CN201364374Y - Insulation performance test instrument for power gloves and boots - Google Patents

Insulation performance test instrument for power gloves and boots Download PDF

Info

Publication number
CN201364374Y
CN201364374Y CNU2009200888737U CN200920088873U CN201364374Y CN 201364374 Y CN201364374 Y CN 201364374Y CN U2009200888737 U CNU2009200888737 U CN U2009200888737U CN 200920088873 U CN200920088873 U CN 200920088873U CN 201364374 Y CN201364374 Y CN 201364374Y
Authority
CN
China
Prior art keywords
boots
test
reometer
parallel
gloves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200888737U
Other languages
Chinese (zh)
Inventor
毛颖茜
毛宏智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2009200888737U priority Critical patent/CN201364374Y/en
Application granted granted Critical
Publication of CN201364374Y publication Critical patent/CN201364374Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Professional, Industrial, Or Sporting Protective Garments (AREA)

Abstract

The utility model belongs to test instrument field and relates to an insulation performance test instrument for power gloves and boots, which is characterized in that the insulation performance test method for power gloves and boots in prior art is improved; a test control circuit is arranged in a control panel, more than one current input wire are connected with the input wire of an ammeter in parallel, each input wire is connected with a measuring switch in series and is connected with electrode arranged in corresponding insulation water tank, the electrodes are connected with the ground wire of the ammeter through normally-closed switches, protectors are connected with the normally-closed switches in parallel, high voltage output wire electrodes in the same number of input wires of ammeter are connected with high voltage output wire electrodes of transformer; when the model instrument is in use, the test efficiency is improved greatly; the work staff and instruments are all effectively and safely protected.

Description

Electric power gloves boots insulating property tester
Technical field
The utility model belongs to field of test instrument, relates to electric insulation apparatus ability meter, is specifically related to a kind of electric power gloves boots insulating property tester.
Background technology
Electric operating is various with insulating protection apparatus kind quantity, and wherein high tension insulating gloves, high-voltage insulating boots account for over halfly, need often do AC voltage withstand test and leakage current test to every apparatus, detect the High-Voltage Insulation security performance of every articles for use.
Traditional detection electric power adopts when test with the method for gloves, boots insulating property always, product to be tested is placed on the insulating mat of interim place mat, utilizes every test product of the manual contact of electrode of reometer.This insulating property method of testing, because means of testing is quite simple and crude, product to be tested quantity is more, and reometer is because of the electrode loose contact sensitive for damages, and transformer easily causes damaging because of frequently opening jumping; Since at every turn can only single-piece test, every/needs 5 minutes, only the test of gloves, boots just needs 6 days a medium electric power inspection center; Because means of testing is simple and crude, current measurement circuit lacks the reliably protecting measure, exists operator safety hidden danger.
The utility model content
The designer is in putting into practice the contact activity, find that existing electric power exists above-mentioned defective with the High-Voltage Insulation Testing Method of Safety of gloves, boots, improve through constantly exploring, purpose is to provide a kind of electric power gloves boots insulating property tester, testing efficiency be can improve, testing equipment and personal safety ensured.
Technical solution adopted in the utility model is a kind of electric power of design gloves boots insulating property tester; its structure comprises: reometer; control desk; in control desk, be connected with test control circuit mutually with reometer; adopt one or more electric current incoming line in parallel with the incoming line of reometer; the measuring switch of connecting on every incoming line; link to each other with electrode in being arranged on corresponding insulation pond by measuring switch; each electrode links to each other with the reometer ground wire by normally closed switch; the protector of establishing in parallel with normally closed switch is same as the high-voltage output line electrode of reometer incoming line with transformer high-voltage output line electrode quantity in parallel.
The utility model is owing to adopt technique scheme and measure, traditional electric power is improved with gloves boots insulating property method of testing, designed this electric power gloves boots insulating property tester, a kind of tester of standard is provided for electric power detection department, both can do the AC voltage withstand test of test product, can do the leakage current test of test product again; In operating process,, can utilize the existing overcurrent protection function of transformer if the test product insulation breakdown takes place, if the test circuit open circuit takes place, loop voltage raises, the breakdown discharge of discharge tube meeting, can guarantee that personnel and instrument and equipment can not be on the hazard, and eliminate safe hidden trouble; When doing AC voltage withstand test, can realize that many test products test simultaneously, saved the time, improved efficient.
Description of drawings
Fig. 1 represents the structural principle synoptic diagram of the utility model electric power with gloves boots insulating property tester.
Embodiment
Reach embodiment in conjunction with the accompanying drawings, further specify the concrete structure of the utility model electric power with gloves boots insulating property tester, its feature and advantage are clearer.
The utility model electric power embodiment of gloves boots insulating property tester, referring to Fig. 1, its structure comprises: control desk 1, reometer A, linking to each other with reometer A in control desk 1 is provided with test control circuit, and test control circuit adopts the electric current incoming line X with reometer A 12 electric current incoming line X in parallel 2, X 3(model machine adopts 7 in parallel) is at every electric current incoming line X 1, X 2, X 3On the keyswitch CK that connects respectively 1, CK 2, CK 3As measuring switch, pass through CK 1, CK 2, CK 3The electrode that is located in the corresponding insulation pond 2.1,2.2,2.3 with spy links to each other, and each electrode is respectively by button normally closed switch DK 1, DK 2, DK 3Link to each other with the ground wire E of reometer A, with DK 1, DK 2, DK 3Difference parallel discharge protection of pipe device F 1, F 2, F 3, with the high-voltage output line electrode Y of transformer B 1Quantity in parallel is same as reometer A incoming line X 12 high-voltage output line electrode Y 2, Y 3
During use, 3 three electric power of test product only are placed in the insulation pond 2.1,2.2,2.3 with gloves or boots branch.With transformer B high-voltage output line electrode Y 1, Y 2, Y 3Insert contact test product 3 memory mediums respectively, normally closed switch DK 1, DK 2, DK 3All be in normally off.B provides high voltage by transformer, and at this moment the shunt current of Chan Shenging electrode and normally closed switch ground connection in test product, pond ensures that the loop is in low (zero) current potential, promptly once finishes many test product AC voltage withstand test; When doing the measurement leakage current test, the closed first via switch CK of elder generation 1, open switch DK 1, ground loop disconnects, and electric current is through switch CK 1, reometer A ground connection, carry out first test product leakage current testing; When testing second test product, closed first via switch DK 1, cut-off switch CK 1, the direct ground connection in loop, the closed second way switch CK 2, open switch DK 2, ground loop disconnects, and electric current is through switch CK 2, reometer A ground connection, carry out second test product leakage current testing....., and the like, whole test finishes, step-down.
Model machine adopts 7 electric current incoming lines in parallel with the incoming line of reometer, and is on probation through contrasting, test product gloves, boots, contrast need be finished test in 6 days, this model machine advances to 1 day and just can finish test, and testing crew can relievedly courageously be operated without scruple in the test process, has guaranteed personal device security.

