CN102419587A - Intelligent management and charging monitoring device for miner descent equipment - Google Patents

Intelligent management and charging monitoring device for miner descent equipment Download PDF

Info

Publication number
CN102419587A
CN102419587A CN201110432178XA CN201110432178A CN102419587A CN 102419587 A CN102419587 A CN 102419587A CN 201110432178X A CN201110432178X A CN 201110432178XA CN 201110432178 A CN201110432178 A CN 201110432178A CN 102419587 A CN102419587 A CN 102419587A
Authority
CN
China
Prior art keywords
miner
charging
management
cabinet
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110432178XA
Other languages
Chinese (zh)
Inventor
李臣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Jiangmei Technology Co Ltd
Original Assignee
Xuzhou Jiangmei Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Jiangmei Technology Co Ltd filed Critical Xuzhou Jiangmei Technology Co Ltd
Priority to CN201110432178XA priority Critical patent/CN102419587A/en
Publication of CN102419587A publication Critical patent/CN102419587A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention discloses an intelligent management and charging monitoring device for miner descent equipment, and belongs to coal mine management equipment. The device comprises a management cabinet body, wherein the management cabinet body is divided into a plurality of electric cabinets for storing all miner descent common equipment; all the electric cabinets are provided with a set of detection substation respectively; the detection substations are connected to a master control computer through an RS422 communication interface; and the master control computer is used for examining the charging condition, charging time and frame departing time of storing equipment in each electric cabinet in real time and storing data into a database simultaneously to make the data conveniently inquired and countered. The invention has the advantages that: the device has a simple system structure, complete functions and high practicability; and miner lamps, portable instruments and self-rescuers can be managed in an intellectualized manner.

