CN202348129U - Lifting foundation pier - Google Patents
Lifting foundation pier Download PDFInfo
- Publication number
- CN202348129U CN202348129U CN 201120526047 CN201120526047U CN202348129U CN 202348129 U CN202348129 U CN 202348129U CN 201120526047 CN201120526047 CN 201120526047 CN 201120526047 U CN201120526047 U CN 201120526047U CN 202348129 U CN202348129 U CN 202348129U
- Authority
- CN
- China
- Prior art keywords
- foundation pier
- top board
- screw rod
- lower platen
- support bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to the technical field of foundation piers for regulating height in a petroleum drilling industry, and relates to a lifting foundation pier. The lifting foundation pier comprises a left support rod, a right support rod, a foundation pier, an upper pressing plate and a lower pressing plate, wherein the lower parts of the left support rod and the right support rod are vertically and fixedly arranged inside the foundation pier; the upper pressing plate and the lower pressing plate which can be regulated in the vertical direction are fixedly arranged between the upper parts of the left support rod and the right support rod by a fastening piece; semicircles which are opposite to each other are arranged on the middle parts of the upper pressing plate and the lower pressing plate; and lifting hooks are fixedly arranged on two corresponding sides of the upper part of the foundation pier. The lifting foundation pier has a reasonable and compact structure and is convenient to use, and the height of a stiff pipe can be regulated conveniently without filling by fixedly arranging the upper pressing plate and the lower pressing plate which can be regulated in the vertical direction, so that the workload is reduced, and the installation efficiency of the stiff pipe is improved.
Description
Technical field
the utility model relates to regulates the height devices technical field of tools in the oil drilling industry, be a kind of ascending/decending foundation pier.
Background technology
relate to many pipelines in the oil drilling industry; Wherein most of pipelines require to use hard tubes, and all kinds of connecting lines of using such as blowout prevention pipeline, relief line, formation testing pipeline and controlled pressure drilling etc. usually need be regulated the height of each pipeline in the process that connects these pipelines; So that alignment flange dish or by appointing; If use common foundation pier, regulating height can only be by digging dark or raising foundation pier bottom, and field practice shows; Adopt this kind mode can increase extensive work amount, time and effort consuming.
Summary of the invention
the utility model provides a kind of ascending/decending foundation pier, has overcome the deficiency of above-mentioned prior art, and it can effectively solve the problem that common foundation pier is regulated height complicated operation effort.
The technical scheme of
the utility model realizes through following measure: a kind of ascending/decending foundation pier comprises left support bar, right support bar, foundation pier, top board and lower platen; The bottom of a left side support bar and right support bar vertical fixing respectively is installed in the inside of foundation pier; Between the top of a left side support bar and right support bar through securing member be installed with can up-down adjustment top board and lower platen; There is relative semicircle at the middle part of top board and lower platen, is installed with suspension hook respectively in the corresponding both sides on foundation pier top.
Be to the further optimization of above-mentioned utility model technical scheme below or/and improve:
above-mentioned left support bar can comprise the left screw rod and the left body of rod; Right support bar comprises the right screw rod and the right body of rod; The lower end of left side screw rod and the upper end of the left body of rod are fixed together; The lower end of right screw rod and the upper end of the right body of rod are fixed together, and on left screw rod and the right screw rod screw thread are arranged respectively, and securing member comprises upper left clamp nut, left lower compression nut, upper right clamp nut and bottom right clamp nut; The left part of top board and right part have circular hole respectively; The left part and the right part of corresponding lower platen have circular hole respectively, and the circle hole sleeve of top board and lower platen left part is contained on the left screw rod, is fixed with upper left clamp nut and left lower compression nut on the left screw rod of the upside of the top board of the left part of top board and lower platen and the downside of lower platen respectively; The circle hole sleeve of top board and lower platen right part is contained on the right screw rod, is fixed with upper right clamp nut and bottom right clamp nut on the right screw rod of the upside of the top board of the right part of top board and lower platen and the downside of lower platen respectively.
above-mentioned foundation pier the outside can be installed with fender bracket, be installed with suspension hook respectively in corresponding both sides, the top of fender bracket.
above-mentioned foundation pier is the cement foundation pier, and foundation pier is rectangular build, and it is long to be 60cm, and wide is 40cm, and height is 35cm.
the utility model reasonable and compact in structure, easy to use, through be installed with can up-down adjustment top board and lower platen, need not to fill the height that can regulate hard tube easily, reduced workload, improved the installation effectiveness of hard tube.
Description of drawings
accompanying drawing 1 is looked the sectional structure sketch map for the master of the utility model most preferred embodiment.
accompanying drawing 2 is the main TV structure sketch map of the utility model most preferred embodiment.
accompanying drawing 3 is the left TV structure sketch map of the utility model most preferred embodiment.
