CN202391111U - Layered building step pouring device - Google Patents
Layered building step pouring device Download PDFInfo
- Publication number
- CN202391111U CN202391111U CN2011204379216U CN201120437921U CN202391111U CN 202391111 U CN202391111 U CN 202391111U CN 2011204379216 U CN2011204379216 U CN 2011204379216U CN 201120437921 U CN201120437921 U CN 201120437921U CN 202391111 U CN202391111 U CN 202391111U
- Authority
- CN
- China
- Prior art keywords
- time
- marking time
- building
- layer
- marking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model relates to the technical field of housing construction, and discloses a layered building step pouring device, which comprises a foundation layer base plate formed by pouring reinforced concrete, wherein the foundation layer base plate is provided with a plurality of steps; the steps are correspondingly provided with horizontal step plates; and the uppermost horizontal step plate is consistent with the elevation of a floor. The building step staircase device is stable in structure, avoids step chipping, saves coast and construction time and improves speed.
Description
Technical field
The utility model relates to the technical field of housing construction technology.
Background technology
China's utility model patent number is: 03210712.9 patent discloses a kind of stair; Mainly comprise the pedal more than; Adjacent two step between the seat, front end that one is stepped on the last plane of seat is fastenedly connected the rear end that another steps on a lower plane, is fastenedly connected pedal on the last plane of stepping on.
The job practices that above-mentioned stair adopt is: traditional building is when the construction stair; Generally take bench, mark time and build simultaneously; Because flooring absolute altitude discrepancy in elevation control difficulty is big, riser height is often inconsistent after the floor levelling, therefore needs to beat cutter; Carry out the second time and revise, consistent to guarantee each riser height.Concrete is marked time and is played cutter, wastes time and energy, and wastes bigger.
The utility model content
The utility model purpose aims to provide a kind of building placement layer by layer device of marking time, and this building stair apparatus structure of marking time is more firm, has avoided marking time and has played cutter, practices thrift cost, practices thrift the engineering time, the quickening progress.
For realizing above-mentioned purpose; The technical scheme that the utility model adopts is: a kind of building placement layer by layer device of marking time; Comprise with steel concrete and build the basic unit's base plate that forms; Said basic unit base plate is provided with several and marks time, the said corresponding horizontal step plate that is provided with of marking time, and the horizontal step plate of said the top is consistent with the absolute altitude of flooring.
Said a kind of building placement layer by layer device of marking time, it is marked time and marks time for steel concrete.
Said a kind of building placement layer by layer device of marking time, the overall structure that it is marked time and is formed as one with horizontal step plate.
A kind of building placement layer by layer device placement layer by layer job practices of marking time:
1, when building floor, only build the bench (structure stress part) of board-like (beam type) stair, do not build and mark time.
2, build when deck and finish, after flooring levelling thickness was confirmed, marking time of every layer of five equilibrium build again, makes the every layer of one-shot forming of marking time.
This building stair apparatus structure of marking time is more firm, and this building is marked time the stair device in construction, has avoided in the construction marking time and has played cutter, has also practiced thrift cost simultaneously, has practiced thrift the engineering time, the quickening progress.This device is applicable to building construction, a lot of building construction of especially marking time.This device has been avoided marking time and has been played cutter, has practiced thrift cost, time, has accelerated progress.In the floor and the quantity of marking time were built greatly, advantage was obvious especially.This device is not played cutter to marking time, mark time and build disposable completion, has guaranteed the globality and the aesthetic property of marking time.
Description of drawings
Sketch map in Fig. 1 the utility model specific embodiment.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described.
As shown in Figure 1: a kind of building placement layer by layer device of marking time; Comprise basic unit's base plate 1, mark time 2, horizontal pedal 3, flooring 4; Comprise with steel concrete and build the basic unit's base plate 1 that forms; Said basic unit base plate 1 is provided with several and marks time 2, and said marking time 2 correspondingly is provided with horizontal step plate 3, and the horizontal step plate 3 of said the top is consistent with the absolute altitude of flooring 4.A kind of building placement layer by layer device placement layer by layer job practices of marking time: one, when building floor, only build the bench (structure stress part) of board-like (beam type) stair, do not build and mark time.Two, build when deck and finish, after flooring levelling thickness was confirmed, marking time of every layer of five equilibrium build again, makes the every layer of one-shot forming of marking time.This building stair apparatus structure of marking time is more firm, and this building is marked time the stair device in construction, has avoided in the construction marking time and has played cutter, has also practiced thrift cost simultaneously, has practiced thrift the engineering time, the quickening progress.This device is applicable to building construction, a lot of building construction of especially marking time.This device has been avoided marking time and has been played cutter, has practiced thrift cost, time, has accelerated progress.In the floor and the quantity of marking time were built greatly, advantage was obvious especially.This device is not played cutter to marking time, mark time and build disposable completion, has guaranteed the globality and the aesthetic property of marking time.