Description

A kind of miner goes into the well with device intelligence management and charging monitoring device
Technical field
The present invention relates to a kind of colliery management equipment, specifically is that a kind of miner goes into the well with device intelligence management and charging monitoring device.Be mainly used in the go into the well indispensable common equipment of going into the well of coal miners such as alarm, mine lamp, self-rescuer of usefulness of miner is implemented unified storage and managenent and used.
Background technology
Alarm, mine lamp and self-rescuer are the indispensable common equipments of going into the well of coal miner, do not have management equipment at present, lean on labor management, cause to face when going into the well sometimes and pinpoint the problems, and like phenomenons such as mine lamp charging deficiencies, influence carrying out smoothly of work.In order to adapt to coal industry to mechanization and automation direction development, guarantee the miner's safety under the coal mine, the utmost point needs the management system to the indispensable equipment of portable appearance, mine lamp and self-rescuer coal miner.The present position and the running status that make managerial personnel can check alarm, mine lamp, self-rescuer at any time, the security and the reliability of lifting miner common equipment eliminate safe hidden trouble.
Summary of the invention
For addressing the above problem, the present invention provides a kind of miner to go into the well with device intelligence management and charging monitoring device.
The present invention realizes with following technical scheme: a kind of miner goes into the well with device intelligence management and charging monitoring device; Comprise management cabinet cabinet; Cut apart in the management cabinet cabinet a plurality of go into the well electric cabinets of common equipment of each miner that are used to deposit are arranged; One cover respectively is installed in each electric cabinet is detected substation, detect substation and be connected on the master control computer through the RS422 communication interface, through storage equipment in each electric cabinet of master control computer real time inspection charged state, duration of charging, from the frame time; Simultaneously data storage is advanced database, be convenient to inquiry, statistics.Each detects substation and comprises a mine lamp charging socket; An alarm charging socket; A mine lamp data acquisition of gathering the mine lamp charging state detects administration module; The alarm data acquisition of a collection alarm charged state detects administration module, and a self-rescuer data acquisition detects administration module, and each data acquisition detects administration module and is connected with the master control computer through the RS422 communication interface respectively.
Principle of work: mine lamp, alarm, self-rescuer are left concentratedly in electrical control cubicles; Through gathering substation the state of each charge apparatus is collected; And be connected on the master control computer (operating mode machine) through the RS422 communication interface; Carry out unified management through upper computer software, the charged state in each cupboard of real time inspection, duration of charging, from the frame time are advanced database with data storage simultaneously.Total system can realize unmanned by the computer unified management.Through system software, managerial personnel can check the situation that deposits, withdraws and portable appearance, the charge condition of mine lamp, charging times, the time of self-rescuer at any time.Can calculate the serviceable life of instrument battery successively.Charging through to instrument is still added up from the frame state automatically, can show miner's whereabouts and implement attendance management.
The invention has the beneficial effects as follows: can portable appearance, mine lamp, self-rescuer unification be deposited, a key just can solve safety problem, realizes miner go into the well the automatically-monitored of common equipment and management, and is laborsaving, save time, and eliminated the labor management that falls behind.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Fig. 1 is a management cabinet synoptic diagram;
Fig. 2 is Intelligent Measurement and charging management system electricity theory diagram.
Among the figure: 1, management cabinet cabinet, 2, electric cabinet.
Embodiment
As shown in Figure 1, a kind of miner goes into the well and comprises management cabinet cabinet 1 with device intelligence management and charging monitoring device, and cutting apart in the management cabinet cabinet has a plurality of go into the well electric cabinets 2 of common equipment of each miner that are used to deposit.The quantity of electric cabinet 2 can be made 60-72 as requested, and whole cabinet is used the steel plate impact briquetting, outside plastic-blasting.Can also in management cabinet cabinet 1, the air draft heat sink be installed, keep temperature and cleanliness in the cabinet.
As shown in Figure 2; In each electric cabinet, respectively install one and detect substation; Detecting substation is connected on the master control computer through the RS422 communication interface; Through storage equipment in each electric cabinet of master control computer real time inspection charged state, duration of charging, from the frame time, simultaneously data storage is advanced database, be convenient to inquiry, statistics.Each detects substation and comprises a mine lamp charging socket; An alarm charging socket; A mine lamp data acquisition of gathering the mine lamp charging state detects administration module; The alarm data acquisition of a collection alarm charged state detects administration module, and a self-rescuer data acquisition detects administration module, and each data acquisition detects administration module and is connected with the master control computer through the RS422 communication interface respectively.Can also on each electric cabinet, pilot lamp be installed, display instrument whether is full of electricity and whether charged state is normal, and pilot lamp detects administration module with corresponding information acquisition and connects.
Each detects the substation Implemented by Using Single-chip Processor as front end data acquisition and processing present embodiment.Each electric cabinet collects through the state of data acquisition detection administration module with each Charging Instrument; All then electric cabinets are connected on the master control computer through the RS422 communication interface again; Carry out unified management through the master control computer software; Charged state in each electric cabinet of real time inspection, duration of charging, from the frame time, simultaneously data storage is advanced database, to inquire about the work after and the usefulness of statistics.

Claims (2)

1. a miner goes into the well with device intelligence management and charging monitoring device; It is characterized in that; Comprise management cabinet cabinet (1); Cutting apart in the management cabinet cabinet has a plurality of go into the well electric cabinets (2) of common equipment of each miner that are used to deposit, and a cover respectively is installed in each electric cabinet is detected substation, detects substation and is connected on the master control computer through the RS422 communication interface; Through storage equipment in each electric cabinet of master control computer real time inspection charged state, duration of charging, from the frame time, simultaneously data storage is advanced database.
2. a kind of miner according to claim 1 goes into the well with device intelligence management and charging monitoring device; It is characterized in that; Each detects substation and comprises a mine lamp charging socket; An alarm charging socket, a mine lamp data acquisition of gathering the mine lamp charging state detects administration module, and the alarm data acquisition of a collection alarm charged state detects administration module; A self-rescuer data acquisition detects administration module, and each data acquisition detects administration module and is connected with the master control computer through the RS422 communication interface respectively.
CN201110432178XA 2011-12-21 2011-12-21 Intelligent management and charging monitoring device for miner descent equipment Pending CN102419587A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110432178XA CN102419587A (en) 2011-12-21 2011-12-21 Intelligent management and charging monitoring device for miner descent equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110432178XA CN102419587A (en) 2011-12-21 2011-12-21 Intelligent management and charging monitoring device for miner descent equipment

