CN202370178U - Control device for plate upper reinforcement cover - Google Patents

Control device for plate upper reinforcement cover Download PDF

Info

Publication number
CN202370178U
CN202370178U CN2011205653152U CN201120565315U CN202370178U CN 202370178 U CN202370178 U CN 202370178U CN 2011205653152 U CN2011205653152 U CN 2011205653152U CN 201120565315 U CN201120565315 U CN 201120565315U CN 202370178 U CN202370178 U CN 202370178U
Authority
CN
China
Prior art keywords
reinforcement
plate upper
transverse
control device
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205653152U
Other languages
Chinese (zh)
Inventor
任志平
王栋杰
程军
侯鹏
林强
黄凯
许志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN2011205653152U priority Critical patent/CN202370178U/en
Application granted granted Critical
Publication of CN202370178U publication Critical patent/CN202370178U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a control device for a plate upper reinforcement cover. The control device is characterized by comprising a vertical reinforcement, a longitudinal reinforcement, a transverse reinforcement, an adjustable drag hook and a plate upper reinforcement, wherein the vertical reinforcement is respectively fixedly connected with the longitudinal reinforcement and the transverse reinforcement; the longitudinal reinforcement is fixedly connected with the transverse reinforcement; the adjustable drag hook is respectively connected with the transverse reinforcement and the plate upper reinforcement; the adjustable drag hook is in an S shape; and the longitudinal reinforcement and the transverse reinforcement are welded among the vertical reinforcement, the longitudinal reinforcement and the transverse reinforcement. The control device has the advantages of low cost, practicability, high efficiency, convenience in mounting and easy construction, and a large quantity of measure reinforcements can be saved; the control device can be recycled for multiple times so as to improve the working efficiency; the rigidity of a reinforcement bracket is high, therefore, the reinforcement bracket can be used as a stepping platform, and the phenomena of plate negative reinforcement deformation and mess caused by artificial stepping are effectively prevented; and the supporting effect is obvious, so that the cover thickness of the plate upper reinforcement is effectively guaranteed, and the project quality is improved.

Description

Plate upper reinforcement topping control device
Technical field
The utility model relates to a kind of plate upper reinforcement topping control device.
Background technology
At present, project using is more is the protective layer thickness that adopts reinforcing bar stirrup control panel upper reinforcement, and this way is because reinforcing bar can not recycle; All need make a large amount of stirrups for every layer; Workload is bigger, and the waste lot of reinforcing steel bar, has increased construction cost greatly.Simultaneously, in work progress because the influence of constructor and material distributing machine, thereby this stirrup trampled easily and cause the distortion of plate gluten in disorder, influence workmanship.
The utility model content
The utility model technical problem to be solved provides a kind of plate upper reinforcement topping control device, has solved the problems referred to above.
The utility model technical problem to be solved realizes through following technical scheme:
A kind of plate upper reinforcement topping control device is characterized in that: comprise vertical reinforcement, longitudinal reinforcement, transverse reinforcement, adjustable drag hook and plate upper reinforcement; Said vertical reinforcement is fixedly connected with transverse reinforcement with longitudinal reinforcement respectively; Said longitudinal reinforcement is fixedly connected with transverse reinforcement; Adjustable drag hook is connected with the plate upper reinforcement with transverse reinforcement respectively.
Said adjustable drag hook is the S type.
Weld between said vertical reinforcement and longitudinal reinforcement and the transverse reinforcement.
Said longitudinal reinforcement and transverse reinforcement welding.
The beneficial effect of the utility model:
The utility model is with low cost, practices thrift a large amount of measure reinforcing bars; Practicality and high efficiency, easy for installation, be easy to construction, can repeatedly repeat turnover and use, increase work efficiency; Steel bar rack rigidity is high, can be used as and tramples platform, has prevented effectively to trample the negative muscle distortion of the plate face that causes, in disorder existing picture because of the people; Support effect is obvious, has guaranteed the protective layer thickness of plate upper reinforcement effectively, and workmanship is improved.
Description of drawings
Fig. 1 is the utility model sketch map
The specific embodiment
Plate upper reinforcement topping control device sketch map as shown in Figure 1 comprises vertical reinforcement 1, longitudinal reinforcement 2, transverse reinforcement 3, the S type is adjustable drag hook 4, plate upper reinforcement 5.Said vertical reinforcement and transverse and longitudinal reinforcing bar top are through being welded to connect, and transverse reinforcement and longitudinal reinforcement are through being welded to connect, and the adjustable drag hook of S type is connected through crotch with transverse reinforcement.
Select one group of vertical reinforcement 1 that 4 length are identical according to on-the-spot waste material situation; 3,2 adjustable drag hooks 4 of 2,3 transverse reinforcements of 2 longitudinal reinforcements; Thickness according to vertical reinforcement size and plate upper reinforcement topping is confirmed the setting-out length of adjustable drag hook, and is processed into S type crotch.
The colligation of plate upper reinforcement places this device on the plate face, and S type crotch is linked to each other with plate upper reinforcement, transverse reinforcement respectively after accomplishing, and plays the purpose that guarantees plate upper reinforcement topping.Treat that concrete is about to reach (after promptly building 2h) after the initial set, this appliance stand is taken out,, in time clear up the concrete grout of leaving on this device, prepare for repeating the turnover use next time at receipts light that the plate face is wiped one's face.