Coding in
accompanying drawing is respectively: 1 is foundation pier, and 2 is top board, and 3 is lower platen, and 4 is suspension hook; 5 is left screw rod, and 6 is the left body of rod, and 7 is right screw rod; 8 is the right body of rod, and 9 is upper left clamp nut, and 10 is left lower compression nut; 11 is upper right clamp nut, and 12 is the bottom right clamp nut, and 13 is fender bracket.
The specific embodiment
the utility model does not receive the restriction of following embodiment, can confirm concrete embodiment according to the technical scheme and the actual conditions of the utility model.
are in the utility model; For the ease of describing; The description of the relative position relation of each parts all is to describe according to the Butut mode of Figure of description 1, as: the position relation of forward and backward, upper and lower, left and right etc. is what to confirm according to the Butut direction of Figure of description.
Below in conjunction with embodiment and accompanying drawing the utility model is further described:
like accompanying drawing 1,2, shown in 3, this ascending/decending foundation pier comprises left support bar, right support bar, foundation pier 1, top board 2 and lower platen 3; The bottom of a left side support bar and right support bar vertical fixing respectively is installed in the inside of foundation pier 1; Between the top of a left side support bar and right support bar through securing member be installed with can up-down adjustment top board 2 and lower platen 3; There is relative semicircle at the middle part of top board 2 and lower platen 3, is installed with suspension hook 4 respectively in the corresponding both sides on foundation pier 1 top.Top board 2 can be according to the pressing plate of the hard tube size selection corresponding size of being fixed with lower platen 3.
Can according to actual needs above-mentioned ascending/decending foundation pier be done further to optimize or/and improve:
are like accompanying drawing 1,2, shown in 3; Left side support bar comprises the left screw rod 5 and the left body of rod 6; Right support bar comprises the right screw rod 7 and the right body of rod 8; The lower end of left side screw rod 5 and the upper end of the left body of rod 6 are fixed together; The lower end of right screw rod 7 and the upper end of the right body of rod 8 are fixed together, and on left screw rod 5 and the right screw rod 7 screw thread are arranged respectively, and securing member comprises upper left clamp nut 9, left lower compression nut 10, upper right clamp nut 11 and bottom right clamp nut 12; The left part of top board 2 and right part have circular hole respectively; The left part and the right part of corresponding lower platen 3 have circular hole respectively, and the circle hole sleeve of top board 2 and lower platen 3 left parts is contained on the left screw rod 5, are fixed with upper left clamp nut 9 and left lower compression nut 10 respectively on the left screw rod 5 of the upside of the top board 2 of the left part of top board 2 and lower platen 3 and the downside of lower platen 3; The circle hole sleeve of top board 2 and lower platen 3 right parts is contained on the right screw rod 7, is fixed with upper right clamp nut 11 and bottom right clamp nut 12 respectively on the right screw rod 7 of the upside of the top board 2 of the right part of top board 2 and lower platen 3 and the downside of lower platen 3.When needs rising hard tube; Unscrew upper left clamp nut 9 and upper right clamp nut 11, regulate successively move on on upper left clamp nut 9, upper right clamp nut 11, top board 2, lower platen 3, left lower compression nut 10 and the bottom right clamp nut 12 need height, screw upper left clamp nut 9, upper right clamp nut 11, left lower compression nut 10 and bottom right clamp nut 12; When needs reduce hard tube; Unscrew left lower compression nut 10 and bottom right clamp nut 12; Regulating successively to move on on left lower compression nut 10, bottom right clamp nut 12, top board 2, lower platen 3, upper left clamp nut 9 and the upper right clamp nut 11 needs height, screw left lower compression nut 10, bottom right clamp nut 12, upper left clamp nut 9 and upper right clamp nut 11.
like accompanying drawing 1,2, shown in 3, foundation pier 1 external stability fender bracket 13 is installed, be installed with suspension hook 4 respectively in corresponding both sides, the top of fender bracket 13.
like accompanying drawing 1,2, shown in 3, foundation pier 1 is the cement foundation pier, and foundation pier 1 is rectangular build, and it is long to be 60cm, and wide is 40cm, and height is 35cm.Adopt the cement foundation pier to reduce cost.
above technical characterictic has constituted the most preferred embodiment of the utility model, and it has stronger compliance and best implementation result, can increase and decrease non-essential technical characterictic according to actual needs, satisfies the demand of different situations.
