CN202359864U - Concrete electric pole assembled by sections and provided with internal connection flanges - Google Patents

Concrete electric pole assembled by sections and provided with internal connection flanges Download PDF

Info

Publication number
CN202359864U
CN202359864U CN2011205115713U CN201120511571U CN202359864U CN 202359864 U CN202359864 U CN 202359864U CN 2011205115713 U CN2011205115713 U CN 2011205115713U CN 201120511571 U CN201120511571 U CN 201120511571U CN 202359864 U CN202359864 U CN 202359864U
Authority
CN
China
Prior art keywords
electric pole
flange
pier nose
counterbore
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205115713U
Other languages
Chinese (zh)
Inventor
黄贺明
党智斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fogang Dragon Power Equipment Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011205115713U priority Critical patent/CN202359864U/en
Application granted granted Critical
Publication of CN202359864U publication Critical patent/CN202359864U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a concrete electric pole assembled by sections and provided with internal connection flanges, which comprises a plurality of electric pole sections. One ends or two ends of the electric pole sections are connected with the internal connection flanges; the external diameters of the internal connection flanges are the same as those of the electric pole sections; the side walls of the internal connection flanges are transversely provided with hollow cylinders, and the hollow cylinders are provided with ring-like inner grooves; one ends of the inner grooves are provided with flange plates, and the edges of the flange plate are dotted with a plurality of truncated counter holes; the outer ends of the inner grooves are provided with hung reinforcing plates, and the edges of the hung reinforcing plates are dotted with a plurality of truncated counter holes; the inner grooves are internally provided with a plurality of rib plates which are connected with the flanges plates and the hung reinforcing plates; one ends of reinforcing steel bars in the electric pole sections penetrate into the truncated counter holes of the hung reinforcing plates so as to connect with the hung reinforcing plates in an anchoring way after being treated; and every two electric pole sections are connected by bolts and the flange plates. The concrete electric pole is convenient to store, transport, assemble and disassemble, has good durability, is free from maintenance, is easy to assemble and does not rely on electricity supply.

