CN202370146U - Mounting structure for integrated ceiling joist - Google Patents

Mounting structure for integrated ceiling joist Download PDF

Info

Publication number
CN202370146U
CN202370146U CN2011204560165U CN201120456016U CN202370146U CN 202370146 U CN202370146 U CN 202370146U CN 2011204560165 U CN2011204560165 U CN 2011204560165U CN 201120456016 U CN201120456016 U CN 201120456016U CN 202370146 U CN202370146 U CN 202370146U
Authority
CN
China
Prior art keywords
elastic force
safety plate
mounting structure
suspension hook
brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204560165U
Other languages
Chinese (zh)
Inventor
陶科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011204560165U priority Critical patent/CN202370146U/en
Application granted granted Critical
Publication of CN202370146U publication Critical patent/CN202370146U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a mounting structure for an integrated ceiling joist. The mounting structure comprises a main triangular joist (1), an auxiliary triangular joist (2), a connecting sheet (3), a lifting hook (5) and a screw rod (6) and further comprises a first elastic safety piece (41) and a second elastic safety piece (42), wherein the lifting hook (5) is connected with a roof through the screw rod (6); a first connecting hole (31) for the auxiliary triangular joist to be inserted in is formed in the connecting sheet (3); a second connecting hole (51) for the main triangular joist to be inserted in is formed in the lifting hook (5); the first elastic safety piece (41) is clamped between the auxiliary triangular joist (2) and the connecting sheet (3); and the second elastic safety piece (42) is clamped between the main triangular joist (1) and the lifting hook (5). The mounting structure for the integrated ceiling joist is convenient and quick to mount, few auxiliary parts are needed, the cost is saved, and the stability and the firmness are improved.

