CN202372846U - Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners - Google Patents

Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners Download PDF

Info

Publication number
CN202372846U
CN202372846U CN2011205396280U CN201120539628U CN202372846U CN 202372846 U CN202372846 U CN 202372846U CN 2011205396280 U CN2011205396280 U CN 2011205396280U CN 201120539628 U CN201120539628 U CN 201120539628U CN 202372846 U CN202372846 U CN 202372846U
Authority
CN
China
Prior art keywords
charging
managing
miner
monitoring device
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205396280U
Other languages
Chinese (zh)
Inventor
李臣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Jiangmei Technology Co Ltd
Original Assignee
Xuzhou Jiangmei Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Jiangmei Technology Co Ltd filed Critical Xuzhou Jiangmei Technology Co Ltd
Priority to CN2011205396280U priority Critical patent/CN202372846U/en
Application granted granted Critical
Publication of CN202372846U publication Critical patent/CN202372846U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses an intelligent managing and charging monitoring device for normally-used devices for descending wells of miners, which belongs to coal mine managing devices and comprises a managing cabinet body. A plurality of electronically-controlled boxes for storing normally-used devices for descending wells of each miner are arranged in the managing cabinet body in divided mode, a set of detection substation is respectively installed in each electronically-controlled box, the detection substations are connected onto a master control computer through an RS422 communication port, charging state, charging time and off-shelf time of the devices stored in each electronically-controlled box are checked through the master control computer in real time, simultaneously data are stored in a database for inquiring and statistics. The intelligent managing and charging monitoring device has the advantages of being simple in system structure, complete in function and strong in practical applicability and achieving managing intellectualization of miner lights, portable instruments and self-rescuers.

Description

Miner go into the well common equipment intelligent management and charging monitoring device
Technical field
The utility model relates to a kind of colliery management equipment, specifically is go into the well common equipment intelligent management and charging monitoring device of a kind of miner.Be mainly used in the go into the well indispensable common equipment of going into the well of coal miners such as alarm, mine lamp, self-rescuer of usefulness of miner is implemented unified storage and managenent and used.
Background technology
Alarm, mine lamp and self-rescuer are the indispensable common equipments of going into the well of coal miner, do not have management equipment at present, lean on labor management, cause to face when going into the well sometimes and pinpoint the problems, and like phenomenons such as mine lamp charging deficiencies, influence carrying out smoothly of work.In order to adapt to coal industry to mechanization and automation direction development, guarantee the miner's safety under the coal mine, the utmost point needs the management system to the indispensable equipment of portable appearance, mine lamp and self-rescuer coal miner.The present position and the running status that make managerial personnel can check alarm, mine lamp, self-rescuer at any time, the security and the reliability of lifting miner common equipment eliminate safe hidden trouble.
Summary of the invention
For addressing the above problem, the utility model provides a kind of miner go into the well common equipment intelligent management and charging monitoring device.
The utility model is realized with following technical scheme: a kind of miner go into the well common equipment intelligent management and charging monitoring device; Comprise management cabinet cabinet; Cut apart in the management cabinet cabinet a plurality of go into the well electric cabinets of common equipment of each miner that are used to deposit are arranged; In each electric cabinet, respectively install one and detect substation, detect substation and be connected on the master control computer through RS422 communication interface and CAN bus, through storage equipment in each electric cabinet of master control computer real time inspection charged state, duration of charging, leave the frame time; Simultaneously data storage is advanced database, be convenient to inquiry, statistics.Each detects substation and comprises a mine lamp charging socket; An alarm charging socket; A mine lamp data acquisition of gathering the mine lamp charging state detects administration module; The alarm data acquisition of a collection alarm charged state detects administration module, and a self-rescuer data acquisition detects administration module, and each data acquisition detects administration module and is connected with the master control computer with the CAN bus through the RS422 communication interface respectively.Through storage equipment in each electric cabinet of master control computer real time inspection charged state, duration of charging, from the frame time, simultaneously data storage is advanced database.
Principle of work: mine lamp, alarm, self-rescuer are left concentratedly in electrical control cubicles; Through gathering substation the state of each charge apparatus is collected; And be connected on the master control computer (operating mode machine) through the RS422 communication interface; Carry out unified management through upper computer software, the charged state in each cupboard of real time inspection, duration of charging, from the frame time are advanced database with data storage simultaneously.Total system can realize unmanned by the computer unified management.Through system software, managerial personnel can check the situation that deposits, withdraws and portable appearance, the charge condition of mine lamp, charging times, the time of self-rescuer at any time.Can calculate the serviceable life of instrument battery successively.Charging through to instrument is still added up from the frame state automatically, can show miner's whereabouts and implement attendance management.
The beneficial effect of the utility model is: can portable appearance, mine lamp, self-rescuer unification be deposited, a key just can solve safety problem, realizes miner go into the well the automatically-monitored of common equipment and management, and is laborsaving, save time, and eliminated the labor management that falls behind.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Fig. 1 is a management cabinet synoptic diagram;
Fig. 2 is Intelligent Measurement and charging management system electricity theory diagram.
Among the figure: 1, management cabinet cabinet, 2, electric cabinet.
Embodiment
As shown in Figure 1, go into the well common equipment intelligent management and charging monitoring device of miner comprises management cabinet cabinet 1, and cutting apart in the management cabinet cabinet has a plurality of go into the well electric cabinets 2 of common equipment of each miner that are used to deposit.The quantity of electric cabinet 2 can be made 60-72 as requested, and whole cabinet is used the steel plate impact briquetting, outside plastic-blasting.Can also in management cabinet cabinet 1, the air draft heat sink be installed, keep temperature and cleanliness in the cabinet.
As shown in Figure 2; One cover respectively is installed in each electric cabinet is detected substation; Detecting substation is connected on the master control computer through the RS422 communication interface; Through storage equipment in each electric cabinet of master control computer real time inspection charged state, duration of charging, from the frame time, simultaneously data storage is advanced database, be convenient to inquiry, statistics.Each detects substation and comprises a mine lamp charging socket; An alarm charging socket; A mine lamp data acquisition of gathering the mine lamp charging state detects administration module; The alarm data acquisition of a collection alarm charged state detects administration module, and a self-rescuer data acquisition detects administration module, and each data acquisition detects administration module and is connected with the master control computer with the CAN bus through the RS422 communication interface respectively.Can also on each electric cabinet, pilot lamp be installed, display instrument whether is full of electricity and whether charged state is normal, and pilot lamp detects administration module with corresponding information acquisition and connects.
The every cover of present embodiment detects the substation Implemented by Using Single-chip Processor as front end data acquisition and processing.Each electric cabinet collects through the state of data acquisition detection administration module with each Charging Instrument; All then electric cabinets are connected on the master control computer through the RS422 communication interface again; Carry out unified management through the master control computer software; Charged state in each electric cabinet of real time inspection, duration of charging, from the frame time, simultaneously data storage is advanced database, to inquire about the work after and the usefulness of statistics.