Description

Connect the segmentation assembling concurrent of flange in a kind of being provided with
Technical field
The utility model relates to a kind of concurrent that is applied to transformer station or power transmission and transformation line, is specifically related to connect in a kind of being provided with the segmentation assembling concurrent of flange.
Background technology
China is used for the segmentation assembling concurrent of transformer station and power transmission and transformation line; The mode of taking to weld steel ring for a long time realizes connecting, promptly when concurrent is made, and the setting steel ring for connection in concurrent bar section one or both ends; The diameter of steel ring is identical with the diameter of electric pole; Structure reinforcing bars in steel ring and the concurrent is anchored through the heading form, when electric pole connects, adopts the steel ring of the segmentation electric pole that the electric welding mode fits together two need to weld together and gets final product.Though adopt said method to solve the packing problem of segmentation electric pole; But in assembling process; Align difficulty between the segmentation electric pole; Be prone to behind the welding assembly owing to align the problems such as rod end bending inaccurate, that welding deformation causes, and in unregulated powers such as mountain area are supplied with place during construction, the method for above-mentioned welding assembly can not realize.
In addition, adopt the mode of welding assembly, can burn out the anticorrosive coat of steel ring, remedy above-mentioned defective though can take to brush antifouling paint, the durability of antifouling paint has only 3~5 years usually, requires regularly to safeguard that the later stage operation cost is high.In addition, during later maintenance, need work high above the ground, antifouling paint is also brushed not in place unavoidably, is prone to stay the bad serious potential safety hazard of electric pole bar section antiseptic effect.
The utility model content
The utility model technical problem to be solved is: provide a kind of storage, carrying, segmentation easy to loading and unloading, that good endurance is non-maintaining, assembling simply and not relies on the electric power supply to assemble concurrent.
The utility model technical problem to be solved realizes through following scheme: the segmentation assembling concurrent that connects flange in a kind of being provided with; Comprise several electric pole bar sections; It is characterized in that: the one or both ends of described electric pole bar section are connected with and connect flange in said; Connect flange in said and be that external diameter is identical with said electric pole external diameter, laterally be provided with the hollow cylinder of an annular inner groovy on the sidewall; One end of said inner groovy is that flanged plate has several screws along edge distribution; The other end has several pier nose counterbores for hanging gusset along edge distribution; In said inner groovy, radially be provided with several and connect said flanged plate and the floor of hanging gusset, the pier nose counterbore that structure reinforcing bars one end in the said electric pole bar section penetrates on the said extension gusset is anchored with said extension gusset after heading is handled, and is connected with said flanged plate through bolt between the two electric pole bar sections.
The end shutoff that said structure reinforcing bars is handled through heading is in said pier nose counterbore.
The corresponding up and down and aperture of said screw and said pier nose counterbore is greater than said pier nose counterbore aperture (explain: the pier nose counterbore aperture of being mentioned among this paper refers to the aperture of pier nose counterbore path part), is convenient to structure reinforcing bars and passes said screw and carry out the pier nose processing.
The pier nose counterbore corresponding with each said screw is two and two and is arranged side by side along circular arc.It is different that the inner reinforcing bar of the electric pole of different class of loading is equipped with quantity, and two pier nose counterbores are set, and is convenient to adapt to the electric pole of different class of loading.
Described pier nose counterbore pore diameter range is Φ 5~Φ 7, and described screw pore diameter range is Φ 16~Φ 20.
Relative prior art the utlity model has following beneficial effect:
1) electric pole of the utility model is assembled by several electric pole bar sections, and electric pole bar segment length is lighter relatively than the short weight amount relatively, convenient in carrying; Is connected with flanged plate through bolt between the electric pole bar section of the utility model, connects the anticorrosive coat of flange in can not destroying, make the good endurance of whole electric pole, can avoid the periodic maintenance in later stage, and whole assembling process do not rely on supply of electric power, assemble simply and make things convenient for; In addition, it is identical with the electric pole external diameter to connect flange outer diameter in the utility model, and electric pole can parallelly be placed, and more helps storage, carrying, loading and unloading of said electric pole etc., and is difficult for causing the damage of electric pole;
2) the end shutoff handled through heading of structure reinforcing bars is in said pier nose counterbore, effectively protected structure reinforcing bars with in connect the safe of flange and be connected;
3) the corresponding up and down and aperture of screw and pier nose counterbore is more than or equal to pier nose counterbore aperture, makes things convenient for structure reinforcing bars to pass said screw and carries out pier nose and handle.
Description of drawings
Fig. 1 is for connecing the vertical view of flange in the utility model;
Fig. 2 is the sectional view along Fig. 1 A-A part;
Fig. 3 is the structural representation of the utility model;
Fig. 4 is the enlarged drawing of B part among Fig. 3.
The specific embodiment
Shown in Fig. 1 ~ 3, connect the segmentation assembling concurrent of flange in being provided with of the utility model, comprise several electric pole bar sections 1; Electric pole is assembled by several electric pole bar sections 1, and electric pole bar segment length is lighter relatively than the short weight amount relatively, convenient in carrying; Connect flange 2 in the one or both ends of electric pole bar section 1 are connected with, in connect flange 2 and be provided with through zinc-plated antiseptic top layer, in connect that flange 2 is identical with the electric pole external diameter for external diameter, laterally be provided with the hollow cylinder of an annular inner groovy 3 on the sidewall; In to connect flange 2 external diameters identical with the electric pole external diameter, electric pole can parallelly be placed, and more helps storage, carrying, loading and unloading of said electric pole etc.; And be difficult for causing the damage of electric pole, an end of inner groovy 3 is that flanged plate 4 has several screws 6 along edge distribution, and the other end has several pier nose counterbores 7 for hanging gusset 5 along edge distribution; In inner groovy 3, radially be provided with several adpting flange plates 4 and the floor 8 of hanging gusset 5, structure reinforcing bars 9 one ends in the electric pole bar section 1 penetrate the pier nose counterbore of hanging on the gusset 57 and after heading is handled, are anchored with hanging gusset 5, are connected with flanged plate 4 through bolt between the two electric pole bar sections 1; During the electric pole assembling, screw is aligned, the bolt of screwing on gets final product; Simple to site requirements, be connected with flanged plate 4 through bolt between the electric pole bar section 1, the burn that internally connects flange 2 zinc layers when having avoided welding destroys; Make the good endurance of whole electric pole, can avoid the periodic maintenance in later stage, and whole assembling process does not rely on supply of electric power; Assembling simply makes things convenient for, and is very suitable for the operation of mountain area and unregulated power supply environment.
As shown in Figure 4; Pier nose counterbore 7 comprises path part and large-diameter portion branch; The pier nose counterbore aperture of being mentioned among this paper refers to the aperture of pier nose counterbore path part; The end that structure reinforcing bars 9 is handled through heading can adopt the cement mortar shutoff in pier nose counterbore 7, effectively protected structure reinforcing bars with in connect the safe of flange and be connected.
As shown in Figure 1; Screw 6 and pier nose counterbore about in the of 7 corresponding and aperture more than or equal to pier nose counterbore 7 apertures; Being convenient to structure reinforcing bars 9 passes screw 6 and carries out pier nose and handle; Be two and two with each screw 6 corresponding pier nose counterbore 7 and be arranged side by side along circular arc that pier nose counterbore 7 pore diameter ranges are Φ 5~Φ 7, screw 6 pore diameter ranges are Φ 16~Φ 20.Usually the edge along flanged plate 4 evenly is provided with 6~12 screws 6, and corresponding edge along extension gusset 5 is provided with 6~12 pairs of pier nose counterbores 7.Floor 8 is evenly distributed on flanged plate 4 and hangs between the gusset 5, in the middle of the adjacent floor 8 screw 6 is set.
Connecing flange in the utility model adopts the mode of casting, turning or steel plate welding to be made the optional cast steel ZG270-500 of material, ZG310-500 or Q235~Q345.

