CN202382413U - Fuel gas heat absorption plate - Google Patents

Fuel gas heat absorption plate Download PDF

Info

Publication number
CN202382413U
CN202382413U CN2011204494708U CN201120449470U CN202382413U CN 202382413 U CN202382413 U CN 202382413U CN 2011204494708 U CN2011204494708 U CN 2011204494708U CN 201120449470 U CN201120449470 U CN 201120449470U CN 202382413 U CN202382413 U CN 202382413U
Authority
CN
China
Prior art keywords
heat absorbing
absorbing sheet
heat absorption
endothermic tube
fuel gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204494708U
Other languages
Chinese (zh)
Inventor
杨启林
何正云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Shuangliu geelee energy Polytron Technologies Inc
Original Assignee
CHENGDU SHUANGLIU HANGING HEAT EXCHANGER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU SHUANGLIU HANGING HEAT EXCHANGER Co Ltd filed Critical CHENGDU SHUANGLIU HANGING HEAT EXCHANGER Co Ltd
Priority to CN2011204494708U priority Critical patent/CN202382413U/en
Application granted granted Critical
Publication of CN202382413U publication Critical patent/CN202382413U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Details Of Fluid Heaters (AREA)

Abstract

The utility model relates to a fuel gas heat absorption plate, which is provided with at least a row of heat absorption pipe mounting holes. The fuel gas heat absorption plate is characterized in that the bottom of the heat absorption plate is provided with a plurality of arc convexes concentric to the corresponding heat absorption pipe mounting holes and a plurality of concave cambered surfaces in smooth transition with the adjacent arc convexes, and the distance (A) between the lowest point of each arc convex and the edge of the corresponding concentric heat absorption pipe mounting hole is within 10mm. Using the fuel gas heat absorption plate can reduce copper consumption and improve heat efficiency, and the service life of the fuel gas heat absorption plate can be prolonged.

