CN202362422U - Insulating boot and insulating glove test box - Google Patents

Insulating boot and insulating glove test box Download PDF

Info

Publication number
CN202362422U
CN202362422U CN2011205094172U CN201120509417U CN202362422U CN 202362422 U CN202362422 U CN 202362422U CN 2011205094172 U CN2011205094172 U CN 2011205094172U CN 201120509417 U CN201120509417 U CN 201120509417U CN 202362422 U CN202362422 U CN 202362422U
Authority
CN
China
Prior art keywords
insulating
test
power supply
box
milliammeter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205094172U
Other languages
Chinese (zh)
Inventor
汪武
吕齐军
夏秀华
王松
吴华西
周海炜
夏世行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIYAN POWER SUPPLY Co OF HUBEI ELECTRIC POWER Corp
Original Assignee
SHIYAN POWER SUPPLY Co OF HUBEI ELECTRIC POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIYAN POWER SUPPLY Co OF HUBEI ELECTRIC POWER Corp filed Critical SHIYAN POWER SUPPLY Co OF HUBEI ELECTRIC POWER Corp
Priority to CN2011205094172U priority Critical patent/CN202362422U/en
Application granted granted Critical
Publication of CN202362422U publication Critical patent/CN202362422U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The utility model provides an insulating boot and insulating glove test box. The test box comprises a box body, an instrument board and a test power supply box, wherein the upper end face of the box body is provided with an opening; a plurality of isolating layers are arranged in the box body through baffles; the opening direction of the isolating layer is consistent with that of the box body; the bottom of the baffle between the adjacent isolating layers is provided with a gap; a plurality of alternating current milliammeters are arranged on the instrument board; each alternating current milliammeter is provided with a corresponding switch and an indicating lamp; and the switch is connected with the test power supply box. By the insulating boot and insulating glove test box, the problem that the insulating boots and insulating gloves can be simultaneously tested can be solved through the plurality of isolating layers; and the bottom of the baffle between the adjacent isolating layers is provided with the gap, so that water levels among various isolating layers mutually circulate, the water level is not required to be adjusted every time in a test and, and accordingly the working efficiency is greatly improved.

