CN202338257U - Continuous oil pipe drainage gas production sealing suspension integrated wellhead device - Google Patents
Continuous oil pipe drainage gas production sealing suspension integrated wellhead device Download PDFInfo
- Publication number
- CN202338257U CN202338257U CN2011204361354U CN201120436135U CN202338257U CN 202338257 U CN202338257 U CN 202338257U CN 2011204361354 U CN2011204361354 U CN 2011204361354U CN 201120436135 U CN201120436135 U CN 201120436135U CN 202338257 U CN202338257 U CN 202338257U
- Authority
- CN
- China
- Prior art keywords
- coiled tubing
- sealed
- control valve
- valve
- main control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a sealed integrated wellhead assembly that hangs of coiled tubing drainage gas production is sealed and is designed for solving the unmatched problem of the back suspension seal and former well head of going into under coiled tubing, connect gradually the main control valve promptly in the lower flange top, be equipped with slips and the sealed linkage of three way type of sealed packing element installation notch, conversion flange, reserve main control valve, little cross and test valve, make sealed linkage and well head realize the integral structure, make things convenient for hanging and sealing when coiled tubing goes down. After the coiled tubing is installed, the wellhead does not need to be reformed, the installation cost is reduced, the operation is convenient, the safety and the time are saved, and the labor intensity of operating personnel is reduced.
Description
Technical field
The utility model relates to the integrated wellhead assembly of a kind of coiled tubing water pumping gas production sealed suspension, belongs to the natural gas extraction equipment technical field.
Background technology
" small casing is as the gas production tubing string; the production later stage is lowered to 1 1/2 in sleeve pipe " coiled tubing is as new flow string to adopt 3 1/2 initial stage of production of the low pressure in some gas fields, gas stringer; For the hydrops gas well; 1 1/2 " coiled tubing has and takes liquid water pumping gas production effect continuously, can keep gas well and produce continuously and stably.At present, the wellhead assembly of field by using needs processing suspension hermetically-sealed construction separately after being lowered to coiled tubing, and suspension arrangement is a fixed structure, the situation of not matching can occur with former well head in using at the scene, has brought very big resistance to installation.In addition, adopt the non-integral well head, be lowered to coiled tubing after the well head height change, can can't normally connect with the pipeline that is connected before the well head, need transformed just and can resume production pipeline, can increase installation work intensity like this, delay well opening time.
Summary of the invention
The purpose of the utility model is to provide a kind of coiled tubing water pumping gas production sealed suspension integrated wellhead assembly, is a kind ofly need not transform the gas well mouth that well head can directly put into production after having descended coiled tubing.
The concrete technology contents of the utility model is following:
The integrated wellhead assembly of coiled tubing water pumping gas production sealed suspension is by upwards connecting to form successively with lower component: lower flange → main control valve → three way type sealed suspension device → crossover flange → subsequent use main control valve → little four-way → test valve; Three way type sealed suspension device is provided with the notch of settling hanger slips and cartridge, and three way type sealed suspension device side connects the subsequent use sleeve valve that is communicated with tube connector; Little four-way side connects the production gate valve that is communicated with tube connector, the control gas well is produced, and the tube connector other end connects produces control valve.
When before following coiled tubing, adopting the small casing gas production, the effect of main control valve is a control gas well switch.Owing to be provided with three way type sealed suspension device, so after being lowered to coiled tubing, shaft collar need not implemented any change, and its installation notch can make the row installation again after coiled tubing puts in place of installation packing element and slips.In the production before being lowered to coiled tubing, do not have the oil jacket annular space, and after being lowered to coiled tubing, gas well forms the annular space between coiled tubing and sleeve pipe, at this moment, the production and the operation of this annular space are controlled by sleeve valve.When being lowered to coiled tubing, need to remove with crossover flange and with top, to install in this position then and be lowered to the device operation window, they are different with well head gate valve size, so, need to be lowered to the back at coiled tubing and connect well head with crossover flange.Because coiled tubing is lowered to through main control valve, causes main control valve can't operate the gas well switch, just replace operation by subsequent use main control valve this moment.