Claims (1)

1, a kind of electric power gloves boots insulating property tester; comprise reometer; control desk; it is characterized in that in control desk, being connected with test control circuit mutually with reometer; adopt one or more electric current incoming line in parallel with the incoming line of reometer; the measuring switch of connecting on every incoming line; link to each other with electrode in the corresponding insulation pond by measuring switch; each electrode links to each other with the reometer ground wire by normally closed switch; the protector of establishing in parallel with normally closed switch is same as the high-voltage output line electrode of reometer incoming line with transformer high-voltage output line electrode quantity in parallel.
CNU2009200888737U 2009-03-10 2009-03-10 Insulation performance test instrument for power gloves and boots Expired - Fee Related CN201364374Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200888737U CN201364374Y (en) 2009-03-10 2009-03-10 Insulation performance test instrument for power gloves and boots

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200888737U CN201364374Y (en) 2009-03-10 2009-03-10 Insulation performance test instrument for power gloves and boots

Publications (1)

Publication Number Publication Date
CN201364374Y true CN201364374Y (en) 2009-12-16

Family

ID=41475042

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200888737U Expired - Fee Related CN201364374Y (en) 2009-03-10 2009-03-10 Insulation performance test instrument for power gloves and boots

Country Status (1)

Country Link
CN (1) CN201364374Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102680865A (en) * 2012-04-20 2012-09-19 石家庄供电公司 Integrated device for insulation test of insulation glove
CN103376393A (en) * 2012-04-28 2013-10-30 国家电网公司 Device for alternating-current voltage withstanding test of transformer with wires led out of cable warehouse
CN105067977A (en) * 2015-08-06 2015-11-18 中石化炼化工程(集团)股份有限公司 Withstand voltage test method for combined electrode

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102680865A (en) * 2012-04-20 2012-09-19 石家庄供电公司 Integrated device for insulation test of insulation glove
CN102680865B (en) * 2012-04-20 2014-08-27 国家电网公司 Integrated device for insulation test of insulation glove
CN103376393A (en) * 2012-04-28 2013-10-30 国家电网公司 Device for alternating-current voltage withstanding test of transformer with wires led out of cable warehouse
CN103376393B (en) * 2012-04-28 2015-11-04 国家电网公司 Cable bin outlet transformer alternating Withstand test device
CN105067977A (en) * 2015-08-06 2015-11-18 中石化炼化工程(集团)股份有限公司 Withstand voltage test method for combined electrode

Similar Documents

Publication Publication Date Title
CN105223427B (en) The detection method and detection device of fault electric arc
CN103792505A (en) Ground fault simulation device for electric power direct current system
CN204706260U (en) Investigation of visiting one house after another analogue means
CN103323751A (en) High-voltage short-cable insulation terminal partial discharge testing device and using method
CN104777420A (en) High-voltage switch contact testing system and testing method thereof
CN201666902U (en) High-voltage line parameter testing and protecting device
CN201364374Y (en) Insulation performance test instrument for power gloves and boots
CN104065034A (en) Low-voltage failure detector
CN207396560U (en) A kind of GIS working-frequency voltage tests power-supply system
CN206096309U (en) Ferroresonance detects and prevention and cure combined test platform
CN204241590U (en) Movable switch cubicle commissioning test comprehensive test platform
CN104133152B (en) DC detecting device during single-phase earthing of small current earthing system
CN204903715U (en) Many functional switch power test operation platform
CN104360236A (en) Quick detection complete device and method for electric leakage points of 0.4 kV overhead line
CN104749486B (en) A kind of IT system single-phase fault localization method based on residual current operated protective device
CN203025289U (en) Comprehensive relay protection tester based on self-protection technology
CN105203947A (en) Performance characteristic testing method of high-voltage circuit breaker
CN104183379A (en) Connecting device for maintenance of secondary side of electric power current transformer
CN202522537U (en) Insulating tool edge planar defect on-site detection device
CN104316838A (en) Direct current superposition method measurement circuit
CN107843819A (en) One kind insulation Withstand test device
CN203951163U (en) Low voltage failure detector
CN201903622U (en) Voltage resistance tester
CN206992687U (en) A kind of electrical management device based on power line communication technology
Chen et al. Arcing current features extraction using wavelet transform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091216

Termination date: 20120310