Description

A kind of mounting structure of integrated channel
Technical field
The utility model relates to a kind of mounting structure of integrated channel, belongs to the interior decoration field.
Background technology
During the interior decoration in house; Ceiling decoration is carried out to ceiling in the capital; Good reasonably furred ceiling designs, and can remedy the deficiency of too high wide grade on the existing building structure, also has partition space, strengthens indoor decorative effect, enriches effects such as indoor light source level and heat-insulation and heat-preservation.The keel that the installation of integrated furred ceiling mainly adopts light steel to make are made framework, link to each other with floor through screw rod, in order to carry fixedly ceiling ornament.In the present existing technology, what the furred ceiling of integrated furred ceiling was installed main employing is being connected of lightgage steel joist and triangle keel fixedly to accomplish the keel frame structure, more time-consuming but this structure is installed; Erection procedure is complicated; Need use multiple auxiliary component, and the stability of the frame construction of installation is not enough, the design of furred ceiling can receive very big restriction; Can't satisfy client's various requirement fully, very inconvenience of dismounting repacking.
The utility model content
The utility model is that present integrated channel erection procedure is many, time-consuming in order to solve, auxiliary component is many and installation after the stability of frame construction not enough, a kind of mounting structure of integrated channel is provided for this reason.
In order to achieve the above object; The solution that the utility model is taked is: a kind of mounting structure of integrated channel, comprise main triangle keel, secondary triangle keel, brace, suspension hook, screw rod, and suspension hook is connected with the roof through screw rod; The card base of brace top inserts in the elastic force chamber of main triangle keel below; Brace is provided with first connecting hole that supplies secondary triangle keel to insert, and suspension hook is provided with second connecting hole that supplies main triangle keel to insert, and also comprises the first elastic force safety plate and the second elastic force safety plate; The said first elastic force safety plate is stuck between secondary triangle keel and the brace; The U-shaped mouth of the said first elastic force safety plate is stuck in outside the terminal arc limit, main triangle keel elastic force chamber, pins the elastic force chamber, and the said second elastic force safety plate is stuck between main triangle keel and the suspension hook.
In the technique scheme of the utility model, on first connecting hole that the secondary triangle keel of the confession of said brace insert, be provided with width and corresponding first holddown groove of the first elastic force safety plate width.
In the technique scheme of the utility model, the said first elastic force safety plate and the second elastic force safety plate, there is the U-shaped mouth centre, the curved structure in U-shaped mouth both sides.
In the technique scheme of the utility model, second connecting hole that the main triangle keel of the confession of said suspension hook insert is provided with width and corresponding second holddown groove of the second elastic force safety plate width.
In the technique scheme of the utility model, the upper end of said suspension hook bends to the right angle, and there is the reinforcement angle in the edge inner at the right angle, on the top of flexure plane first fixing hole arranged, and one second fixing hole is arranged at the middle part of suspension hook; Suspension hook adopts bolt to be connected through first fixing hole and roof.
In this practical technique scheme; A kind of brace that integrated channel is installed that is used for is also disclosed; Said brace comprise first connecting hole, first connecting hole is provided with width and corresponding first holddown groove of the first elastic force safety plate width, there is card base said brace upper end.
In this practical technique scheme; Also disclose a kind of suspension hook that integrated channel is installed that is used for, the upper end of said suspension hook bends to the right angle, and there is the reinforcement angle in the edge inner at the right angle; On the top of flexure plane first fixing hole is arranged, one second fixing hole is arranged at the middle part of suspension hook.Suspension hook second connecting hole be provided with width and corresponding second holddown groove of the second elastic force safety plate width.
The beneficial effect of the utility model is: the mounting structure of more convenient integrated channel; Required auxiliary component is few, has practiced thrift cost, and is rational in infrastructure simple; Whole stability and fastness have been improved simultaneously; Structure dismounting repacking flexibly is convenient, can satisfy the more requirement of client, has widened the scope of design of integrated furred ceiling.
Description of drawings
The utility model will explain through example and with reference to the mode of accompanying drawing, wherein:
Fig. 1 is the said installation furred ceiling of a utility model sketch map;
Fig. 2 is the said mounting structure elevation of the utility model;
Fig. 3 is the said brace structure chart of the utility model;
Fig. 4 is the said blackwall hitch composition of the utility model;