A kind of building placement layer by layer device of marking time; Comprise basic unit's base plate 1, mark time 2, horizontal pedal 3, flooring 4; Comprise with steel concrete and build the basic unit's base plate 1 that forms; Said basic unit base plate 1 is provided with several and marks time 2, and said marking time 2 correspondingly is provided with horizontal step plate 3, and the horizontal step plate 3 of said the top is consistent with the absolute altitude of flooring 4.It is marked time and 2 marks time 2 for steel concrete.A kind of building placement layer by layer device placement layer by layer job practices of marking time: one, when building floor, only build the bench (structure stress part) of board-like (beam type) stair, do not build and mark time.Two, build when deck and finish, after flooring levelling thickness was confirmed, marking time of every layer of five equilibrium build again, makes the every layer of one-shot forming of marking time.Said a kind of building placement layer by layer device of marking time, its 2 overall structures of being formed as one with horizontal step plate 3 of marking time.This building stair apparatus structure of marking time is more firm, and this building is marked time the stair device in construction, has avoided in the construction marking time and has played cutter, has also practiced thrift cost simultaneously, has practiced thrift the engineering time, accelerating construction progress.
Claims (3)
1. building placement layer by layer device of marking time; Comprise with steel concrete and build the basic unit's base plate that forms that it is characterized in that, said basic unit base plate is provided with several and marks time; The said corresponding horizontal step plate that is provided with of marking time, the horizontal step plate of said the top is consistent with the absolute altitude of flooring.
2. according to the said a kind of building of the claim 1 placement layer by layer device of marking time, it is characterized in that said marking time marked time for steel concrete.
3. according to the said a kind of building of the claim 1 placement layer by layer device of marking time, it is characterized in that the said overall structure of marking time and being formed as one with horizontal step plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204379216U CN202391111U (en) | 2011-11-08 | 2011-11-08 | Layered building step pouring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204379216U CN202391111U (en) | 2011-11-08 | 2011-11-08 | Layered building step pouring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202391111U true CN202391111U (en) | 2012-08-22 |
Family
ID=46666045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204379216U Expired - Lifetime CN202391111U (en) | 2011-11-08 | 2011-11-08 | Layered building step pouring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202391111U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590550A (en) * | 2013-11-04 | 2014-02-19 | 深圳市建工集团股份有限公司 | Three-step-upward construction method for stairs |
CN107574787A (en) * | 2017-09-13 | 2018-01-12 | 安徽金贺财建筑工程有限公司 | A kind of unrestrained water step and its construction method for shallow water beach |
-
2011
- 2011-11-08 CN CN2011204379216U patent/CN202391111U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590550A (en) * | 2013-11-04 | 2014-02-19 | 深圳市建工集团股份有限公司 | Three-step-upward construction method for stairs |
CN103590550B (en) * | 2013-11-04 | 2015-09-09 | 深圳市建工集团股份有限公司 | Three step construction methods on a kind of stair |
CN107574787A (en) * | 2017-09-13 | 2018-01-12 | 安徽金贺财建筑工程有限公司 | A kind of unrestrained water step and its construction method for shallow water beach |
CN107574787B (en) * | 2017-09-13 | 2019-12-03 | 东阳市琰安建筑工程有限公司 | A kind of unrestrained water step and its construction method for shallow water beach |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103009477B (en) | A kind of factory for prefabrication prefabricated components construction method | |
CN202391111U (en) | Layered building step pouring device | |
CN106351376B (en) | Shed deckhead construction method | |
CN202100027U (en) | Novel pavilion with steel structure outer-wrapped by wood plastic composite | |
CN104929295B (en) | A kind of seamless steel pipe construction method for hyperbolicity arcuated roof | |
CN103498479A (en) | Stepped independent foundation formwork bracing method | |
CN201428240Y (en) | Template with arc steps | |
CN104998998B (en) | Cylindrical reinforcement cage machining method and device | |
CN103967332B (en) | The construction method of a kind of building site enclosing | |
CN105984015B (en) | One collects together sets of brackets on top of the columns prefabricated concrete element preparation method in building in the style of the ancients | |
CN102777026A (en) | Method for constructing ultra-long rear casting plate supporting system by using Bailey frames | |
CN205558475U (en) | Light -duty assembled enclosure in villages and small towns | |
CN206170288U (en) | Vertical combination stair plates mould | |
CN106368387A (en) | Concrete product catching split head for supporting upper layer steel bar | |
CN201972409U (en) | Adjustable leveling bench | |
CN205712820U (en) | A kind of board-like combined staircase | |
CN210263116U (en) | Rapid mounting and dismounting shaping template for concrete reverse filling of lower independent foundation | |
CN110258984B (en) | Manufacturing method of steel-concrete combined stair | |
CN203947570U (en) | A kind of reinforced concrete structure of printing based on 3D | |
CN203834825U (en) | Connection structure of prefabricated stair of overlapped wallboard room | |
CN202731107U (en) | Protective layer cushion block made of high-strength polymer mortar | |
CN108068202A (en) | Vertical Combination stair board mold | |
CN210369630U (en) | Steel-concrete combined stair structure | |
CN202577809U (en) | Precast stair structure | |
CN201231525Y (en) | Concrete precast slab combined biogas pool precast module group |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120822 |