Description

Heat absorbing sheet is used in combustion gas
Technical field:
The utility model relates to a kind of combustion gas that is used on the gas heater and use heat absorbing sheet.
Background technology:
Heat exchanger on the gas heater is made up of with the endothermic tube that is contained in the endothermic tube installing hole in the heat absorbing sheet tens of heat absorbing sheets by the endothermic tube installing hole.The durability of heat absorbing sheet promptly uses life relations to arrive the service life of heat exchanger, also is the service life that concerns gas heater.At present, the service life of heat absorbing sheet is shorter.
The utility model content:
The purpose of the utility model is can reduce copper material consumption and can improve the combustion gas in the thermal efficiency and service life and use water heater in order to provide a kind of.
The purpose of the utility model realizes like this:
Heat absorbing sheet is used in the utility model combustion gas; At least one row's endothermic tube installing hole is arranged on the heat absorbing sheet; It is characterized in that having on the heat absorbing sheet bottom surface inner concave arc surface of concentric arc convex surface of a plurality of and corresponding endothermic tube installing hole and a plurality of and adjacent arc convex surface rounding off, the minimum point of arc convex surface and concentric with it endothermic tube installing hole Edge Distance A are in 10mm.
The ultimate range B of the above-mentioned adjacent endothermic tube installing hole in heat absorbing sheet middle part is at 14mm.
The intersection point that intersect on the perpendicular bisector of the above-mentioned heat absorbing sheet top adjacent endothermic tube installing hole line of centres and heat absorbing sheet top and the line C at endothermic tube center are in 40mm.
Above-mentioned heat absorbing sheet is provided with shutter, and with flue gas shunting, Heat-collecting effect is better.。
Above-mentioned heat absorbing sheet is provided with fabrication hole, reduces flow of flue gas speed, improves heating rate.
During burning, at first the flame envelope of flame combustion is near the heat absorbing sheet bottom, and generally about 800-1200 ℃, this temperature range receives the influence of combustion system, oxygen supply mode etc. to the temperature of combustion of natural gas; The endothermic tube that after the heat absorbing sheet heat absorption heat transferred and heat absorbing sheet is linked together, endothermic tube with the water in the heat transferred endothermic tube, heats water again.By calculating heat conducting speed on the theory is 10.6 ㎜/S, is to process with copper material and generally do heat absorbing sheet.The fusing point of the price copper material of copper material is 1083 ℃; And natural gas burning flame envelope temperature is about 800-1200 ℃; Temperature with the flame envelope place within will be in 1S passes; Therefore can not surpass 10 ㎜ in minimum point with concentric with it endothermic tube wire arrangement bore edges distance near the arc convex surface of the flame envelope part of combustion flame, otherwise, easy heat absorbing sheet is burnt out or with the copper material sex change of heat absorbing sheet.
The heat absorbing sheet mid portion is because the bottom has absorbed a part of heat; The temperature at middle part will be hanged down; Generally between 500-800 ℃; So the ultimate range B that the adjacent endothermic tube in heat absorbing sheet middle part is installed between hole wall can not surpass 14 ㎜, otherwise, easy heat absorbing sheet is burnt out or with the copper material sex change of heat absorbing sheet.
Heat absorbing sheet top is owing to bottom, middle part have absorbed a part of heat; The temperature on top will more be hanged down; Generally between 110-300 ℃, in general the solstics can be bigger apart from pipe inner wall according to inference, too greatly again waste material; To the absorption of heat with to emit contribution little, so the line C at crossing intersection point in the perpendicular bisector that adopts the heat absorbing sheet top adjacent endothermic tube installing hole line of centres and heat absorbing sheet top and endothermic tube center is in 40mm.
The utility model combustion gas heat absorbing sheet has the following advantages:
1, improve the thermal efficiency greatly;
2, reduce copper material consumption, cost is low, avoids firing bad, prolonged, durable, long service life;
3, easy to process, safe and reliable.
Description of drawings:
Fig. 1 is the utility model structural representation.
Fig. 2 is another structural representation of the utility model.
The specific embodiment:
Embodiment 1:
Fig. 1 has provided present embodiment 1 figure.
Referring to Fig. 1, heat absorbing sheet is used in the present embodiment combustion gas, and two row's endothermic tube installing holes 1 are arranged on the heat absorbing sheet.The inner concave arc surface 3 that concentric arc convex surface of a plurality of and corresponding endothermic tube installing hole 2 and a plurality of and adjacent arc convex surface rounding off are arranged on the heat absorbing sheet bottom surface.The minimum point of arc convex surface and concentric with it endothermic tube installing hole Edge Distance A are in 10mm.The ultimate range B of the adjacent endothermic tube installing hole in heat absorbing sheet middle part is at 14mm.
The intersection point that intersect on the perpendicular bisector of the heat absorbing sheet top adjacent endothermic tube installing hole line of centres and heat absorbing sheet top and the line C at endothermic tube center are in 40mm.
Embodiment 2:
Fig. 2 has provided present embodiment 2 figure.Referring to Fig. 2, present embodiment 2 is basic same with embodiment 1, and not existing together is that heat absorbing sheet is provided with shutter 4, fabrication hole 5.

Claims (6)

