Prior art keywords
vertical type
boiler
coal dust
forced circulation
temperature economizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205356620U
Other languages
Chinese (zh)
Inventor
王欢
王民发
郎凤娥
郎鹏德
韩涛
杜铭华
赵红卫
贾德威
任彦斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Environmental Science Research Institute Co Ltd Beijing Zhongaotong
Original Assignee
SHANXI LANTIAN ENVIRONMANTAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI LANTIAN ENVIRONMANTAL ENGINEERING Co Ltd filed Critical SHANXI LANTIAN ENVIRONMANTAL ENGINEERING Co Ltd
Priority to CN2011205356620U priority Critical patent/CN202371872U/en
Application granted granted Critical
Publication of CN202371872U publication Critical patent/CN202371872U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a coal dust combustion boiler, in particular to a vertical type tube derivative forced circulation coal dust combustion hot-water boiler. By the vertical type tube derivative forced circulation coal dust combustion hot-water boiler, the problems that the conventional vertical type coal dust boiler has a complex system and much corollary equipment are solved. The vertical type tube derivative forced circulation coal dust combustion hot-water boiler comprises a vertical type hearth water-cooling wall heating surface and a convection flue arranged on the rear side of the vertical type hearth water-cooling wall heating surface, wherein a flame breaking wall is arranged on a rear wall of the upper part of the vertical type hearth water-cooling wall heating surface; a high-temperature economizer, an intermediate-temperature economizer and a low-temperature economizer are arranged in the convection flue sequentially from top to bottom; the upper part of the convection flue is communicated with the upper part of the vertical type hearth water-cooling wall heating surface; and a convection tube bundle passes through the high-temperature economizer, the intermediate-temperature economizer and the low-temperature economizer sequentially from bottom to top. By the vertical type tube derivative forced circulation coal dust combustion hot-water boiler, the problems that the conventional vertical type coal dust boiler has the complex system and much corollary equipment are solved, so the vertical type tube derivative forced circulation coal dust combustion hot-water boiler is suitable for medium-sized industrial boilers.