The sealed suspension device and the well head of the utility model coiled tubing are integrated, and make things convenient for suspension fashionable under the coiled tubing and sealing.After installing coiled tubing, need not transform well head, mounting cost reduces, operation is convenient, safety saves time, alleviates operating personnel's labour intensity.
Description of drawings
Accompanying drawing is the integrated wellhead assembly structural representation of coiled tubing water pumping gas production sealed suspension.
The specific embodiment
Embodiment:
Embodiment to the utility model further specifies with reference to accompanying drawing:
The integrated wellhead assembly of coiled tubing water pumping gas production sealed suspension is by upwards connecting successively with lower component: lower flange 1 → main control valve 2 → three way type sealed suspension device 3 → crossover flange 5 → subsequent use main control valve 6 → little four-way 7 → test valve 8; Three way type sealed suspension device 3 is provided with the notch 12 of settling hanger slips and cartridge, and three way type sealed suspension device 3 sides connect the subsequent use sleeve valve of connecting with tube connector 11 4; Little four-way 7 sides connect and production gate valve 9 tube connector 11 connections, that the control gas well is produced, and tube connector 11 other ends connect produces control valve 10.
The utility model installation process is following:
(1) close main control valve 2, produce metering pin valve 10, open subsequent use main control valve 6, produce valve 7, bleed off gas in the wellhead assembly through testing valve 8;
(2) crossover flange 5 with produce the valve 9 places connecting bolt of dismantling, pull down from well head with crossover flange and with top (comprise and produce valve 9);
(3) coiled tubing is installed on sealed suspension crust of the device top and is lowered to device, order is operation window, blowout preventer, injection head successively;
(4) through the coiled tubing car, be lowered to coiled tubing to projected depth;
(5) be lowered to cartridge and suspension slips to sealed suspension device shell 3 inner appropriate positions from operation window, confirm that suspension is normal;
(6) adopt the coiled tubing hydraulic cutting device to cut off coiled tubing; Remove well head successively and transfer applications of coiled tubing unit injection head, blowout preventer and operation window; 20 centimetres place more than the sealed suspension device cuts off coiled tubing with pipe cutter again, and coiled tubing is gone up suspension and fixing;
The well head of (7) dismantling before will constructing partly recovers to be installed on the well head that is lowered to behind the coiled tubing;
(8) close subsequent use sleeve valve 4, test valve 8, produce valve 9; Open subsequent use main control valve 6; Adopt nitrogen supercharging vehicle or natural gas boosting car to connect, toward inner injecting gas of coiled tubing and supercharging, until destroying coiled tubing bottom blanking plug from little four-way 7;
(9) close subsequent use main control valve 6, shed little four-way internal pressure, remove nitrogen supercharging vehicle, recover little four-way plug
(10) open successively subsequent use main control valve 6, produce valve 9, again through producing control valve 10 opening well and making production.