1. heat absorbing sheet is used in combustion gas; At least one row's endothermic tube installing hole is arranged on the heat absorbing sheet; It is characterized in that having on the heat absorbing sheet bottom surface inner concave arc surface of concentric arc convex surface of a plurality of and corresponding endothermic tube installing hole and a plurality of and adjacent arc convex surface rounding off, the minimum point of arc convex surface and concentric with it endothermic tube installing hole Edge Distance (A) are in 10mm.
2. heat absorbing sheet is used in combustion gas as claimed in claim 1, and the ultimate range (B) that it is characterized in that the adjacent endothermic tube installing hole in heat absorbing sheet middle part is in 14mm.
3. heat absorbing sheet is used in combustion gas as claimed in claim 1, and the line (C) that it is characterized in that the intersection point that intersects on perpendicular bisector and the heat absorbing sheet top of the heat absorbing sheet top adjacent endothermic tube installing hole line of centres and endothermic tube center is in 40mm.
4. heat absorbing sheet is used in according to claim 1 or claim 2 combustion gas, it is characterized in that heat absorbing sheet is provided with shutter.
5. heat absorbing sheet is used in combustion gas as claimed in claim 3, it is characterized in that heat absorbing sheet is provided with shutter.
6. heat absorbing sheet is used in according to claim 1 or claim 2 combustion gas, it is characterized in that heat absorbing sheet is provided with fabrication hole.
CN2011204494708U 2011-11-15 2011-11-15 Fuel gas heat absorption plate Expired - Lifetime CN202382413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204494708U CN202382413U (en) 2011-11-15 2011-11-15 Fuel gas heat absorption plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204494708U CN202382413U (en) 2011-11-15 2011-11-15 Fuel gas heat absorption plate

Publications (1)

Publication Number Publication Date
CN202382413U true CN202382413U (en) 2012-08-15

Family

ID=46630910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204494708U Expired - Lifetime CN202382413U (en) 2011-11-15 2011-11-15 Fuel gas heat absorption plate

Country Status (1)

Country Link
CN (1) CN202382413U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103743107A (en) * 2014-01-06 2014-04-23 无锡市林志热交换器有限公司 Efficient heat absorption fin for fuel gas wall hanging stove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103743107A (en) * 2014-01-06 2014-04-23 无锡市林志热交换器有限公司 Efficient heat absorption fin for fuel gas wall hanging stove

Similar Documents

Publication Publication Date Title
CN202382413U (en) Fuel gas heat absorption plate
CN202065985U (en) Transversal chain grate boiler with double boiler barrels
CN204027403U (en) A kind of convection type flue gas heat exchange tube
CN201387074Y (en) Methane heating device
CN203980616U (en) High efficiency civil gas heating stove
CN204345727U (en) A kind of energy-saving gas cooker
CN202171332U (en) Heat absorption piece improved structure of gas heat exchanger
CN203687376U (en) Efficient heat absorbing sheet for gas wall-hanging stove
CN106766116B (en) Energy-saving and environment-friendly instant water heater
CN202993558U (en) Combustion-promoting mechanism for horizontal type energy-saving water heater
CN204757671U (en) Heating furnace regenerator that heat transmission effect is good
CN204358777U (en) A kind of Household boiler with honeycomb briquette as fuel
CN205748072U (en) A kind of heat absorption tablet for heat exchanger
CN204574027U (en) A kind of new bio mass-energy powder combustion machine
CN202532426U (en) Dual-purpose machine capable of producing steam and hot water
CN203131899U (en) Energy-saving water heating system used in restaurant kitchen
CN206540302U (en) A kind of hot-blast stove
CN201259246Y (en) Multi-flat water pipe type energy-conserving cooking and heating stove
CN203404969U (en) Improved hot blast heater
CN203443097U (en) Energy-saving environment-friendly boiler
CN208846739U (en) A kind of senior middle school's warm wind furnace
CN202303887U (en) Coal-fired heat-transfer material heater with multilayer roof membrane tube
CN204574446U (en) A kind of novel energy-saving water-heating boiler
CN201191082Y (en) High-efficiency heat absorption fin for gas water heater
CN201191153Y (en) High-efficiency heat absorption fin for gas water heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 610200 Chengdu Shuangliu wall hanging heat exchanger Co., Ltd., Shuangliu industrial port, Chengdu City, Sichuan Province, Sichuan

Patentee after: Chengdu Shuangliu geelee energy Polytron Technologies Inc

Address before: 610200 Chengdu Shuangliu wall hanging heat exchanger Co., Ltd., Shuangliu industrial port, Chengdu City, Sichuan Province, Sichuan

Patentee before: Chengdu Shuangliu Hanging Heat Exchanger Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120815