Description

The vertical tube formula forced circulation coal dust firing hot-water boiler that spreads out
Technical field
The utility model relates to pulverized coal firing boiler, specifically is a kind of vertical tube formula forced circulation coal dust firing hot-water boiler that spreads out.
Background technology
The coal-burned industrial boiler of knowing at present mainly comprises grate firing boiler and fluidized bed boiler.Wherein, grate firing boiler is meant that certain thickness fuel bed at the boiler that fire grate (or claiming fire grate) upward burns, is also referred to as the grate stove.Fluidized bed boiler is the particle that the raw coal fragmentation is become a certain size, utilizes the Boiling Combustion mode, makes coal in so-called ebullated bed motion and burning, and fluidized bed boiler is also referred to as fluidized-bed combustion boiler.Grate firing boiler technology maturation, shortcoming are that efficiency of combustion is low, and be seriously polluted.The fluidized bed boiler efficiency of combustion is higher, but at present technology is ripe not enough, especially is applied on the Industrial Boiler not too successfully, and the flue gas after-treatment system is complicated, and cost is higher.The pollutant emission of these two big types of boilers all is difficult to satisfy big and medium-sized cities (one, two type of area) governance for reaching standard requirement under present condition.Therefore, the inaccurate coal-burning boiler that uses in urban district is all stipulated in many big and medium-sized cities, only certainly uses fuel oil, gas fired-boiler, and fuel oil, gas fired-boiler be because fuel cost is several times as much as fire coal, and limited to by fuel source, is difficult to large tracts of land and promotes the use of.
Coal dust firing is one of high performance clean burning mode of the coal of generally acknowledging, and its efficiency of combustion can reach more than 91% usually, and stove inner tissue burns simultaneously, and the maintenance task is few.Be that other combustion system institute is unapproachable.Pulverized coal combustion also is the combustion technology of a maturation; On large-sized station boiler, use quite general; And long-term history arranged; Just because the limitation of economic development and science and technology, receive cost height, uncontrollable atmosphere pollution initial ejection concentration and pollute the restriction of aspects such as the thing discharging is serious, make this clean burning technology on the medium-scale industry boiler, not obtain good application for a long time.In order on Industrial Boiler, to use pulverized coal combustion, realize low energy consumption, low emission, researched and developed vertical coal-powder boiler in recent years.The burner hearth of vertical pulverized-coal fired boiler adopts vertical layout, for the vertical furnace chamber that the boiler of other form adopts, increases substantially the efficiency of combustion of boiler, thereby has created advantage for applying of efficient pulverized-coal fired boiler.But vertical pulverized-coal fired boiler still exists system complex, the more shortcoming of corollary equipment, therefore makes the cost of Industrial Boiler be reduced to user's acceptable level as much as possible, remains the target that vertical pulverized-coal fired boiler designing institute is pursued.Based on this, be necessary existing vertical pulverized-coal fired boiler is carried out architecture advances, to solve its system complex, the more problem of corollary equipment.
Summary of the invention
The utility model is in order to solve complicated, the more problem of corollary equipment of existing vertical pulverized-coal fired boiler, and a kind of vertical tube formula forced circulation coal dust firing hot-water boiler that spreads out is provided.
The utility model is to adopt following technical scheme to realize: the vertical tube formula forced circulation coal dust firing hot-water boiler that spreads out comprises the vertical furnace chamber water wall surface, is located at the convection pass of vertical furnace chamber water wall surface rear side; Vertical furnace chamber water wall surface top Hou Qiang is provided with foldede flame wall; High-temperature economizer, middle temperature economizer, low-level (stack-gas) economizer are installed in the convection pass from top to bottom successively; Convection pass top is communicated with vertical furnace chamber water wall surface top; Be furnished with convection bank in the convection pass; Low-level (stack-gas) economizer, middle temperature economizer, high-temperature economizer are passed in convection bank from bottom to top successively, and the convection bank upper end is communicated with vertical furnace chamber water wall surface lower end.
During work; Coal dust is in vertical furnace chamber water wall surface internal combustion; Foldede flame wall can make the flame in the vertical furnace chamber water wall surface once transfer and prolong the burning time of coal dust in the vertical furnace chamber water wall surface, guarantees flame burning time and the coking that prevents coal dust in the vertical furnace chamber water wall surface.Flue gas by vertical furnace chamber water wall surface top after wall flow out, get into convection pass after, wash away high-temperature economizer, middle temperature economizer, low-level (stack-gas) economizer downwards successively, discharge from the convection pass bottom at last.In this process, water gets into low-level (stack-gas) economizer by economizer allocation set case, then via middle temperature economizer; High-temperature economizer; Get into vertical furnace chamber water wall surface lower end through the convection bank upper end then, get into drum by vertical furnace chamber water wall surface upper end at last, accomplish forced circulation.Based on said process; The described vertical tube of the utility model formula forced circulation coal dust firing hot-water boiler that spreads out adopts arrangement form that vertical furnace chamber adds the pedestal convection heating surface and forces the water endless form; Satisfying under the prerequisite of boiler performance; Greatly reduce the height and the steel consumption of boiler, reduced boiler manufacturing cost and boiler room manufacturing cost, solved complicated, the more problem of corollary equipment of existing vertical pulverized-coal fired boiler thus.
The utility model efficiently solves complicated, the more problem of corollary equipment of existing vertical pulverized-coal fired boiler based on existing vertical pulverized-coal fired boiler is carried out architecture advances, is applicable to Industrial Boiler.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: 1-vertical furnace chamber water wall surface, 2-convection pass, 3-foldede flame wall, 4-high-temperature economizer, warm economizer among the 5-, 6-low-level (stack-gas) economizer, 7-convection bank.
The specific embodiment
The vertical tube formula forced circulation coal dust firing hot-water boiler that spreads out comprises vertical furnace chamber water wall surface 1, is located at the convection pass 2 of vertical furnace chamber water wall surface 1 rear side; Vertical furnace chamber water wall surface 1 top Hou Qiang is provided with foldede flame wall 3; High-temperature economizer 4, middle temperature economizer 5, low-level (stack-gas) economizer 6 are installed in the convection pass 2 from top to bottom successively; Convection pass 2 tops are communicated with vertical furnace chamber water wall surface 1 top; Be furnished with convection bank 7 in the convection pass 2; Low-level (stack-gas) economizer 6, middle temperature economizer 5, high-temperature economizer 4 are passed in convection bank 7 from bottom to top successively, and convection bank 7 upper ends are communicated with vertical furnace chamber water wall surface 1 lower end;
During practical implementation, the vertical furnace chamber water wall surface adopts fin panel casing, adopts the heavy boiler setting structure around the convection pass, makes convection pass tail seal property good, improves the efficient of boiler greatly.

Claims (1)

1. vertical tube formula forced circulation coal dust firing hot-water boiler that spreads out is characterized in that: comprise vertical furnace chamber water wall surface (1), be located at the convection pass (2) of vertical furnace chamber water wall surface (1) rear side; Vertical furnace chamber water wall surface (1) top Hou Qiang is provided with foldede flame wall (3); High-temperature economizer (4), middle temperature economizer (5), low-level (stack-gas) economizer (6) are installed in the convection pass (2) from top to bottom successively; Convection pass (2) top is communicated with vertical furnace chamber water wall surface (1) top; Be furnished with convection bank (7) in the convection pass (2); Low-level (stack-gas) economizer (6), middle temperature economizer (5), high-temperature economizer (4) are passed in convection bank (7) from bottom to top successively, and convection bank (7) upper end is communicated with vertical furnace chamber water wall surface (1) lower end.
CN2011205356620U 2011-12-20 2011-12-20 Vertical type tube derivative forced circulation coal dust combustion hot-water boiler Expired - Fee Related CN202371872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205356620U CN202371872U (en) 2011-12-20 2011-12-20 Vertical type tube derivative forced circulation coal dust combustion hot-water boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205356620U CN202371872U (en) 2011-12-20 2011-12-20 Vertical type tube derivative forced circulation coal dust combustion hot-water boiler

