CN202370178U - Control device for plate upper reinforcement cover - Google Patents
Control device for plate upper reinforcement cover Download PDFInfo
- Publication number
- CN202370178U CN202370178U CN2011205653152U CN201120565315U CN202370178U CN 202370178 U CN202370178 U CN 202370178U CN 2011205653152 U CN2011205653152 U CN 2011205653152U CN 201120565315 U CN201120565315 U CN 201120565315U CN 202370178 U CN202370178 U CN 202370178U
- Authority
- CN
- China
- Prior art keywords
- reinforcement
- plate upper
- transverse
- control device
- longitudinal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses a control device for a plate upper reinforcement cover. The control device is characterized by comprising a vertical reinforcement, a longitudinal reinforcement, a transverse reinforcement, an adjustable drag hook and a plate upper reinforcement, wherein the vertical reinforcement is respectively fixedly connected with the longitudinal reinforcement and the transverse reinforcement; the longitudinal reinforcement is fixedly connected with the transverse reinforcement; the adjustable drag hook is respectively connected with the transverse reinforcement and the plate upper reinforcement; the adjustable drag hook is in an S shape; and the longitudinal reinforcement and the transverse reinforcement are welded among the vertical reinforcement, the longitudinal reinforcement and the transverse reinforcement. The control device has the advantages of low cost, practicability, high efficiency, convenience in mounting and easy construction, and a large quantity of measure reinforcements can be saved; the control device can be recycled for multiple times so as to improve the working efficiency; the rigidity of a reinforcement bracket is high, therefore, the reinforcement bracket can be used as a stepping platform, and the phenomena of plate negative reinforcement deformation and mess caused by artificial stepping are effectively prevented; and the supporting effect is obvious, so that the cover thickness of the plate upper reinforcement is effectively guaranteed, and the project quality is improved.
Description
Technical field
The utility model relates to a kind of plate upper reinforcement topping control device.
Background technology
At present, project using is more is the protective layer thickness that adopts reinforcing bar stirrup control panel upper reinforcement, and this way is because reinforcing bar can not recycle; All need make a large amount of stirrups for every layer; Workload is bigger, and the waste lot of reinforcing steel bar, has increased construction cost greatly.Simultaneously, in work progress because the influence of constructor and material distributing machine, thereby this stirrup trampled easily and cause the distortion of plate gluten in disorder, influence workmanship.
The utility model content
The utility model technical problem to be solved provides a kind of plate upper reinforcement topping control device, has solved the problems referred to above.
The utility model technical problem to be solved realizes through following technical scheme:
A kind of plate upper reinforcement topping control device is characterized in that: comprise vertical reinforcement, longitudinal reinforcement, transverse reinforcement, adjustable drag hook and plate upper reinforcement; Said vertical reinforcement is fixedly connected with transverse reinforcement with longitudinal reinforcement respectively; Said longitudinal reinforcement is fixedly connected with transverse reinforcement; Adjustable drag hook is connected with the plate upper reinforcement with transverse reinforcement respectively.
Said adjustable drag hook is the S type.
Weld between said vertical reinforcement and longitudinal reinforcement and the transverse reinforcement.
Said longitudinal reinforcement and transverse reinforcement welding.
The beneficial effect of the utility model:
The utility model is with low cost, practices thrift a large amount of measure reinforcing bars; Practicality and high efficiency, easy for installation, be easy to construction, can repeatedly repeat turnover and use, increase work efficiency; Steel bar rack rigidity is high, can be used as and tramples platform, has prevented effectively to trample the negative muscle distortion of the plate face that causes, in disorder existing picture because of the people; Support effect is obvious, has guaranteed the protective layer thickness of plate upper reinforcement effectively, and workmanship is improved.
Description of drawings
Fig. 1 is the utility model sketch map
The specific embodiment
Plate upper reinforcement topping control device sketch map as shown in Figure 1 comprises vertical reinforcement 1, longitudinal reinforcement 2, transverse reinforcement 3, the S type is adjustable drag hook 4, plate upper reinforcement 5.Said vertical reinforcement and transverse and longitudinal reinforcing bar top are through being welded to connect, and transverse reinforcement and longitudinal reinforcement are through being welded to connect, and the adjustable drag hook of S type is connected through crotch with transverse reinforcement.
Select one group of vertical reinforcement 1 that 4 length are identical according to on-the-spot waste material situation; 3,2 adjustable drag hooks 4 of 2,3 transverse reinforcements of 2 longitudinal reinforcements; Thickness according to vertical reinforcement size and plate upper reinforcement topping is confirmed the setting-out length of adjustable drag hook, and is processed into S type crotch.
