) * 2018-05-31 2018-10-16 江苏科技大学 A kind of ship shore electric integration semi-physical emulation platform based on dspace

Similar Documents

Publication Publication Date Title
CN105894887B (en) A kind of power distribution network simulation training system and method
Barata et al. Consolidating learning in power systems: Virtual reality applied to the study of the operation of electric power transformers
CN103440803B (en) The authentic training system of 10kV power distribution equipment real voltage analog current closed loop
CN103208220B (en) Intelligent type low-voltage is for distribution training system and practical training method thereof
CN103559822A (en) Substation simulation training system
CN109887368A (en) Medium Voltage Switchgear secondary control loop simulation training platform and its programmable logic controller (PLC) logic judging method
CN102881202A (en) Virtual reality based on-load tap switch maintenance training method
CN108198477A (en) Electrical test of transformer simulation teaching system
CN202404779U (en) Ship power station practical training and estimating device
CN110400501B (en) Relay protection teaching and training system
CN103970123A (en) PLC device control program electric test platform and method for flow industrial automatic system
CN203606437U (en) Intelligent transformer transformation-ratio simulation test device
CN103136994B (en) Based on the open architecture PLC Electrical Engineering Practice device of safe voltage
CN203966415U (en) Middle-and-high-ranking low pressure maintenance electrician training checking device
Wang et al. Power system protection education and digital relay training based on a physical platform
CN203607007U (en) Ship power station simulation practical training device
CN103035138B (en) Personnel remote training device
CN109166393A (en) Application method based on intelligent troubleshooting electric cabinet
CN113990132B (en) Power transformation and distribution operation and maintenance integrated training system and training method
CN203673691U (en) Substation training device based on PLC control
CN202771708U (en) Inverted-T-shaped network-type training device of programmable controller
CN203376910U (en) Inverted T-shaped electric control system simulation practical training apparatus
RU2678882C1 (en) Stand for simulating the operation of electrochemical protection systems and stand-based training method
WO2016137422A1 (en) Simulator of the power system of a vessel
CN103065539B (en) Analog console of construction hoist electrical system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhejiang university automation technology research institute

Assignor: Chen Lihuang

Contract record no.: 2013330000113

Denomination of utility model: Ship power station practical training and estimating device

Granted publication date: 20120829

License type: Exclusive License

Record date: 20130426

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
ASS Succession or assignment of patent right

Owner name: ZHEJIANG COLLEGE AUTOMATION TECHNOLOGY INSTITUTE

Free format text: FORMER OWNER: CHEN LIHUANG

Effective date: 20130624

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310013 HANGZHOU, ZHEJIANG PROVINCE TO: 310009 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130624

Address after: 310009, room 21, 301 Yao Temple Lane, Shangcheng District, Zhejiang, Hangzhou

Patentee after: Zhejiang university automation technology research institute

Address before: Hangzhou City, Zhejiang province Binjiang District 310013 shore road 1180 No. 6 5 floor Huaye hi tech Park

Patentee before: Chen Lihuang

EM01 Change of recordation of patent licensing contract

Change date: 20150123

Contract record no.: 2013330000113

Assignee after: Hangzhou Yu Chong Technology Co., Ltd.

Assignee before: Zhejiang university automation technology research institute

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EM01 Change of recordation of patent licensing contract

Change date: 20150126

Contract record no.: 2013330000113

Assignee after: Hangzhou Jue Technology Co Ltd

Assignee before: Hangzhou Yu Chong Technology Co., Ltd.

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20181124