CN202359498U CN 201120496021 CN201120496021U CN202359498U CN 202359498 U CN202359498 U CN 202359498U CN 201120496021 CN201120496021 CN 201120496021 CN 201120496021 U CN201120496021 U CN 201120496021U CN 202359498 U CN202359498 U CN 202359498U
Authority
CN
China
Prior art keywords
anchor
prestressed
anchor box
reinforced concrete
outer sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120496021
Other languages
Chinese (zh)
Inventor
胡国伟
李承俊
王志峰
徐钦佩
党军
王晓明
李勇
吴士民
樊世川
张飞
徐雷
周秋来
王勇周
田军
陈光辉
张旭刚
万刚强
翟建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN 201120496021 priority Critical patent/CN202359498U/en
Application granted granted Critical
Publication of CN202359498U publication Critical patent/CN202359498U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the technical field of cable-stayed bridge construction, particularly relates to a prestressed end anchor box of a prestressed reinforced concrete cable support tower, and solves the problem of cross interferences among reinforcements, a prestressed end and a prestressed tendon at the position of the prestressed end caused by an anchor box of a traditional prestressed end. The prestressed end anchor box comprises an inner sleeve, an outer sleeve, an anchor backing plate and a protective cover plate, wherein the inner sleeve and the outer sleeve are welded on two sides of the anchor backing plate respectively, a through hole is arranged in the middle of the anchor backing plate, and the protective cover plate is mated on the end of the outer sleeve. According to the prestressed end anchor box of the prestressed reinforced concrete cable support tower, the influence of the prestressed end on regular reinforcements is reduced, the cuttings of the reinforcements are avoided, special module plates needn't be installed for post-period anchor seal, the volume of used concrete is small, the amount of work is small, and the construction prestressed end anchor box is easy to construct.