The colligation of plate upper reinforcement places this device on the plate face, and S type crotch is linked to each other with plate upper reinforcement, transverse reinforcement respectively after accomplishing, and plays the purpose that guarantees plate upper reinforcement topping.Treat that concrete is about to reach (after promptly building 2h) after the initial set, this appliance stand is taken out,, in time clear up the concrete grout of leaving on this device, prepare for repeating the turnover use next time at receipts light that the plate face is wiped one's face.
Claims (4)
1. a plate upper reinforcement topping control device is characterized in that: comprise vertical reinforcement (1), longitudinal reinforcement (2), transverse reinforcement (3), adjustable drag hook (4) and plate upper reinforcement (5); Said vertical reinforcement (1) is fixedly connected with transverse reinforcement (3) with longitudinal reinforcement (2) respectively; Said longitudinal reinforcement (2) is fixedly connected with transverse reinforcement (3); Adjustable drag hook (4) is connected with plate upper reinforcement (5) with transverse reinforcement (3) respectively.
2. plate upper reinforcement topping control device as claimed in claim 1 is characterized in that: said adjustable drag hook (4) is the S type.
3. plate upper reinforcement topping control device as claimed in claim 1 is characterized in that: welding between said vertical reinforcement (1) and longitudinal reinforcement (2) and the transverse reinforcement (3).
4. plate upper reinforcement topping control device as claimed in claim 1 is characterized in that: said longitudinal reinforcement (2) and transverse reinforcement (3) welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205653152U CN202370178U (en) | 2011-12-30 | 2011-12-30 | Control device for plate upper reinforcement cover |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205653152U CN202370178U (en) | 2011-12-30 | 2011-12-30 | Control device for plate upper reinforcement cover |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202370178U true CN202370178U (en) | 2012-08-08 |
Family
ID=46593886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205653152U Expired - Lifetime CN202370178U (en) | 2011-12-30 | 2011-12-30 | Control device for plate upper reinforcement cover |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202370178U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110205896A (en) * | 2019-06-03 | 2019-09-06 | 中国建筑土木建设有限公司 | The method of its progress road construction of concrete road surface dowel mounting device and application |
CN111463569A (en) * | 2020-04-25 | 2020-07-28 | 王晨庄 | 5G construction is based on hidden antenna array structure of protection of reinforcing bar or steel construction |
-
2011
- 2011-12-30 CN CN2011205653152U patent/CN202370178U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110205896A (en) * | 2019-06-03 | 2019-09-06 | 中国建筑土木建设有限公司 | The method of its progress road construction of concrete road surface dowel mounting device and application |
CN111463569A (en) * | 2020-04-25 | 2020-07-28 | 王晨庄 | 5G construction is based on hidden antenna array structure of protection of reinforcing bar or steel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201739731U (en) | Portable adjustable bracket | |
CN202370178U (en) | Control device for plate upper reinforcement cover | |
CN204001436U (en) | A kind of constructing structure that guarantees topping at the bottom of beam, deck-molding and thickness of slab | |
CN105464352B (en) | Adjust the device of reinforced mesh height | |
CN204899064U (en) | Heavy grade slope roofing cast in situ concrete construction equipment | |
CN203320968U (en) | Rectangular hanging split heads support | |
CN203238951U (en) | Box girder steel pipe arc bracket | |
CN202969732U (en) | Positioning device of upper reinforcement protective cover of cast-in-place slab | |
CN102465605A (en) | Method for building bottom plate steel bar support | |
CN204662369U (en) | A kind of slope cantilever large form | |
CN204139466U (en) | A kind of concrete prefabricated cushion block | |
CN205259555U (en) | Device of adjustment reinforcing bar net piece height | |
CN203361642U (en) | Assembled-structure cast-in-place stair steel molding plate | |
CN201826539U (en) | Reusable support frame for steel bar construction | |
CN204252403U (en) | A kind of positioning stool for Bars In Poured Concrete Slab negative bending moment rib | |
CN209025324U (en) | A kind of floor bar split heads | |
CN103306211A (en) | Long and large No.0 reinforcing steel bar binding construction method based on framework beam | |
CN204818485U (en) | Reinforcing bar net piece production platform | |
CN204212302U (en) | A kind of hollowcore slab light pipe float Structure | |
CN203145327U (en) | Pillar vertical steel bar mount apparatus | |
CN204040460U (en) | One is exempted from hacking concrete slab and is built device | |
CN206309022U (en) | A kind of steel closed stair integral forming construction template | |
CN203961278U (en) | Building operations roof beam structure | |
CN205065036U (en) | Horizontal pump line of floor supports instrument during ground pump concreting | |
CN201546371U (en) | Bundled non-bonded prestressed rib anchorage system for large-diameter silo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120808 |
|
CX01 | Expiry of patent term |