CN202379547U - Automatic coiling, winding and unwinding machine for overhaul test work grounding wire - Google Patents

Automatic coiling, winding and unwinding machine for overhaul test work grounding wire Download PDF

Info

Publication number
CN202379547U
CN202379547U CN2011205355100U CN201120535510U CN202379547U CN 202379547 U CN202379547 U CN 202379547U CN 2011205355100 U CN2011205355100 U CN 2011205355100U CN 201120535510 U CN201120535510 U CN 201120535510U CN 202379547 U CN202379547 U CN 202379547U
Authority
CN
China
Prior art keywords
roll
grounding wire
winding
twines
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205355100U
Other languages
Chinese (zh)
Inventor
温红旗
李宁
常铁军
王荣亮
万康
房克荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Original Assignee
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Electric Power Corp filed Critical Tianjin Electric Power Corp
Priority to CN2011205355100U priority Critical patent/CN202379547U/en
Application granted granted Critical
Publication of CN202379547U publication Critical patent/CN202379547U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relates to an automatic coiling, winding and unwinding machine for an overhaul test work grounding wire. The automatic coiling, winding and unwinding machine comprises a shell and a hand shank, wherein the hand shank is arranged on the shell; a semi-hidden pressing handle is arranged in a hand shank slot; a resetting back pressure spring is arranged in the pressing handle; a grounding wire inlet and outlet is formed on the shell; a wire coiling shaft is arranged in the shell; a wire coiling shaft driving gear is coaxially arranged at the other end of a mounting shaft of the wire coiling shaft and meshed with a speed change gear; the speed change gear is an outer wheel on a flywheel combination body; exposed teeth on an inner wheel of the flywheel combination body are meshed with a rack; and one end of the rack is connected with the lower end of the pressing handle of the hand shank. The automatic coiling, winding and unwinding machine is a tool special for winding and unwinding the work grounding wire; by using the tool, an overhaul test worker can wind and unwind the work grounding wire on the working site safely, quickly and accurately, and phenomena that the grounding wire is lost, damaged and the like are avoided; and effects of standardizing safety management for the work grounding wire in a transformer substation, guaranteeing neatness of the working site and avoiding potential safety hazard are achieved.