Description

Insulating boot and insulating glove chamber
Technical field
The utility model designs a kind of testing equipment, especially a kind of insulating boot and insulating glove chamber.
Background technology
In the electric power safety instrument that work about electric power person uses, insulating boot, insulating glove are the most frequently used basic security apparatus.Newly purchase or safety appliance just in use is a reliability of guaranteeing its insulation, must carry out an acceptance inspection and routine test it.Insulating boot, insulating glove are bigger in the used quantity of power supply industry, when making an experiment, usually spend a large amount of working times, have strengthened staff's labour intensity.
At present, insulating boot, insulating glove be safety appliance like this, is in special water tank, to make an experiment.During test with water as electrode, be about to water and inject gloves or boots, and be placed on water tank and immerse in the water as an electrode, the water in the water tank is exactly another electrode; Inside and outside water surface isolated edge is respectively gloves 5cm, boots 2cm.In order to measure leakage current values, should be with the water tank insulation against ground, and through a milliammeter ground connection.The closed disconnecting link DK of elder generation behind the withstand voltage 1min, falls voltage during test; Break off DK, boost then, this moment, leakage current flow through milliammeter, read leakage current values, whether saw conformance with standard.If insulating boot, insulating glove are breakdown in withstand voltage test, then test current rises rapidly in the process of boosting, and the experiment power supply case is provided with overcurrent protection, and power supply is broken off rapidly, and protection test equipment is not damaged.
But, existing chamber, because the restriction of structure can only be carried out single test only, inefficiency, milliammeter very easily damages.If many make an experiment simultaneously, can cause test mass not high because of can't the monitoring leakage electric current again, bring certain difficulty to analysis and judgement.
Summary of the invention
The purpose of the utility model provides a kind of insulating boot and insulating glove chamber, can carry out the test of many insulating boots and insulating glove simultaneously, increases work efficiency.
In order to solve the problems of the technologies described above; The technical scheme of the utility model is following: insulating boot and insulating glove chamber; Comprise casing, instrument panel, experiment power supply case, the upper surface of casing is provided with opening, it is characterized in that: be provided with a plurality of interlayers through dividing plate in the described casing; The opening direction of interlayer is consistent with the opening direction of casing, and the dividing plate bottom between the adjacent spacers is provided with the slit; Said instrument panel is provided with a plurality of interchange milliammeters, and each exchanges milliammeter and is equipped with corresponding switch and pilot lamp, and switch is connected with the experiment power supply case.
Improvement to technique scheme: said interchange milliammeter is the interchange milliammeter of band shielding.
Further improvement to technique scheme: the current relay of said experiment power supply case is the parallel connection type current relay of DL-32 type, 25A.
Beneficial effect:
Use described insulating boot of the utility model and insulating glove chamber; The problem of test when a plurality of interlayers can solve many refreshing insulating boots or insulating glove; Dividing plate bottom between the adjacent spacers is provided with the slit; Make the water level between each interlayer circulate mutually, do not need in test all to adjust water level at every turn, thereby improved work efficiency greatly.The used current relay of former overcurrent protection is DL-32,50A, parallel connection type.In the process of the test, as insulating boot, when insulating glove punctures, because the relay scale is bigger; The control box power supply can not in time be cut off, and not only is prone to cause the damage of testing transformer, and is prone to cause the damage of milliammeter and control box reometer; Change into and select DL-32 for use, 25A, parallel connection type current relay; According to the required electric current of test method, be adjusted to correct position to scale, guarantee when many insulating tools are tested simultaneously; If any a puncture, the control box current relay can in time cut off electric current, but protection test transformer and reometer meter are not damaged.Use the band shielding to exchange milliammeter, eliminated the influence of corona current under the high voltage, compare with measuring leakage current with milliammeter from low-pressure side, accuracy is higher, and when many tests, can effectively keep watch on every leakage current.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Embodiment
The utility model insulating boot as shown in Figure 1 and insulating glove chamber; Comprise casing 1, instrument panel 2, experiment power supply case; The upper surface of casing 1 is provided with opening; Be provided with a plurality of interlayers 3 through dividing plate in the described casing 1, the opening direction of interlayer 3 is consistent with the opening direction of casing 1, and the dividing plate bottom between the adjacent spacers is provided with the slit; Said instrument panel 2 is provided with the interchange milliammeter 4 of a plurality of band shieldings, and each exchanges milliammeter 4 and is equipped with corresponding switch and pilot lamp, and switch is connected with the experiment power supply case; The current relay of said experiment power supply case is the parallel connection type current relay of DL-32 type, 25A.During test, closed disconnecting link DK behind the withstand voltage 1min, falls voltage earlier; Break off DK, boost then, this moment, leakage current flow through the milliammeter in the meter specially dish, read and respectively showed leakage current values, whether saw conformance with standard.If insulating boot, insulating glove are breakdown in withstand voltage test, then test current rises rapidly in process of the test, and the experiment power supply case is provided with overcurrent protection, and power supply is broken off rapidly.

Claims (3)

1. insulating boot and insulating glove chamber; Comprise casing, instrument panel, experiment power supply case; The upper surface of casing is provided with opening; It is characterized in that: be provided with a plurality of interlayers through dividing plate in the described casing, the opening direction of interlayer is consistent with the opening direction of casing, and the dividing plate bottom between the adjacent spacers is provided with the slit; Said instrument panel is provided with a plurality of interchange milliammeters, and each exchanges milliammeter and is equipped with corresponding switch and pilot lamp, and switch is connected with the experiment power supply case.
2. insulating boot according to claim 1 and insulating glove chamber is characterized in that: said interchange milliammeter is the interchange milliammeter of band shielding.
3. insulating boot according to claim 1 and 2 and insulating glove chamber is characterized in that: the current relay of said experiment power supply case is the parallel connection type current relay of DL-32 type, 25A.
CN2011205094172U 2011-12-09 2011-12-09 Insulating boot and insulating glove test box Expired - Fee Related CN202362422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205094172U CN202362422U (en) 2011-12-09 2011-12-09 Insulating boot and insulating glove test box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205094172U CN202362422U (en) 2011-12-09 2011-12-09 Insulating boot and insulating glove test box