Claims (1)
1. integrated wellhead assembly of coiled tubing water pumping gas production sealed suspension is characterized in that:
The integrated wellhead assembly of coiled tubing water pumping gas production sealed suspension is by upwards connecting to form successively with lower component: lower flange (1) → main control valve (2) → three way type sealed suspension device (3) → crossover flange (5) → subsequent use main control valve (6) → little four-way (7) → test valve (8); Three way type sealed suspension device (3) is provided with the notch (12) of settling hanger slips and cartridge, and three way type sealed suspension device (3) side connects the subsequent use sleeve valve of connecting with tube connector (11) (4); Little four-way (7) side connects the production gate valve of connecting with tube connector (11), the control gas well is produced (9), and tube connector (11) other end connects produces control valve (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204361354U CN202338257U (en) | 2011-11-07 | 2011-11-07 | Continuous oil pipe drainage gas production sealing suspension integrated wellhead device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204361354U CN202338257U (en) | 2011-11-07 | 2011-11-07 | Continuous oil pipe drainage gas production sealing suspension integrated wellhead device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202338257U true CN202338257U (en) | 2012-07-18 |
Family
ID=46486950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204361354U Expired - Fee Related CN202338257U (en) | 2011-11-07 | 2011-11-07 | Continuous oil pipe drainage gas production sealing suspension integrated wellhead device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202338257U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105089524A (en) * | 2014-05-14 | 2015-11-25 | 中国石油天然气股份有限公司 | Device and process method for lifting coiled tubing out under pressure |
CN109025901A (en) * | 2018-09-18 | 2018-12-18 | 中国石油集团西部钻探工程有限公司 | Wellhead assembly is opened between gas well automation |
CN109667560A (en) * | 2019-02-27 | 2019-04-23 | 江苏雄越石油机械设备制造有限公司 | A kind of safe and reliable gate valve well head |
CN112377136A (en) * | 2020-11-12 | 2021-02-19 | 中联煤层气有限责任公司 | Speed pipe blanking plug opening method and speed pipe communication method |
CN113266316A (en) * | 2021-07-02 | 2021-08-17 | 西安航空职业技术学院 | Gas production device and method for wellhead |
-
2011
- 2011-11-07 CN CN2011204361354U patent/CN202338257U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105089524A (en) * | 2014-05-14 | 2015-11-25 | 中国石油天然气股份有限公司 | Device and process method for lifting coiled tubing out under pressure |
CN109025901A (en) * | 2018-09-18 | 2018-12-18 | 中国石油集团西部钻探工程有限公司 | Wellhead assembly is opened between gas well automation |
CN109667560A (en) * | 2019-02-27 | 2019-04-23 | 江苏雄越石油机械设备制造有限公司 | A kind of safe and reliable gate valve well head |
CN112377136A (en) * | 2020-11-12 | 2021-02-19 | 中联煤层气有限责任公司 | Speed pipe blanking plug opening method and speed pipe communication method |
CN113266316A (en) * | 2021-07-02 | 2021-08-17 | 西安航空职业技术学院 | Gas production device and method for wellhead |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202338257U (en) | Continuous oil pipe drainage gas production sealing suspension integrated wellhead device | |
CN202990942U (en) | Double-seal Christmas tree for conveniently mounting coiled tubing | |
CN103470239B (en) | A kind of continuous fracturing technology method of dragging with pressure | |
CN109630060A (en) | A kind of complete well operation tubing string of repeatable no killing well and construction technology | |
CN204646186U (en) | One can setting type underground check valve | |
CN201443330U (en) | Novel wellhead and oil-producing tree | |
CN102817594B (en) | Horizontal well water pumping gas production method and device | |
CN205445558U (en) | Novel double pump technology tubular column in pit | |
CN201129497Y (en) | Multifunctional pressure test ball valve | |
CN103452496B (en) | Integral type of adopting thick oil thermal extraction note automatically switches and produces joint | |
CN202937219U (en) | Lip type conical surface self-seal blowout-preventive well repair device | |
CN201778759U (en) | Underground tubing-casing annulus pressure-reducing device | |
CN201943646U (en) | Two-stage blowout prevention tool for oil well | |
CN109763787A (en) | A kind of device and its operating procedure of composite continuous oil pipe pulling submersible electric pump | |
CN203452759U (en) | Parallel double-tube steam injection wellhead device | |
CN203925432U (en) | A kind of production tree device | |
CN202745939U (en) | Coiled tubing hanger | |
CN202596695U (en) | Downhole gas-injection tubular column | |
CN201902190U (en) | Blowout prevention pressure testing device | |
CN202108480U (en) | Constant pressure gas discharge wellhead device of oil well sleeve | |
CN103291270B (en) | Jetting and fracturing pipe column and jetting and fracturing process | |
CN203868486U (en) | Foot valve with simple structure | |
CN201794557U (en) | Ultrasonic atomization drainer for gas well | |
CN203035169U (en) | Downhole fixed bypass restrictor | |
CN202228039U (en) | Ground hydraulic control cable packer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120718 Termination date: 20201107 |
|
CF01 | Termination of patent right due to non-payment of annual fee |