Fig. 5 is the said first elastic force safety plate structure chart of the utility model;
Fig. 6 is the said second elastic force safety plate structure chart of the utility model.
Reference numeral does among the figure, and 1 is main triangle keel, and 2 is secondary triangle keel, and 3 is brace; 5 is suspension hook, and 6 is screw rod, and 31 is first connecting hole, and 32 is first holddown groove; 33 is Ka Jiao, and 41 is the first elastic force safety plate, and 42 is the second elastic force safety plate, and 51 is second connecting hole; 52 is second holddown groove, and 53 is fixing hole, and 54 for strengthening the angle.
The specific embodiment
Disclosed all characteristics in this manual, or the step in disclosed all methods or the process except mutually exclusive characteristic and/or the step, all can make up by any way.
Disclosed arbitrary characteristic in this manual (comprising any accessory claim, summary and accompanying drawing) is only if special narration all can be replaced by other equivalences or the alternative features with similar purpose.That is, only if special narration, each characteristic is an example in a series of equivalences or the similar characteristics.
The mounting structure of a kind of integrated channel as depicted in figs. 1 and 2 comprises main triangle keel 1, secondary triangle keel 2, brace 3, suspension hook 5, screw rod 6, the first elastic force safety plate 41 and the second elastic force safety plate 42; Wherein suspension hook 5 is connected with the roof through screw rod 6; Brace 3 is provided with first connecting hole, 31, the first connecting holes upper end that supplies secondary triangle keel to insert and is provided with first holddown groove 32; During installation, after secondary triangle keel inserted first connecting hole 31, the said first elastic force safety plate 41 passed first holddown groove 32, be stuck between secondary triangle keel 2 and the brace 3, thus can be so that secondary triangle keel 2 be securely fixed on the brace 3; Wherein the top of brace 3 is provided with card base 33; Card base 33 is stuck in the elastic force chamber of main triangle keel 1; Make the U-shaped mouth of the elastic force safety plate 41 of winning block the outside on arc limit, lower end, main triangle keel 1 elastic force chamber; Thereby pin the elastic force chamber, main triangle keel 1 are linked together with secondary triangle keel 2 through brace 3; Suspension hook 5 is provided with on second connecting hole, 51, the second connecting holes 51 that supply main triangle keel to insert has second holddown groove 52; During installation, after main triangle keel 1 inserted second connecting hole 51, the said second elastic force safety plate 42 passed second holddown groove 52, is stuck between main triangle keel 1 and the suspension hook 5, thereby main triangle keel 1 are securely fixed on the suspension hook 5.
First connecting hole 31 that inserts like the secondary triangle keel 2 of the confession of Fig. 2, brace shown in Figure 33 is provided with width and corresponding first holddown groove 32 of the first elastic force safety plate, 41 width, and wherein there is card base 33 on brace 3 tops; The U-shaped mouth in the middle of being, the first elastic force safety plate 41 and the second elastic force safety plate 42 is arranged; The curved structure in U-shaped mouth both sides; It is loosening that the elastic force safety plate can utilize its elastic force to prevent that brace 3 from combining with secondary triangle keel 2; The U type mouth of elastic force safety plate blocks the arc limit of lower end, main triangle keel 1 elastic force chamber, thereby prevents that brace 3 receives heavily landing from the elastic force chamber internal cause of main triangle keel 1, has increased stability.
Second connecting hole 51 that inserts like the main triangle keel 1 of the confession of Fig. 4, suspension hook shown in Figure 5 is provided with width and corresponding second holddown groove 52 of the second elastic force safety plate, 42 width.The upper end of suspension hook bends to the right angle; There is the angle 54 of reinforcement in inner edge at the right angle, strengthens the bearing capacity that angle 54 has increased whole framework, prevents the suspension hook breaking strain; One fixing hole 53 is arranged on the top of flexure plane, and suspension hook 5 adopts screw rod 6 to be connected through fixing hole 53 and roof.
When concrete the use, earlier screw rod is fixed, the suspension hook cover is become owner of on the delta queue bone, between suspension hook and main triangle keel, insert the second elastic force safety plate; The secondary triangle keel of intercepting certain-length; The brace opening part is enclosed within on the secondary triangle keel; The card base of brace upper end is inserted in the elastic force chamber of main triangle keel; Make main triangle keel and secondary triangle keel be vertical configuration, between main triangle keel and secondary triangle keel, insert the first elastic force safety plate at last.This mounting structure is quick and easy for installation, and the integrated ceiling framework of installation relies on bouncing plate to make structure firmly stable more, dismantles flexiblely simultaneously, makes the hommization more of integrated furred ceiling, can widen the developing direction of integrated furred ceiling.
The utility model is not limited to the aforesaid specific embodiment.The utility model expands to any new feature or any new combination that discloses in this manual, and the arbitrary new method that discloses or step or any new combination of process.