Publications (1)

Publication Number Publication Date
CN202371872U true CN202371872U (en) 2012-08-08

Family

ID=46595571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205356620U Expired - Fee Related CN202371872U (en) 2011-12-20 2011-12-20 Vertical type tube derivative forced circulation coal dust combustion hot-water boiler

Country Status (1)

Country Link
CN (1) CN202371872U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901213A (en) * 2012-10-31 2013-01-30 山西蓝天环保设备有限公司 Superfine pulverized-coal combustion hot water boiler
CN102901080A (en) * 2012-10-31 2013-01-30 山西蓝天环保设备有限公司 Fine pulverized-coal combustion industrial steam boiler
CN102901209A (en) * 2012-10-31 2013-01-30 山西蓝天环保设备有限公司 Large-sized pulverized-coal combustion hot water boiler
CN109974297A (en) * 2019-03-29 2019-07-05 上海工业锅炉(无锡)有限公司 A kind of high-efficiency pulverized coal boiler of organic heat carrier and its working method
CN110360546A (en) * 2019-07-04 2019-10-22 北控清洁热力有限公司 Vertical pulverized-coal fired boiler

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901213A (en) * 2012-10-31 2013-01-30 山西蓝天环保设备有限公司 Superfine pulverized-coal combustion hot water boiler
CN102901080A (en) * 2012-10-31 2013-01-30 山西蓝天环保设备有限公司 Fine pulverized-coal combustion industrial steam boiler
CN102901209A (en) * 2012-10-31 2013-01-30 山西蓝天环保设备有限公司 Large-sized pulverized-coal combustion hot water boiler
CN109974297A (en) * 2019-03-29 2019-07-05 上海工业锅炉(无锡)有限公司 A kind of high-efficiency pulverized coal boiler of organic heat carrier and its working method
CN110360546A (en) * 2019-07-04 2019-10-22 北控清洁热力有限公司 Vertical pulverized-coal fired boiler

Similar Documents

Publication Publication Date Title
CN202371872U (en) Vertical type tube derivative forced circulation coal dust combustion hot-water boiler
CN201463253U (en) Double-furnace horizontal type industrial pulverized coal fired boiler
CN101706108B (en) Structure for arranging heating surfaces in tail flue of garbage incinerator of circulating fluid bed
CN102425775A (en) U-shaped flame vertical pulverized coal fired oilfield gas injection boiler with overhead burner
CN201621675U (en) Horizontal type pulverized coal boiler with bend type aftercombustion chamber
CN204165038U (en) A kind of U-shaped flame pulverized coal firing boiler
CN105091320A (en) CWS (Coal Water Slurry) hot water boiler system
CN201621844U (en) Horizontal pipe frame forced circulation coal powder burning hot water boiler
CN203731393U (en) Pulverized coal boiler with burner at top
CN203384986U (en) Composite garbage incineration boiler
CN202973511U (en) Superfine pulverized coal firing hot water boiler
CN202733916U (en) Burning dregs fluidized bed boiler
CN203432081U (en) Thermal conduction oil furnace for horizontal type circulating fluidized bed
CN203382777U (en) Hot-blast furnace
CN202328140U (en) Horizontal pulverized coal combustion gas injection boiler of oil field
CN202927884U (en) Solid fuel civil cooking heating furnace
CN204042840U (en) Scoot burning boiler
CN202885230U (en) Large-scale pulverized coal combustion hot-water boiler
CN102901209A (en) Large-sized pulverized-coal combustion hot water boiler
CN202328137U (en) U-shaped flame vertical pulverized coal burning oil field gas injection boiler placed at top of burner
CN203927893U (en) Mixed fuel firing boiler
CN204006637U (en) Water-coal-slurry hot-water boiler
CN203203242U (en) Vertical coal water slurry organic heat carrier boiler
CN202973047U (en) Fine pulverized coal firing industrial steam boiler
CN204829875U (en) Two furnace fire burning furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING ZHONG'AOTONG ENVIRONMENTAL SCIENCE RESEARC

Free format text: FORMER OWNER: SHANXI LANTIAN ENVIRONMANTAL ENGINEERING CO., LTD.

Effective date: 20140902

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 034000 XINZHOU, SHAANXI PROVINCE TO: 100029 CHAOYANG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140902

Address after: 100029 Beichen West Road, Chaoyang District, No. 19 to layer 69, unit 2008, 3, 20

Patentee after: Environmental Science Research Institute Co Ltd Beijing Zhongaotong

Address before: Bei Yi Jing Xiang Cao Jia Zhuang Cun 034000 Shanxi province Xinzhou Xinfu District North

Patentee before: Shanxi Lantian Environmantal Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120808

Termination date: 20151220

EXPY Termination of patent right or utility model