Publications (1)

Publication Number Publication Date
CN102419587A true CN102419587A (en) 2012-04-18

Family

ID=45944031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110432178XA Pending CN102419587A (en) 2011-12-21 2011-12-21 Intelligent management and charging monitoring device for miner descent equipment

Country Status (1)

Country Link
CN (1) CN102419587A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255882A (en) * 2018-10-08 2019-01-22 淮南矿业(集团)有限责任公司 A kind of portable equipment transmitting-receiving management system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101662050A (en) * 2008-09-04 2010-03-03 深圳市海洋王照明科技股份有限公司 Equipment for managing mining lamp charging and implementation method thereof
CN101684912A (en) * 2008-09-28 2010-03-31 海洋王照明科技股份有限公司 Mine lamp charging monitoring method and system
CN102214329A (en) * 2010-04-01 2011-10-12 青岛高校信息产业有限公司 Intelligent management system of miner's lamp
CN202372846U (en) * 2011-12-21 2012-08-08 徐州江煤科技有限公司 Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101662050A (en) * 2008-09-04 2010-03-03 深圳市海洋王照明科技股份有限公司 Equipment for managing mining lamp charging and implementation method thereof
CN101684912A (en) * 2008-09-28 2010-03-31 海洋王照明科技股份有限公司 Mine lamp charging monitoring method and system
CN102214329A (en) * 2010-04-01 2011-10-12 青岛高校信息产业有限公司 Intelligent management system of miner's lamp
CN202372846U (en) * 2011-12-21 2012-08-08 徐州江煤科技有限公司 Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255882A (en) * 2018-10-08 2019-01-22 淮南矿业(集团)有限责任公司 A kind of portable equipment transmitting-receiving management system

Similar Documents

Publication Publication Date Title
CN203101971U (en) Coal mine safe production comprehensive monitoring platform
CN204256042U (en) A kind of for line loss and monitoring analysis system of opposing electricity-stealing
CN204930572U (en) A kind of Multifunction Intelligent bracelet
CN202383262U (en) LS-SM-based underground monitoring substation power supply safety early warning system
CN104266681A (en) Electric cable well state safety monitoring system based on Internet of Things and GIS
CN103138635A (en) Solar photovoltaic power generation intelligent monitoring system
CN201947016U (en) Open type intelligent mining lamp charging cabinet
CN103853110A (en) Underground coal mine personnel supervision system
CN202372846U (en) Intelligent managing and charging monitoring device for normally-used devices for descending wells of miners
CN206117723U (en) Gasoline generating set remote monitering system based on wireless network
CN108616152A (en) A kind of mine lamp intelligent charge cabinet and its management system
CN203054580U (en) Safety production monitoring and scheduling system base on coal mine mobile private network
CN102419587A (en) Intelligent management and charging monitoring device for miner descent equipment
CN202333901U (en) Intelligent cabinet-type mine lamp charging rack
CN108021123A (en) A kind of failure detector of portable car-mounted data collector
CN204330009U (en) Based on the cable shaft status safety monitoring system of Internet of Things and GIS
CN201116979Y (en) Wireless transmission coal mine safety monitoring control device
CN203324728U (en) Infrared monitoring system for electric power tool cabinet
CN205120927U (en) Generating set remote monitoring device
CN202384840U (en) Automated mine distribution monitoring system
CN208571635U (en) A kind of mine lamp intelligent charge cabinet and its management system
CN105158583B (en) Resident's ammeter remote power feeding acquisition device with lightning monitoring function
CN208818331U (en) A kind of transformer online monitoring device based on vibration
CN204156581U (en) A kind of collecting and distributing type lithium battery management system
CN202948306U (en) Supervision system for coal mine underground persons

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120418