Claims (2)

1. go into the well common equipment intelligent management and charging monitoring device of a miner; It is characterized in that; Comprise management cabinet cabinet (1); Cutting apart in the management cabinet cabinet has a plurality of go into the well electric cabinets (2) of common equipment of each miner that are used to deposit, and in each electric cabinet, respectively installs one and detects substation, detects substation and is connected with the master control computer with the CAN bus through the RS422 communication interface and is connected.
2. miner according to claim 1 go into the well common equipment intelligent management and charging monitoring device; It is characterized in that; Each detects substation and comprises a mine lamp charging socket; An alarm charging socket, a mine lamp data acquisition of gathering the mine lamp charging state detects administration module, and the alarm data acquisition of a collection alarm charged state detects administration module; A self-rescuer data acquisition detects administration module, and each data acquisition detects administration module and is connected with the master control computer through the RS422 communication interface respectively.
CN2011205396280U 2011-12-21 2011-12-21 Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners Expired - Lifetime CN202372846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205396280U CN202372846U (en) 2011-12-21 2011-12-21 Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205396280U CN202372846U (en) 2011-12-21 2011-12-21 Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners

Publications (1)

Publication Number Publication Date
CN202372846U true CN202372846U (en) 2012-08-08

Family

ID=46596543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205396280U Expired - Lifetime CN202372846U (en) 2011-12-21 2011-12-21 Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners

Country Status (1)

Country Link
CN (1) CN202372846U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102419587A (en) * 2011-12-21 2012-04-18 徐州江煤科技有限公司 Intelligent management and charging monitoring device for miner descent equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102419587A (en) * 2011-12-21 2012-04-18 徐州江煤科技有限公司 Intelligent management and charging monitoring device for miner descent equipment

Similar Documents

Publication Publication Date Title
CN203101971U (en) Coal mine safe production comprehensive monitoring platform
CN105446197B (en) A kind of column control ground critical data detection device
CN202383262U (en) LS-SM-based underground monitoring substation power supply safety early warning system
CN204118780U (en) Intelligent charge cabinet
CN201851162U (en) Wireless monitoring device for coal mine roof separation layer
CN209387791U (en) Ring network cabinet line fault Position monitoring devices
CN204156581U (en) A kind of collecting and distributing type lithium battery management system
CN201947016U (en) Open type intelligent mining lamp charging cabinet
CN202372846U (en) Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners
CN202153309U (en) Remote management device for oil well in oil field
CN103853110A (en) Underground coal mine personnel supervision system
CN102419587A (en) Intelligent management and charging monitoring device for miner descent equipment
CN205229000U (en) City haze monitoring system based on GPRS
CN206117723U (en) Gasoline generating set remote monitering system based on wireless network
CN201837705U (en) Fault acquisition device based on wireless communication and solar power supply
CN204330009U (en) Based on the cable shaft status safety monitoring system of Internet of Things and GIS
CN204858734U (en) Novel intelligence integration power supply monitoring system
CN201116979Y (en) Wireless transmission coal mine safety monitoring control device
CN203232290U (en) GPRS wireless remote measurement and control terminal
CN205120927U (en) Generating set remote monitoring device
CN208571635U (en) A kind of mine lamp intelligent charge cabinet and its management system
CN202948306U (en) Supervision system for coal mine underground persons
CN208818331U (en) A kind of transformer online monitoring device based on vibration
CN202731997U (en) Three-dimensional dynamic management combined equipment of gas
CN202446688U (en) Zigbee wireless intelligent fire control evacuation indication lamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120808