Publications (1)

Publication Number Publication Date
CN202362422U true CN202362422U (en) 2012-08-01

Family

ID=46573600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205094172U Expired - Fee Related CN202362422U (en) 2011-12-09 2011-12-09 Insulating boot and insulating glove test box

Country Status (1)

Country Link
CN (1) CN202362422U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235247A (en) * 2013-05-08 2013-08-07 国家电网公司 Alternating current (AC) voltage withstand test device for insulating boot and insulating gloves
CN105548845A (en) * 2016-01-27 2016-05-04 国网山东省电力公司青岛供电公司 Device and method for detection of insulation tool
CN105823970A (en) * 2016-05-15 2016-08-03 苏州高精特专信息科技有限公司 Testing device used for insulating gloves or insulating boots
CN109298304A (en) * 2018-11-26 2019-02-01 广东电网有限责任公司 Insulating glove and insulating boot pressure test case

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235247A (en) * 2013-05-08 2013-08-07 国家电网公司 Alternating current (AC) voltage withstand test device for insulating boot and insulating gloves
CN103235247B (en) * 2013-05-08 2016-01-20 国家电网公司 Insulating boot and insulating glove alternating-current voltage resistance test device
CN105548845A (en) * 2016-01-27 2016-05-04 国网山东省电力公司青岛供电公司 Device and method for detection of insulation tool
CN105823970A (en) * 2016-05-15 2016-08-03 苏州高精特专信息科技有限公司 Testing device used for insulating gloves or insulating boots
CN109298304A (en) * 2018-11-26 2019-02-01 广东电网有限责任公司 Insulating glove and insulating boot pressure test case

Similar Documents

Publication Publication Date Title
CN103913663B (en) Online detection method and protection device for direct current system arc faults
CN104133155B (en) A kind of cable local defect diagnostic method
CN202362422U (en) Insulating boot and insulating glove test box
CN201622320U (en) Electrical testing device for insulating safety tools
CN205139322U (en) Handcart -type circuit breaker analogue test appearance
CN105388400B (en) The system analyzed for the partial discharges fault of gas-insulated switchgear
CN102636768B (en) A kind of lightning arrester on-line computing model on-line testing method
CN204177913U (en) A kind of insulating glove, insulating boot batch Withstand test device
CN104459280A (en) Method for extracting resistance current of metal oxide arrester (MOA)
CN104777444A (en) Lightning arrester discharge counter comprehensive calibration instrument and calibration method
CN205139349U (en) Arrester discharge counter and leakage current table check gauge
CN205688015U (en) pipeline cathode protection and outer corrosion rate monitoring probe
CN102879657B (en) Method for checking phase sequences of lines
CN110412351A (en) A kind of anti-interference high-voltage insulating resistance test device
CN204649906U (en) The portable pick-up unit of ultra-high voltage transformer station ultrahigh frequency partial discharge anti-electromagnetic interference test
CN204091111U (en) Early-warning for high pressure insulating boot
CN201364374Y (en) Insulation performance test instrument for power gloves and boots
CN205748710U (en) Optical fiber temperature-measurement device and transformer oil paper insulation test system
CN203178396U (en) Apparatus for testing poor contact caused by penetration insulator of high-voltage conductor
CN106404369B (en) Device and method for the deterioration performance test of switch cabinet bus pile crown fingertip spring
CN204177878U (en) The multi-functional dedicated box of a kind of high-potting discharging rod
CN107942101A (en) A kind of portable transformer test harness device
CN104188238A (en) High-voltage early-warning insulation boot
CN207440235U (en) A kind of GIS device ultrasonic wave partial discharge detecting system
CN205003237U (en) Device that screening of guide body line defect detected on ground net

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20171209