Claims (5)
1. an ascending/decending foundation pier is characterized in that comprising left support bar, right support bar, foundation pier, top board and lower platen; The bottom of a left side support bar and right support bar vertical fixing respectively is installed in the inside of foundation pier; Between the top of a left side support bar and right support bar through securing member be installed with can up-down adjustment top board and lower platen; There is relative semicircle at the middle part of top board and lower platen, is installed with suspension hook respectively in the corresponding both sides on foundation pier top.
2.
RootAccording to the described ascending/decending foundation pier of claim 1; It is characterized in that left support bar comprises the left screw rod and the left body of rod; Right support bar comprises the right screw rod and the right body of rod, and the lower end of left screw rod and the upper end of the left body of rod are fixed together, and the lower end of right screw rod and the upper end of the right body of rod are fixed together; On left side screw rod and the right screw rod screw thread is arranged respectively; Securing member comprises upper left clamp nut, left lower compression nut, upper right clamp nut and bottom right clamp nut, and the left part of top board and right part have circular hole respectively, and the left part of corresponding lower platen and right part have circular hole respectively; The circle hole sleeve of top board and lower platen left part is contained on the left screw rod; Be fixed with upper left clamp nut and left lower compression nut on the left screw rod of the upside of the top board of the left part of top board and lower platen and the downside of lower platen respectively, the circle hole sleeve of top board and lower platen right part is contained on the right screw rod, is fixed with upper right clamp nut and bottom right clamp nut on the right screw rod of the upside of the top board of the right part of top board and lower platen and the downside of lower platen respectively.
3. ascending/decending foundation pier according to claim 1 and 2 is characterized in that the external stability of foundation pier is equipped with fender bracket, is installed with suspension hook respectively in corresponding both sides, the top of fender bracket.
4. ascending/decending foundation pier according to claim 1 and 2 is characterized in that foundation pier is the cement foundation pier, and foundation pier is rectangular build, and it is long to be 60cm, and wide is 40cm, and height is 35cm.
5. ascending/decending foundation pier according to claim 3 is characterized in that foundation pier is the cement foundation pier, and foundation pier is rectangular build, and it is long to be 60cm, and wide is 40cm, and height is 35cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120526047 CN202348129U (en) | 2011-12-15 | 2011-12-15 | Lifting foundation pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120526047 CN202348129U (en) | 2011-12-15 | 2011-12-15 | Lifting foundation pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202348129U true CN202348129U (en) | 2012-07-25 |
Family
ID=46537138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120526047 Expired - Fee Related CN202348129U (en) | 2011-12-15 | 2011-12-15 | Lifting foundation pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202348129U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493770A (en) * | 2011-12-15 | 2012-06-13 | 中国石油集团西部钻探工程有限公司 | Lifting type corner foundation |
-
2011
- 2011-12-15 CN CN 201120526047 patent/CN202348129U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493770A (en) * | 2011-12-15 | 2012-06-13 | 中国石油集团西部钻探工程有限公司 | Lifting type corner foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201851785U (en) | Adjustable support device | |
CN102493770A (en) | Lifting type corner foundation | |
CN204588538U (en) | A kind of tower crane attached wall anchor fitting of novel improved | |
CN204358258U (en) | Airduct water pipe shares suspension bracket | |
CN202348129U (en) | Lifting foundation pier | |
CN210461945U (en) | Reinforcing apparatus for water conservancy pipeline laying | |
CN105673942A (en) | Groove top type pipeline hanger | |
CN206072546U (en) | Novel spring suspension and support | |
CN204358263U (en) | Trailing arm derrick type pipeline elevator | |
CN202790955U (en) | Hoisting support | |
CN204792352U (en) | Three -dimensional novel folder from top to bottom connection structure who rolls up iron core transformer | |
CN203639934U (en) | Pre-buried positioning device for equipment foundation bolt | |
CN204573340U (en) | A kind of filling support setting up filling pipeline on complex-terrain | |
CN208997476U (en) | A kind of pipe clamp | |
CN202769052U (en) | Pipeline movable cradle | |
CN204226838U (en) | The valve actuator support of removable tune | |
CN204692772U (en) | A kind of combination type supporting device for petroleum pipeline | |
CN210430791U (en) | A gallows combats earthquake convenient to improve space utilization | |
CN202302302U (en) | Support device | |
CN202658436U (en) | Drum washing machine damping bottom foot structure | |
CN205118450U (en) | Concrete pump pipe fixing device | |
CN201865586U (en) | Engineering machinery and mast base thereof | |
CN201661848U (en) | Adjustable fixed hinge | |
CN204626731U (en) | Adjustable cassette ceiling fixed mount | |
CN204151645U (en) | A kind of mix main building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120725 Termination date: 20161215 |
|
CF01 | Termination of patent right due to non-payment of annual fee |