Description

Checking experiment working earthing line twines distributor automatically
Technical field
The utility model relates to the distributor field, and especially a kind of checking experiment working earthing line twines distributor automatically.
Background technology
At substation's maintenance, experimental work scene, working grounding cable is one of important safeguard procedures of support personnel and device security.Owing to be not specifically designed to the device that twines ground wire at present; On the ground coil holder that employed grounding jumper is wrapped on the insulcrete or curves with iron wire in the time of will working for a long time always; Therefore following problem appears easily: 1, be to receive ground wire or put all extremely inconvenience of ground wire; Not only delay work but also mistake, bring great inconvenience to work; 2, will be wrapped in easily on the insulcrete or the ground coil holder on ground wire forget in battery limits, sometimes even be retained on the high-tension apparatus, stay big potential safety hazard to work-site; 3, artificial winding working grounding cable is a kind of unordered winding; After ground wire twined, for preventing the loose setting fastening of also wanting, button was not easy to untie during unwrapping wire; It is in great confusion to tend to make grounding jumper to twine each other; Can't continue to use and destroy, not only influence the field activity progress, but also caused waste, sometimes even delayed interruption maintenance work.
Summary of the invention
The purpose of the utility model is the deficiency that overcomes prior art, provides a kind of reasonable in design, simple in structure, easy to use, can be fast, the checking experiment working earthing line of folding and unfolding ground wire twines distributor automatically in order.
The purpose of the utility model realizes through following technological means:
A kind of checking experiment working earthing line twines distributor automatically, it is characterized in that: comprise housing and handle, handle is installed on the housing; One and half hidden pressure handles are installed in the handle groove, the back-pressure spring that resets is housed in this pressure handle, be shaped on grounding jumper on the housing and import and export; A roll is set in the housing; With roll driven wheel of axle mounting, this roll driven wheel and variable gear mesh on the other end of this roll installation shaft, and this variable gear is the foreign steamer on the flywheel sets zoarium; In the flywheel sets zoarium on the wheel outer grinningly with the tooth bar engagement, an end of this tooth bar and the lower ends of handle pressure handle connect.
And the axial plane of said roll is milled with plug helix, and this plug helix is the semi-circular groove in design grounding jumper cross section 2/5, plug helix and grounding jumper around to identical be clockwise direction.
And, spring bearer plate of the parallel installation of inner walls of 1 centimeters above turnover grounding jumper mouth horizontal saliva is flat, the width of this spring bearer plate is slightly less than roll inwall width, and suppresses with roll axial plane plane and to contact.
And described tooth bar front end is made a spacing preiection, installs one on the inner walls and is used for the spacing preiection of tooth bar is carried out spacing baffle plate.
And, on the housing of grounding jumper import and export, roller bearing is installed.
And the right ends of said housing screw-threaded engagement is respectively installed the exclusion seal cover.
The advantage and the good effect of the utility model are:
1, this distributor drives tooth bar, variable gear and the motion of roll driven wheel through holding pressure handle, thereby grounding jumper is wrapped on the roll.This operating process is very simple, therefore made things convenient for maintenance, testing crew substation's work-site can be safely, folding and unfolding working grounding cable quickly, brought great facility to work.
2, use this distributor can standard substation in the working earthing line safety management, prevent and grounding jumper arbitrarily is wrapped on insulcrete and the iron wire frame and forgets phenomenon, help ensureing the safety in the construction operation at work-site.
3, be shaped on plug helix on the roll of this distributor; And spring bearer plate has been installed on the inner walls, so grounding jumper can be wrapped on the bobbin uniform sequentially under the effect of spring bearer plate along the plug helix direction; Thereby not only improved work efficiency; Shortened the interruption maintenance time, and can also prevent that grounding jumper from damaging, and avoids waste.
4, the utility model be a kind of rational in infrastructure, the design ingenious, the safe in utilization working earthing of checking experiment easily line twine distributor automatically.This distributor is a kind of instrument that is specifically designed to the folding and unfolding working grounding cable; This instrument of use; Can make things convenient for the checking experiment personnel at work-site folding and unfolding working earthing safely, fast and accurately line; Avoid phenomenons such as grounding jumper loss, damage to take place, played working earthing line in the standard substation safety management, ensured that work-site neatly and do not leave over effect such as potential safety hazard.
Description of drawings
Fig. 1 is the cut-away view of the utility model;
Fig. 2 is the structural representation (analysing and observe) of Fig. 1.
The specific embodiment
Be described in detail the embodiment of the utility model below in conjunction with accompanying drawing; Need to prove that present embodiment is narrative, is not determinate, can not limit the protection domain of the utility model with this.
A kind of checking experiment working earthing line twines distributor automatically, comprises housing 5 and handle 6, and handle is installed on the housing, and half the hidden pressure handle 8 is installed in the handle groove, and the back-pressure spring 7 that resets is housed in this pressure handle.The right ends of housing is screw-threaded engagement and exclusion seal cover 16 and 17 are installed respectively.Be shaped on grounding jumper on the housing and import and export 14, roller bearing 15 is installed on the housing of grounding jumper import and export.
A roll 3 is set in the housing; The other end of this roll installation shaft is installed a roll driven wheel 4; This roll driven wheel variable gear 9 that is connected with a joggle; This variable gear is the foreign steamer on the flywheel sets zoarium, in this flywheel sets zoarium on the wheel 10 outer grinningly with tooth bar 12 engagements, an end of this tooth bar and the lower ends of handle pressure handle connect; The front end of this tooth bar is made a spacing preiection 13, installs one on the inner walls and is used for the spacing preiection of tooth bar is carried out spacing baffle plate 11.
In order to make grounding jumper arrange winding in order, mill out semicircular spin slot 18 to opposite side root in a lateral root portion of roll axial plane according to 2/5 of grounding jumper diameter of section, plug helix and grounding jumper around to identical, i.e. clockwise direction (direction shown in the arrow among Fig. 1).
Through a pair of axis hole on the inner walls of the flat top of the horizontal saliva of turnover grounding jumper mouth 1 centimeters, with controlling spring 1 and Asymmetric V-type pressing plate 2 combinations, become spring bearer plate with axostylus axostyle.The wide roll inwall width that is slightly less than of this spring bearer plate, and suppress with roll axial plane plane and to contact.This structure can make grounding jumper along the plug helix direction, is wrapped on the roll uniform sequentially.
During practical implementation, can adjust device according to ground wire cross section, length.To test specialty 2.5mm2 multiply soft copper wire commonly used is design standard, and the design that checking experiment working earthing line twines distributor automatically is 9 layers during with normal use, and 20 meters of length can satisfy the needs of the various work-sites of checking experiment fully.For guaranteeing that ground wire twines the long-term use effect of distributor automatically and not by artificial damage, leaves 1 layer safe handling surplus during design.Payingoff speed is too fast when preventing the bobbin unwrapping wire; Produce inertia and " random line " phenomenon takes place, consider to utilize the gear on the roll during design, the anti-variable gear that drags produces damping and speed limit effect; Controlling under the combined action of spring bearer plate, reach the not purpose of random line that acts freely with winding displacement.
The principle of work of the utility model is:
It is to drive the tooth bar back and forth movement by hold pressure handle at every turn that power produces, and kinetic energy is passed to variable gear through " flute profile " flywheel; Variable gear drives the roll driven wheel and rotates, and grounding jumper is wrapped on the roll.For making grounding jumper arrange winding in order, mill out semicircle " plug helix " to the opposite side root in roll one lateral root portion according to 2/5 of grounding jumper diameter of section, plug helix and grounding jumper around to identical, i.e. clockwise direction.
When regaining grounding jumper; Grounding jumper can be wrapped on the roll along the plug helix direction under the effect of winding displacement control spring bearer plate uniform sequentially, when on the roll behind full ground floor grounding jumper; The first circle of the second layer is to receive that the ground floor wire turn " squeezes " and the combined action of adjacent lines axial wall generation change rail down; Then, under " compacting " of spring bearer plate, each circle of the second layer continues to arrange in order along the groove that forms naturally between the ground floor wire turn, goes round and begins again by that analogy.