Claims (5)

1. segmentation assembling concurrent that connects flange in being provided with; Comprise several electric pole bar sections; It is characterized in that: the one or both ends of described electric pole bar section are connected with and connect flange in said; Connect flange in said and be that external diameter is identical with said electric pole external diameter, laterally be provided with the hollow cylinder of an annular inner groovy on the sidewall; One end of said inner groovy is that flanged plate has several screws along edge distribution, and the other end has several pier nose counterbores for hanging gusset along edge distribution, in said inner groovy, radially is provided with several and connects said flanged plate and the floor of hanging gusset; The pier nose counterbore that structure reinforcing bars one end in the said electric pole bar section penetrates on the said extension gusset is anchored with said extension gusset after heading is handled, and is connected with said flanged plate through bolt between the two electric pole bar sections.
2. connect the segmentation assembling concurrent of flange in according to claim 1 being provided with, it is characterized in that: the end shutoff that said structure reinforcing bars is handled through heading is in said pier nose counterbore.
3. connect the segmentation assembling concurrent of flange in according to claim 2 being provided with; It is characterized in that: the corresponding up and down and aperture of said screw and said pier nose counterbore is more than or equal to said pier nose counterbore aperture, is convenient to structure reinforcing bars and passes said screw and carry out pier nose and handle.
4. connect the segmentation assembling concurrent of flange in according to claim 3 being provided with, it is characterized in that: the pier nose counterbore corresponding with each said screw is two and two and is arranged side by side along circular arc.
5. connect the segmentation assembling concurrent of flange in according to claim 4 being provided with, it is characterized in that: described pier nose counterbore pore diameter range is Φ 5~Φ 7, and described screw pore diameter range is Φ 16~Φ 20.
CN2011205115713U 2011-12-09 2011-12-09 Concrete electric pole assembled by sections and provided with internal connection flanges Expired - Lifetime CN202359864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205115713U CN202359864U (en) 2011-12-09 2011-12-09 Concrete electric pole assembled by sections and provided with internal connection flanges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205115713U CN202359864U (en) 2011-12-09 2011-12-09 Concrete electric pole assembled by sections and provided with internal connection flanges

Publications (1)

Publication Number Publication Date
CN202359864U true CN202359864U (en) 2012-08-01

Family

ID=46571058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205115713U Expired - Lifetime CN202359864U (en) 2011-12-09 2011-12-09 Concrete electric pole assembled by sections and provided with internal connection flanges

Country Status (1)