Description

A kind of prestressing force termination anchor case of prestressed reinforced concrete Sarasota
Technical field
The utility model belongs to the CONSTRUCTION OF CABLE-STAYED BRIDGE technical field, is specifically related to a kind of prestressing force termination anchor case of prestressed reinforced concrete Sarasota.
Background technology
On the prestressed reinforced concrete Sarasota of cable stayed bridge, the form that the prestressing force termination adopts anchor plate to combine with ground tackle need be provided with square in the end or doughnut case (anchor recess), and this anchor case (anchor recess) takies certain space on Sarasota.But; Because after applying prestressing force; The concrete local compressive stress in Sarasota prestressing force end is regional bigger than other, therefore, when the Sarasota structure design, closeer reinforcing bar need be set in the prestressing force end; Like this, just cause the reinforcing bar that prestressing force termination anchor case (anchor recess) locates and the presstressed reinforcing steel chiasma interference of prestressing force termination and prestressing force end.In traditional construction, generally take following measure: the plain bars that blocks prestressing force termination and presstressed reinforcing steel place; Simultaneously the reinforcing bar of truncated position is taked reinforcement measure, the problem that this measure exists is that the artificial governing factor in the construction is many, working procedure is complicated, has brought difficulty to site operation tissue and technical management; Simultaneously; This anchor case (anchor recess) need be with concrete with its sealing off and covering anchorage after pre-stress construction finishes, and anchor case (anchor recess) volume is bigger during sealing off and covering anchorage, dedicated templates need be set carry out sealing off and covering anchorage; The sealing off and covering anchorage technological requirement is high, and is long in time limit, investment is big.
Summary of the invention
The reinforcing bar that the utility model causes for the anchor case (anchor recess) that solves the traditional prestressed termination and the presstressed reinforcing steel chiasma interference of prestressing force termination and prestressing force end and the problem of blocking reinforcing bar, anchor case (anchor recess) large tracts of land sealing off and covering anchorage; Change the anchor case of traditional prestressed termination into have internal and external casing and anchor plate combination anchor case; The problem of having avoided the presstressed reinforcing steel chiasma interference at reinforcing bar and prestressing force anchor head and prestressing force anchor head place and having blocked reinforcing bar; Simplify the pre-stress construction process simultaneously, a kind of prestressing force termination anchor case of prestressed reinforced concrete Sarasota is provided.
The utility model adopts following technical scheme to realize:
The prestressing force termination anchor case of prestressed reinforced concrete Sarasota; It is characterized in that comprising inner sleeve, outer sleeve, anchor plate and protective cover plate; Inner sleeve and outer sleeve are welded in the anchor plate both sides respectively, have through hole in the middle of the anchor plate, and protective cover plate is matched in the termination of outer sleeve.
The utlity model has following beneficial effect: the anchor case that (1) has internal and external casing and anchor plate integrates anchor plate, the anchor case (anchor recess) of traditional prestressed termination; The diameter of anchor case inside and outside sleeve is little; Can not adjust rebar spacing or suitably adjust and get final product; And can reduce the influence of end, avoid reinforcing bar to block plain bars; (2) it is long-pending little to have an anchor casing of internal and external casing and anchor plate, and the later stage sealing off and covering anchorage need not be installed dedicated templates, and used concrete square amount is few, and workload is little, is easy to construction.
Description of drawings
Fig. 1 is prestress system assembling sketch map
Fig. 2 is a prestress system stretching process sketch map
Fig. 3 is prestress system construction finishing back sketch map
Fig. 4 is the sketch map of the utility model
Fig. 5 is the prestressing steel wire bunch sketch map that has the termination anchor
Straight line sketch map when Fig. 6 installs for the anchor case
Arrangement of curves sketch map when Fig. 7 installs for the anchor case
Fig. 8 is the anchor case sketch map that mounting reinforcing steel bars is directly dodged on Sarasota
Fig. 9 has bent the sketch map of dodging for anchor case mounting reinforcing steel bars on Sarasota
Among the figure: 1-outer sleeve, 2-anchor plate, 3-inner sleeve, 4-anchor ring, 5-nut, 6-prestressing steel wire bunch; The 7-intermediate plate, 8-mud jacking hole, 9-indented bars, 10-bellows, 11-prestress pipe, 12-protective cover plate; 13-Sarasota concrete surface, 14-tension rod, 15-stretch-draw anchoring part, 16-jack, 17-tension ground tackle, 18-sealing off and covering anchorage concrete; 19-sealing off and covering anchorage reinforced mesh, 20-reinforcing bar, 21-bent-up bar, 22-anchor case, 23-Sarasota concrete.
The specific embodiment
The prestressing force termination anchor case of prestressed reinforced concrete Sarasota; Comprise inner sleeve 3, outer sleeve 1, anchor plate 2 and protective cover plate 12; Inner sleeve 3 is welded in anchor plate 2 both sides respectively with outer sleeve 1, has through hole in the middle of the anchor plate 2, and protective cover plate 12 is matched in the termination of outer sleeve 1.
Use the installation and the method for using of the cable stayed bridge steel concrete Sarasota prestress system of the utility model completion, step is following:
(1) prestress system is prefabricated
The prestress system that adopts prestressing steel wire bunch to combine with the pier nose anchor, the anchor ring of pier nose anchor and nut are prefabricated in advance, and prestressing steel wire bunch, pier nose anchor and the bellows that is through on the prestressing steel wire bunch are carried out integral installation.
Prestressing steel wire bunch all requires accurately the calculating and the blanking of cutting length, and error is ± 10mm; Each root steel wire length difference is not more than 1/5000 of steel wire length in the steel tendon, and is not more than 5mm; The steel tendon of accomplishing blanking is after the anchor cup of pier nose anchor is installed in the stock ground down, and accurately cutting is neat with emery wheel; When adopting integral installation, bellows is coaxial with the pier nose anchor.
(2) the anchor case is prefabricated
The anchor case is made up of inner sleeve, outer sleeve, middle part anchor plate and protective cover plate four parts with holes; Connect with weld seam between first three part; To guarantee during welding that anchor plate is injury-free; Protective cover plate is installed in the termination of outer sleeve after installed under prestressing is accomplished, be used to protect the anchor case not influenced by foreign material.The prestress system requirement will be satisfied in the internal diameter of inside and outside sleeve, the aperture of anchor plate; The length of inside and outside sleeve will meet the prestress system requirement; The thickness of anchor plate is wanted to carry the prestressed stretch-draw value; The termination shape of outer sleeve will be complementary with the Sarasota face.The anchor case carries out prefabricated in factory.
(3) measure also setting-out anchor case position
Design attitude by the anchor case carries out accurately measurement setting-out of three-dimensional at the scene, and the line identifier of going forward side by side for the reinforcing bar of anchor case place spacing less than the inside and outside sleeve diameter, is finely tuned, and concrete grammar is that reinforcing bar is bent.
(4) the anchor case is installed
According to measuring the setting-out identification point anchor case is installed, anchor plate is fixed on the works of periphery, places spiral reinforcement in advance in inner sleeve one side of anchor case, for the shaped form prestress system, should adjust the anchor case to design angle.
(5) prestressed system
Passing the anchor case with the supporting prestressing steel wire bunch system that has pier nose anchor and bellows of anchor case; Wherein, Bellows is through on the inner sleeve, is fixed and seals with plastic adhesive tape, and anchor ring is fixed on the anchor plate with nut; So far accomplish prestress system and install, protective cover plate is installed in the end of last sleeve outside.
(6) prestressed stretch-draw and mud jacking
Adopt the prestressed stretch-draw jack and the stretch-draw anchoring part that are complementary with prestressing steel wire bunch pier nose anchor to carry out stretch-draw, after stretch-draw finishes, carry out the prestress pipe mud jacking through the mud jacking hole that the pier nose anchor is reserved.
(8) waterproof and sealing off and covering anchorage
After mud jacking finishes, carry out pier nose anchor waterproofing work, carry out sealing off and covering anchorage then.