Claims (6)

1. a checking experiment working earthing line twines distributor automatically, it is characterized in that: comprise housing and handle, handle is installed on the housing; One and half hidden pressure handles are installed in the handle groove, the back-pressure spring that resets is housed in this pressure handle, be shaped on grounding jumper on the housing and import and export; A roll is set in the housing; With roll driven wheel of axle mounting, this roll driven wheel and variable gear mesh on the other end of this roll installation shaft, and this variable gear is the foreign steamer on the flywheel sets zoarium; In the flywheel sets zoarium on the wheel outer grinningly with the tooth bar engagement, an end of this tooth bar and the lower ends of handle pressure handle connect.
2. a kind of checking experiment working earthing line according to claim 1 twines distributor automatically; It is characterized in that: the axial plane of said roll is milled with plug helix; This plug helix is the semi-circular groove in design grounding jumper cross section 2/5, plug helix and grounding jumper around to identical be clockwise direction.
3. a kind of checking experiment working earthing line according to claim 1 twines distributor automatically; It is characterized in that: spring bearer plate of the parallel installation of inner walls of 1 centimeters above the horizontal saliva of turnover grounding jumper mouth is flat; The width of this spring bearer plate is slightly less than roll inwall width, and suppresses with roll axial plane plane and to contact.
4. a kind of checking experiment working earthing line according to claim 1 twines distributor automatically, and it is characterized in that: described tooth bar front end is made a spacing preiection, installs one on the inner walls and is used for the spacing preiection of tooth bar is carried out spacing baffle plate.
5. a kind of checking experiment working earthing line according to claim 1 twines distributor automatically, it is characterized in that: on the housing of grounding jumper import and export, roller bearing is installed.
6. a kind of checking experiment working earthing line according to claim 1 twines distributor automatically, it is characterized in that: the right ends of said housing screw-threaded engagement is respectively installed the exclusion seal cover.
CN2011205355100U 2011-12-20 2011-12-20 Automatic coiling, winding and unwinding machine for overhaul test work grounding wire Expired - Lifetime CN202379547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205355100U CN202379547U (en) 2011-12-20 2011-12-20 Automatic coiling, winding and unwinding machine for overhaul test work grounding wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205355100U CN202379547U (en) 2011-12-20 2011-12-20 Automatic coiling, winding and unwinding machine for overhaul test work grounding wire