Claims (4)

1. a plate upper reinforcement topping control device is characterized in that: comprise vertical reinforcement (1), longitudinal reinforcement (2), transverse reinforcement (3), adjustable drag hook (4) and plate upper reinforcement (5); Said vertical reinforcement (1) is fixedly connected with transverse reinforcement (3) with longitudinal reinforcement (2) respectively; Said longitudinal reinforcement (2) is fixedly connected with transverse reinforcement (3); Adjustable drag hook (4) is connected with plate upper reinforcement (5) with transverse reinforcement (3) respectively.
2. plate upper reinforcement topping control device as claimed in claim 1 is characterized in that: said adjustable drag hook (4) is the S type.
3. plate upper reinforcement topping control device as claimed in claim 1 is characterized in that: welding between said vertical reinforcement (1) and longitudinal reinforcement (2) and the transverse reinforcement (3).
4. plate upper reinforcement topping control device as claimed in claim 1 is characterized in that: said longitudinal reinforcement (2) and transverse reinforcement (3) welding.
CN2011205653152U 2011-12-30 2011-12-30 Control device for plate upper reinforcement cover Expired - Lifetime CN202370178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205653152U CN202370178U (en) 2011-12-30 2011-12-30 Control device for plate upper reinforcement cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205653152U CN202370178U (en) 2011-12-30 2011-12-30 Control device for plate upper reinforcement cover

Publications (1)

Publication Number Publication Date
CN202370178U true CN202370178U (en) 2012-08-08

Family

ID=46593886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205653152U Expired - Lifetime CN202370178U (en) 2011-12-30 2011-12-30 Control device for plate upper reinforcement cover

Country Status (1)

Country Link
CN (1) CN202370178U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110205896A (en) * 2019-06-03 2019-09-06 中国建筑土木建设有限公司 The method of its progress road construction of concrete road surface dowel mounting device and application
CN111463569A (en) * 2020-04-25 2020-07-28 王晨庄 5G construction is based on hidden antenna array structure of protection of reinforcing bar or steel construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110205896A (en) * 2019-06-03 2019-09-06 中国建筑土木建设有限公司 The method of its progress road construction of concrete road surface dowel mounting device and application
CN111463569A (en) * 2020-04-25 2020-07-28 王晨庄 5G construction is based on hidden antenna array structure of protection of reinforcing bar or steel construction

Similar Documents

Publication Publication Date Title
CN201739731U (en) Portable adjustable bracket
CN202370178U (en) Control device for plate upper reinforcement cover
CN204001436U (en) A kind of constructing structure that guarantees topping at the bottom of beam, deck-molding and thickness of slab
CN105464352B (en) Adjust the device of reinforced mesh height
CN204899064U (en) Heavy grade slope roofing cast in situ concrete construction equipment
CN203320968U (en) Rectangular hanging split heads support
CN203238951U (en) Box girder steel pipe arc bracket
CN202969732U (en) Positioning device of upper reinforcement protective cover of cast-in-place slab
CN102465605A (en) Method for building bottom plate steel bar support
CN204662369U (en) A kind of slope cantilever large form
CN204139466U (en) A kind of concrete prefabricated cushion block
CN205259555U (en) Device of adjustment reinforcing bar net piece height
CN203361642U (en) Assembled-structure cast-in-place stair steel molding plate
CN201826539U (en) Reusable support frame for steel bar construction
CN204252403U (en) A kind of positioning stool for Bars In Poured Concrete Slab negative bending moment rib
CN209025324U (en) A kind of floor bar split heads
CN103306211A (en) Long and large No.0 reinforcing steel bar binding construction method based on framework beam
CN204818485U (en) Reinforcing bar net piece production platform
CN204212302U (en) A kind of hollowcore slab light pipe float Structure
CN203145327U (en) Pillar vertical steel bar mount apparatus
CN204040460U (en) One is exempted from hacking concrete slab and is built device
CN206309022U (en) A kind of steel closed stair integral forming construction template
CN203961278U (en) Building operations roof beam structure
CN205065036U (en) Horizontal pump line of floor supports instrument during ground pump concreting
CN201546371U (en) Bundled non-bonded prestressed rib anchorage system for large-diameter silo

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120808

CX01 Expiry of patent term