Claims (1)

1. the prestressing force termination anchor case of a prestressed reinforced concrete Sarasota; It is characterized in that comprising inner sleeve (3), outer sleeve (1), anchor plate (2) and protective cover plate (12); Inner sleeve (3) and outer sleeve (1) are welded in anchor plate (2) both sides respectively; Have through hole in the middle of the anchor plate (2), protective cover plate (12) is matched in the termination of outer sleeve (1).
CN 201120496021 2011-11-29 2011-12-03 Prestressed end anchor box of prestressed reinforced concrete cable support tower Expired - Lifetime CN202359498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120496021 CN202359498U (en) 2011-11-29 2011-12-03 Prestressed end anchor box of prestressed reinforced concrete cable support tower

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201120484791 2011-11-29
CN201120484791.1 2011-11-29
CN 201120496021 CN202359498U (en) 2011-11-29 2011-12-03 Prestressed end anchor box of prestressed reinforced concrete cable support tower

Publications (1)

Publication Number Publication Date
CN202359498U true CN202359498U (en) 2012-08-01

Family

ID=46570694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120496021 Expired - Lifetime CN202359498U (en) 2011-11-29 2011-12-03 Prestressed end anchor box of prestressed reinforced concrete cable support tower

Country Status (1)

Country Link
CN (1) CN202359498U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223209A (en) * 2016-10-13 2016-12-14 沈阳市政集团有限公司 The buried anchor box of a kind of post-tensioned method prestressed concrete box beam construction and construction method
CN109838554A (en) * 2019-04-01 2019-06-04 济南大学 A kind of variable prestressing force tube structure of hoop type
CN117286892A (en) * 2023-08-16 2023-12-26 重庆大学 External prestress dangerous rock reinforcement method based on vine-like effect

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223209A (en) * 2016-10-13 2016-12-14 沈阳市政集团有限公司 The buried anchor box of a kind of post-tensioned method prestressed concrete box beam construction and construction method
CN106223209B (en) * 2016-10-13 2017-12-08 沈阳市政集团有限公司 A kind of buried anchor box and construction method of post-tensioned method prestressed concrete box beam construction
CN109838554A (en) * 2019-04-01 2019-06-04 济南大学 A kind of variable prestressing force tube structure of hoop type
CN117286892A (en) * 2023-08-16 2023-12-26 重庆大学 External prestress dangerous rock reinforcement method based on vine-like effect

Similar Documents

Publication Publication Date Title
CN102400441B (en) Method for installing and using cable-stayed bridge reinforced concrete cable tower prestressed system
CN105926669B (en) A kind of Construction Method of Metro Station
CN101929344B (en) Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint
CN205503146U (en) Novel supporting construction of shallow tunnel suitable for city sensitizing range
CN205313967U (en) Connection construction between precast pier and bearing platform
CN204098065U (en) A kind of can the precast assembly pipe gallery of stretch-draw in body
CN103437791B (en) The mounting method of buried water stop in a kind of tunnel lining trolley termination
CN101982643B (en) Tunnel prestressed concrete lining structure and construction procedure thereof
CN109184700B (en) Construction method for clamping rock in soft surrounding rock small-clear-distance tunnel stability
CN103374880B (en) The connecting structure of a kind of precast pier and cushion cap and dock construction method thereof
CN202359498U (en) Prestressed end anchor box of prestressed reinforced concrete cable support tower
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN110042756A (en) Bridge high tower construction method and its construction equipment
CN104963289A (en) Integral one-time pouring construction method of large-volume concrete for special-shaped pier stud
CN102808414B (en) Bonded post-tensioned prestressed anchoring construction method for cast-in-place concrete structure
CN109208642A (en) A kind of construction method of assembled under-traverse tunnel
CN104343214A (en) Bracket prefabricated reinforcement framework of pseudo-classic building, fabrication method of reinforcement framework, and construction method of reinforced concrete bracket of pseudo-classic building
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN103670452A (en) Installation structure and method for accurately positioning tunnel arch wall lining buried type water-stop belt
CN109853964A (en) A kind of construction method for steel construction armored concrete mixed structure
CN112144409A (en) Vase pier capping beam construction technology
CN205223839U (en) Bridge prefabrication stand and prefabricated bent cap slot -in type connection structure
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN107761580A (en) A kind of old pier stud rebuilding construction scheme of bridge
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120801

CX01 Expiry of patent term