Claims (9)

1. the mounting structure of an integrated channel; Comprise main triangle keel (1), secondary triangle keel (2), brace (3), suspension hook (5), screw rod (6); Suspension hook (5) is connected with the roof through screw rod (6); The card base (33) of brace (3) top inserts in the elastic force chamber of main triangle keel (1) below; Brace (3) is provided with first connecting hole (31) that supplies secondary triangle keel to insert, and suspension hook (5) is provided with second connecting hole (51) that supplies main triangle keel to insert, and it is characterized in that: also comprise the first elastic force safety plate (41) and the second elastic force safety plate (42); The said first elastic force safety plate (41) is stuck between secondary triangle keel (2) and the brace (3); It is outside that the U-shaped mouth of the said first elastic force safety plate (41) blocks terminal arc limit, main triangle keel (1) elastic force chamber, pins the elastic force chamber, and the said second elastic force safety plate (42) is stuck between main triangle keel (1) and the suspension hook (5).
2. the mounting structure of integrated channel according to claim 1; It is characterized in that: said brace (3) be provided with the width and first elastic force safety plate (41) corresponding first holddown groove of width (32), there is card base (33) said brace (3) upper end.
3. the mounting structure of integrated channel according to claim 1, it is characterized in that: the first elastic force safety plate (41) and the second elastic force safety plate (42), there is the U-shaped mouth centre, the curved structure in U-shaped mouth both sides.
4. the mounting structure of integrated channel according to claim 1, it is characterized in that: said suspension hook (5) is provided with the width and second elastic force safety plate (42) corresponding second holddown groove of width (52).
5. the mounting structure of integrated channel according to claim 1, it is characterized in that: the upper end of suspension hook (5) bends to the right angle, and there is reinforcement angle (54) in the edge inner at the right angle.
6. the mounting structure of integrated channel according to claim 5 is characterized in that: suspension hook (5) is connected with roof employing bolt (6) through first fixing hole (53).
7. the mounting structure of integrated channel according to claim 1; It is characterized in that: said brace (3) comprise first connecting hole (31); First connecting hole (31) is provided with the width and first elastic force safety plate (41) corresponding first holddown groove of width (32), and there is card base (33) said brace (3) upper end.
8. the mounting structure of integrated channel according to claim 1, it is characterized in that: the upper end of said suspension hook (5) bends to the right angle, and there is reinforcement angle (54) in the edge inner at the right angle, and a fixing hole (53) is arranged on the top of flexure plane.
9. the mounting structure of integrated channel according to claim 8, it is characterized in that: second connecting hole (51) of said suspension hook (5) is provided with the width and second elastic force safety plate (42) corresponding second holddown groove of width (52).
CN2011204560165U 2011-08-12 2011-11-17 Mounting structure for integrated ceiling joist Expired - Fee Related CN202370146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204560165U CN202370146U (en) 2011-08-12 2011-11-17 Mounting structure for integrated ceiling joist

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201120292900.X 2011-08-12
CN201120292900 2011-08-12
CN2011204560165U CN202370146U (en) 2011-08-12 2011-11-17 Mounting structure for integrated ceiling joist

Publications (1)

Publication Number Publication Date
CN202370146U true CN202370146U (en) 2012-08-08

Family

ID=46593854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204560165U Expired - Fee Related CN202370146U (en) 2011-08-12 2011-11-17 Mounting structure for integrated ceiling joist

Country Status (1)

Country Link
CN (1) CN202370146U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278783A (en) * 2013-07-01 2015-01-14 王德路 Ceiling joist assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278783A (en) * 2013-07-01 2015-01-14 王德路 Ceiling joist assembly

Similar Documents

Publication Publication Date Title
CN204876268U (en) Light steel suspended ceiling keel that excels in
CN204626738U (en) A kind of ceiling structure
CN202969677U (en) Keel assembly and main keel
CN202370146U (en) Mounting structure for integrated ceiling joist
CN105544838A (en) Integrated suspended ceiling structure
CN201546357U (en) Supporting keel structure of integrated suspended ceiling
CN206205248U (en) A kind of main bone for being easy to keel shoe and the connector of pair bone clamping
CN204098605U (en) A kind of Novel tent cage construction
CN101775866B (en) Suspended ceiling
CN214272772U (en) Practice thrift novel dry-hanging frame in space
CN202324289U (en) Installation structure of integrated ceiling keel
CN214531450U (en) Indoor suspended ceiling structure with high installation convenience
CN203947648U (en) A kind of Skeleton hanging part structure
CN207079858U (en) It is interior to hang fast keel
CN203307983U (en) Ceiling keel component
CN202658786U (en) Connecting reinforcement structure between panel and keel
CN202672408U (en) Cable-stayed bolt clamping type single glass partition
CN208486406U (en) A kind of mounting structure of assembled wallboard
CN208293878U (en) A kind of building-block and hang weight system
CN202401754U (en) Combined supporting bracket of template keel for buildings
CN205804849U (en) Spliced fast assembling wall slab
CN206090314U (en) Steel anchor beam lifting sling
CN202390984U (en) Vertical plate hook structure
CN214739114U (en) Stone curtain wall connecting piece
CN210947377U (en) Ceiling keel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120808

Termination date: 20171117

CF01 Termination of patent right due to non-payment of annual fee