Publications (1)

Publication Number Publication Date
CN202379547U true CN202379547U (en) 2012-08-15

Family

ID=46628065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205355100U Expired - Lifetime CN202379547U (en) 2011-12-20 2011-12-20 Automatic coiling, winding and unwinding machine for overhaul test work grounding wire

Country Status (1)

Country Link
CN (1) CN202379547U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104118774A (en) * 2014-07-23 2014-10-29 君禾泵业股份有限公司 Pedal type wire reel device for electric gardening tool
CN108808507A (en) * 2018-07-11 2018-11-13 北京鼎翰科技有限公司 A kind of outdoor communication distribution box
CN113120705A (en) * 2021-04-20 2021-07-16 大捷智能科技(广东)有限公司 Synchronous cable winding and unwinding devices
CN107863715B (en) * 2017-12-21 2024-02-23 国网河北省电力有限公司衡水供电分公司 Auxiliary installation tool for ground wire

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104118774A (en) * 2014-07-23 2014-10-29 君禾泵业股份有限公司 Pedal type wire reel device for electric gardening tool
CN104118774B (en) * 2014-07-23 2016-07-06 君禾泵业股份有限公司 The pedal wire spool device of electric garden tool
CN107863715B (en) * 2017-12-21 2024-02-23 国网河北省电力有限公司衡水供电分公司 Auxiliary installation tool for ground wire
CN108808507A (en) * 2018-07-11 2018-11-13 北京鼎翰科技有限公司 A kind of outdoor communication distribution box
CN108808507B (en) * 2018-07-11 2019-08-09 河北省通信建设有限公司 A kind of outdoor communication distribution box
CN113120705A (en) * 2021-04-20 2021-07-16 大捷智能科技(广东)有限公司 Synchronous cable winding and unwinding devices

Similar Documents

Publication Publication Date Title
CN202379547U (en) Automatic coiling, winding and unwinding machine for overhaul test work grounding wire
CN206827839U (en) A kind of reciprocal retractable volume machine of high-efficiency cleaning cable laying
CN208916518U (en) A kind of communication cable draw off gear
CN203402757U (en) Geological twisting-preventing wire winder capable of arranging wires evenly
CN104743413A (en) Manual wire payoff and takeup device
CN202729446U (en) Payoff device
CN204237346U (en) Winding device
CN205159940U (en) Cable wiring arrangement
CN202808087U (en) Lead disk for power transmission line grounding resistance measuring megohm meter
CN203536814U (en) Cable wire spool structure of auxiliary winding device for production of switch cabinet
CN207467879U (en) A kind of winding device of power cable
CN204727335U (en) Be provided with the Horizontal pay-off reel of interlock guiding mechanism
CN206789998U (en) Outdoor cable termination
CN203345860U (en) Binding wire manufacturing device
CN204118482U (en) A kind of low voltage draw-out switchgear
CN104914535A (en) Optical fiber loose winding device
CN103332541B (en) A kind of line case of convenient retracted line
CN204650047U (en) Optical fiber pine winding apparatus
CN203094576U (en) Winding device of cables
CN202829163U (en) Electric winder
CN203119230U (en) Automatic winder
CN203326470U (en) Wire-lashing device
CN202704692U (en) Pay-off device used by electrician to connect wires
CN202405562U (en) Automatic spooling device for power line of automation precision calibration test table
CN204624867U (en) A kind of checking experiment working earthing line automatic winding distributor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TIANJIN ELECTRIC POWER CORP.

Effective date: 20130523

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: TIANJIN ELECTRIC POWER CORP.

Effective date: 20130523

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300010 HEBEI, TIANJIN TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130523

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Tianjin Electric Power Corp.

Address before: 300010 Tianjin city Hebei District Wujing Road No. 39

Patentee before: Tianjin Electric Power Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120815