Country Link
CN (1) CN202359864U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979349A (en) * 2012-11-15 2013-03-20 浙江永达电力实业股份有限公司 Electric pole core
CN103590647A (en) * 2013-11-25 2014-02-19 国家电网公司 Power pole convenient and rapid to use
CN105089327A (en) * 2015-08-06 2015-11-25 国网山东宁津县供电公司 Sectional type electric pole assembling device, processing process and using method
CN107386762A (en) * 2017-09-14 2017-11-24 青海送变电工程公司 A kind of concurrent connected using High-strength flange plate
CN109404224A (en) * 2018-12-10 2019-03-01 重庆大学 It is a kind of based on edge put more energy into combined shell wind-powered electricity generation mix tower
CN110005252A (en) * 2019-04-02 2019-07-12 阜阳市嘉泰钢结构有限公司 A kind of reinforcing bar and flange quick links device
CN110860814A (en) * 2019-11-14 2020-03-06 云南电网有限责任公司电力科学研究院 Corrosion-resistant concrete sectional rod and manufacturing method thereof
CN114658280A (en) * 2022-03-30 2022-06-24 中桂电力设备有限公司 Concrete pole and mounting method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979349A (en) * 2012-11-15 2013-03-20 浙江永达电力实业股份有限公司 Electric pole core
CN103590647A (en) * 2013-11-25 2014-02-19 国家电网公司 Power pole convenient and rapid to use
CN105089327A (en) * 2015-08-06 2015-11-25 国网山东宁津县供电公司 Sectional type electric pole assembling device, processing process and using method
CN107386762A (en) * 2017-09-14 2017-11-24 青海送变电工程公司 A kind of concurrent connected using High-strength flange plate
CN109404224A (en) * 2018-12-10 2019-03-01 重庆大学 It is a kind of based on edge put more energy into combined shell wind-powered electricity generation mix tower
CN109404224B (en) * 2018-12-10 2024-06-18 重庆大学 Wind power mixing tower drum based on edge stiffening combined shell
CN110005252A (en) * 2019-04-02 2019-07-12 阜阳市嘉泰钢结构有限公司 A kind of reinforcing bar and flange quick links device
CN110860814A (en) * 2019-11-14 2020-03-06 云南电网有限责任公司电力科学研究院 Corrosion-resistant concrete sectional rod and manufacturing method thereof
CN114658280A (en) * 2022-03-30 2022-06-24 中桂电力设备有限公司 Concrete pole and mounting method thereof
CN114658280B (en) * 2022-03-30 2024-03-29 中桂电力设备有限公司 Concrete electric pole and installation method thereof

Similar Documents

Publication Publication Date Title
CN202359864U (en) Concrete electric pole assembled by sections and provided with internal connection flanges
CN104314776B (en) Assembled prestressed tower drum for offshore and onshore wind turbine generators
CN202467235U (en) Reinforcing device for concrete pole
CN104675139B (en) Concrete tube chamber structure Multi-point fastening reinforcement means
CN205776232U (en) A kind of rectangular cross section vertical shaft bent-arm concrete feeding-distribution device
CN205823552U (en) A kind of split blade type wind turbine tower
CN204823746U (en) Crane girder tip structure
CN204401628U (en) Large-span steel supports multidirectional connector
CN201679013U (en) Novel concrete prefabricating assembling tower crane foundation
CN216617752U (en) Novel split assembly type steel wind power tower connected by section steel flanges
CN203514323U (en) Connection component
CN203113871U (en) Inner flange assembled concrete pole
CN204531571U (en) The segmented cement electric pole of the pre-buried flange of a kind of cement electric pole and application thereof
CN212428270U (en) Concrete tower drum capable of replacing prestressed steel strands in vitro
CN206308705U (en) A kind of concrete assembled basis
CN203420270U (en) Fish belly sill part of foundation pit supporting and protecting inner support system
CN203393721U (en) Inner support main purlin component
CN202755982U (en) Hinged type needle beam
CN207110418U (en) A kind of railway pier top encloses hanging basket safe operation platform
CN206670375U (en) The compound necking plate of cement kiln preheaters smoke-box necking position multielement
CN205917847U (en) Steel structural system
CN203420271U (en) Purlin part
CN203420275U (en) Purline component
CN104097182A (en) Companion flange tightener
CN205985841U (en) Outdoor operating device of transformer substation case fixed knot constructs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: FOGANG LONGQING ELECTRIC POWER EQUIPMENT CO., LTD.

Free format text: FORMER OWNER: HUANG HEMING

Effective date: 20150403

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518033 SHENZHEN, GUANGDONG PROVINCE TO: 511699 QINGYUAN, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150403

Address after: 511699 Liantang village, Fogang County, Qingyuan, Guangdong

Patentee after: Fogang Dragon Power Equipment Co., Ltd.

Address before: 518033 Guangdong city of Shenzhen province Futian District Whampoa court indihome garden 3A block 20A

Patentee before: Huang Heming

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120801